I want to search for...

Permit #2018110429

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00050-0300
GARAGE: 705 sqft
OPENED PORCH (WITH ROOF) : 331 sqft
OPENED PORCH (WITH ROOF) : 72 sqft
CONDITIONED SPACE: 2632 sqft
Total Square Footage: 3740 sqft
Block: 00050
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 863-420-2100
Location Address: 5 NEW OAK LEAF DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/22/2019
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0300
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DAVID MILLER
Status Location Address State License Number Phone
CANCEL

2659 MERCY DRIVE

ORLANDO, FL 32808

06157 (Exp: 08/31/2024) 407-466-6514
TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/14/2020 FINAL APPROVED JDELBONIS
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 02/11/2020 Disapproved -FEE REQUIRED JDELBONIS
Note: bathroom has no power hood not finished and working no light at back door blower test not done yet
ROW - FINAL APRON (AFTER POUR) 12/17/2019 APPROVED MMAJEWSKI
ROW - STORMWATER FINAL 12/17/2019 APPROVED MMAJEWSKI
U -UTILITY RESIDENTIAL FINAL 12/17/2019 FINAL APPROVED LFITZGERALD
U-CROSS CONNECTION 12/17/2019 APPROVED LFITZGERALD
ELECTRIC - EARLY POWER 12/11/2019 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 2:50
FINAL SURVEY (OFFICE USE ONLY) 12/09/2019 APPROVED MMAJEWSKI
ROW FIELD SURVEY /GRADING CERTIFICATION 12/09/2019 APPROVED MMAJEWSKI
ELECTRIC - EARLY POWER 11/25/2019 Disapproved -FEE REQUIRED RMARTIN
Note: MEDIA PANEL 14-2 NOT SAFED OFF, WEST SIDE OF HOME OUTSIDE 12-2, BACK PORCH CONDUCTORS BY SINK, CEILING FANS NOT SAFED OFF
ROW- PRE-APRON (PRE-POUR) 09/19/2019 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
ROW- PAVER RESTRAINTS 09/13/2019 APPROVED - AS NOTED KHOWELL
Note: REPAIR WASH OUTS PRIOR TO POURING
ROW- PRE-APRON (PRE-POUR) 09/13/2019 PARTIALLY APPROVED KHOWELL
Note: SIDEWALK AND APRON POUR PAVER UPPER
U - SEWER TIE IN 08/15/2019 APPROVED JGIBSON
LATH/BRICK/ WATER BARRIER 08/15/2019 APPROVED MWILLIAMS
GRAVITY SEWER TEST 08/15/2019 APPROVED JGIBSON
INSULATION 08/08/2019 APPROVED MWILLIAMS
INSULATION 08/07/2019 CANCELLED BY APPLICANT WEB
GAS ROUGH 08/07/2019 APPROVED JGIBSON
INSULATION 08/06/2019 CANCELLED BY APPLICANT WEB
ALL ROUGH 08/02/2019 APPROVED - AS NOTED MWILLIAMS
Note: need to replace anchors for overhead garage door bucks. Bolts are bent and angled Unagle to securely fasten to CMU wall properly
ROOF VALLEY & METAL 07/18/2019 APPROVED MWILLIAMS
ELECTRIC-TUG 07/09/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED POWER 3:20
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/02/2019 APPROVED MWILLIAMS
ROOF SHEATHING 07/01/2019 APPROVED MWILLIAMS
TIE BEAM / LINTEL 06/18/2019 APPROVED MWILLIAMS
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 06/17/2019 CANCELLED BY APPLICANT MWILLIAMS
MONOLITHIC SLAB 05/01/2019 APPROVED MWILLIAMS
FOUND SURVEY APPROVED (OFFICE) 04/30/2019 APPROVED JHINDMAN
PLUMBING 1ST ROUGH UNDERGROUND 04/26/2019 APPROVED JGIBSON
FOOTER 04/11/2019 CANCELLED BY APPLICANT WEB
FOOTER 04/11/2019 APPROVED - AS NOTED WMILLER
Note: need permit placed by next inspection

Review History

Department Status Date In Date Out
SW1 COMPLETE 04/29/2019 04/30/2019
Note: Released By: JHINDMAN
ZON COMPLETE 02/08/2019 02/11/2019
Note: Released By: AMOBLEY
ZON HOLD 01/28/2019 01/29/2019
Note: Held By: AMOBLEY Side elevation page is still not matching the site,landscape and floor plan
ZON HOLD 01/09/2019 01/10/2019
Note: Held By: AMOBLEY Left Side Elevation page does not match the layout of the floor, site and landscape plans
URB COMPLETE 11/14/2018 11/29/2018
Note: Released By: JBEAUDET
BLD COMPLETE 11/13/2018 11/20/2018
Note: Released By: RLEE
ELEC COMPLETE 11/13/2018 11/16/2018
Note: Released By: DREWIS
ENGIN1 COMPLETE 11/13/2018 11/14/2018
Note: Released By: TBAKER
MECH COMPLETE 11/13/2018 11/20/2018
Note: Released By: RLEE
PLUM COMPLETE 11/13/2018 11/20/2018
Note: Released By: RLEE
SW1 COMPLETE 11/13/2018 11/16/2018
Note: Released By: DREWIS
UD1 COMPLETE 11/13/2018 11/16/2018
Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind
ZON HOLD 11/13/2018 11/14/2018
Note: Held By: AMOBLEY Must have banding around all windows and doors visible from public right of way Shrubs must wrap both corners of home Side Elevation page does not match the layout of the floor, site and landscape plans

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 02/11/2020
REINSPECTION FEE ¤40.00 11/25/2019
NEW RESIDENTIAL INSPECTIONS ¤674.00 02/22/2019
SITE PLAN 20 ¤20.00 02/22/2019
SURCHARGE FS 533.721 ¤16.35 02/22/2019
SURCHARGE - FS 468.631 ¤24.53 02/22/2019
STORM WATER PERMIT FEES ¤80.00 02/22/2019
3% TRANS IMPACT FEE CREDIT (¤89.43) 02/22/2019
ADMIN FEE ¤20.00 02/22/2019
ELECTRIC FEE ¤262.20 02/22/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 02/22/2019
IMPACT FEE FIRE ¤223.38 02/22/2019
IMPACT FEE PARKS ¤849.24 02/22/2019
IMPACT FEE SCHOOL ¤3,600.00 02/22/2019
IMPACT FEE TRANSPORTATION ¤2,981.00 02/22/2019
MECHANICAL FEE ¤262.20 02/22/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 02/22/2019
PLAN CHECK FEE ¤134.80 02/22/2019
PLUMBING FEE ¤262.20 02/22/2019
Fees Total Due: ¤0.00 Total Paid: ¤9,368.29