Permit #2018110060
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00050-0060 |
| CONDITIONED SPACE: 269 sqft |
| CONDITIONED SPACE: 2443 sqft |
| GARAGE: 764 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| OPENED PORCH (WITH ROOF) : 442 sqft |
| Total Square Footage: 4009 sqft |
| Block: 00050 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 863-420-2100 |
| Location Address: 16 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/27/2019 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
DAVID MILLER
| Status | Location Address | State License Number | Phone |
| CANCEL |
2659 MERCY DRIVE ORLANDO, FL 32808 |
06157 (Exp: 08/31/2024) | 407-466-6514 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 10/18/2019 | CANCELLED BY APPLICANT | JMONTARULI |
| ROW - FINAL APRON (AFTER POUR) | 10/17/2019 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 10/17/2019 | APPROVED | MWILLIAMS |
| U-CROSS CONNECTION | 10/17/2019 | APPROVED | MBACON |
| ROW - STORMWATER FINAL | 10/17/2019 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 10/17/2019 | FINAL APPROVED | MBACON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/16/2019 | APPROVED | KHOWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 10/16/2019 | APPROVED | KHOWELL |
| ELECTRIC - EARLY POWER | 09/25/2019 | APPROVED - AS NOTED | RMARTIN |
| TIE BEAM / LINTEL | 09/25/2019 | APPROVED | JDELBONIS |
| ROW- PRE-APRON (PRE-POUR) | 09/16/2019 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW- PAVER RESTRAINTS | 08/29/2019 | APPROVED | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 08/29/2019 | PARTIALLY APPROVED | KHOWELL |
| Note: SIDEWALK AND APRON POUR, PAVER UPPER | |||
| LATH/BRICK/ WATER BARRIER | 08/12/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 08/07/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: MISSING LATH IN REAR | |||
| INSULATION | 07/22/2019 | APPROVED | MWILLIAMS |
| ROOF VALLEY & METAL | 07/18/2019 | APPROVED | MWILLIAMS |
| U - SEWER TIE IN | 07/18/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 07/18/2019 | APPROVED | JGIBSON |
| ALL ROUGH | 07/17/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/13/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING | 06/11/2019 | APPROVED | MWILLIAMS |
| TIE BEAM / LINTEL | 05/24/2019 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC-TUG | 05/24/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 3:45 | |||
| TIE BEAM / LINTEL | 05/23/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. CLEARANCE FROM MASONRY (6TH EDITION) R606.3.4 MINIMUM WALL REINFORCING STEEL COVERAGE NOT MET (.75 INCH) 2. DOWN CELLS R609.1.4, ALL CELLS CONTAINING REINFORCEMENT SHALL BE GROUTED SOLID 3. missing vertical reinforcement and hook per plans (downrod) marked on plans | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/17/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 05/14/2019 | APPROVED | MWILLIAMS |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/10/2019 | APPROVED | JGIBSON |
| FOOTER | 04/24/2019 | APPROVED | MWILLIAMS |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 05/15/2019 | 05/17/2019 |
| Note: Released By: JHINDMAN Foundation S | |||
| URB | COMPLETE | 11/05/2018 | 11/13/2018 |
| Note: Released By: JBEAUDET | |||
| BLD | COMPLETE | 11/02/2018 | 11/09/2018 |
| Note: Released By: RLEE | |||
| ELEC | COMPLETE | 11/02/2018 | 11/06/2018 |
| Note: Released By: DREWIS | |||
| ENGIN1 | COMPLETE | 11/02/2018 | 11/07/2018 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 11/02/2018 | 11/09/2018 |
| Note: Released By: RLEE | |||
| PLUM | COMPLETE | 11/02/2018 | 11/09/2018 |
| Note: Released By: RLEE | |||
| SW1 | COMPLETE | 11/02/2018 | 11/06/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 11/02/2018 | 11/05/2018 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind. | |||
| ZON | COMPLETE | 11/02/2018 | 11/05/2018 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 08/23/2019 |
| REINSPECTION FEE | ¤40.00 | 08/23/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤708.00 | 03/27/2019 |
| SITE PLAN 20 | ¤20.00 | 03/27/2019 |
| SURCHARGE FS 533.721 | ¤17.07 | 03/27/2019 |
| SURCHARGE - FS 468.631 | ¤25.60 | 03/27/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/27/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 03/27/2019 |
| ADMIN FEE | ¤20.00 | 03/27/2019 |
| ELECTRIC FEE | ¤272.40 | 03/27/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 03/27/2019 |
| IMPACT FEE FIRE | ¤223.38 | 03/27/2019 |
| IMPACT FEE PARKS | ¤849.24 | 03/27/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/27/2019 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 03/27/2019 |
| MECHANICAL FEE | ¤272.40 | 03/27/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 03/27/2019 |
| PLAN CHECK FEE | ¤141.60 | 03/27/2019 |
| PLUMBING FEE | ¤272.40 | 03/27/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,441.48 |