I want to search for...
Permit #2018110676
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00670-0050 |
| CONDITIONED SPACE: 1571 sqft |
| GARAGE: 443 sqft |
| OPENED PORCH (WITH ROOF) : 201 sqft |
| OPENED PORCH (WITH ROOF) : 46 sqft |
| Total Square Footage: 2261 sqft |
| Block: 00670 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: 407-307-4753 |
| Location Address: 12 RAE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/18/2019 |
| NOC: RECORDED |
| Applicant name: SHAWN VIRAG |
| Owner: DLP BRITE HOMES LLC |
|
Address 605 PALENCIA CLUB DRIVE ST AUGUSTINE, FL 32095 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤135,466.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SHAWNTELLE CONSULTING AND DESIGN LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
611 LARGOVISTA DR OAKLAND, FL 34787 |
CBC1261160 (Exp: 08/31/2020) | 407-307-4753 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/05/2020 | FINAL APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 02/05/2020 | APPROVED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 02/05/2020 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 02/04/2020 | Disapproved - NO FEE | MMAJEWSKI |
| Note: DIRT PULLED OUT OF PIPE WILL NEED TO BE REMOVED FROM SWALE | |||
| ROW - STORMWATER FINAL | 02/04/2020 | APPROVED | MMAJEWSKI |
| U -UTILITY RESIDENTIAL FINAL | 02/04/2020 | CANCELLED BY APPLICANT | LFITZGERALD |
| BLD - BUILDING FINAL | 02/04/2020 | Disapproved - NO FEE | FWILLIS |
| Note: Proof of Termite protection is needed. Termite Bond posted on Electrical panel. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/03/2020 | APPROVED | MMAJEWSKI |
| FINAL SURVEY (OFFICE USE ONLY) | 02/03/2020 | APPROVED | MMAJEWSKI |
| ELECTRIC - EARLY POWER | 07/16/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 3:50 | |||
| ROW- PRE-APRON (PRE-POUR) | 07/16/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: THE APPROVED SITE PLAN IS REQUIRED TO BE IN THE DOC BOX WITH THE SWALE SHEET FOR THIS INSPECTION. It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| U - SEWER TIE IN | 07/02/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 07/02/2019 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 05/29/2019 | APPROVED | WMILLER |
| INSULATION | 05/20/2019 | APPROVED | DROCKWELL |
| ALL ROUGH | 05/16/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/10/2019 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 05/10/2019 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/08/2019 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Complete exterior sheathing above entry/Provide solid blocking along flat-top trusses..7/16 OSB cannot exceed 24in O/C/Provide solid blocking at knee wall right of entry top and bottom for sheathing nailing | |||
| TIE BEAM / LINTEL | 04/24/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC-TUG | 04/24/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS INSPECTION IS ALREADY DONE | |||
| TIE BEAM / LINTEL | 04/18/2019 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: THIS IS A REINSPECTION letter needs to be approved by COPC and approved sheet must be on site at time of inspection...detail S11 shows steel in cells, no steel in cells on site. | |||
| TIE BEAM / LINTEL | 04/11/2019 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Raised block section at entry is not tied-in to house.Have engineer review plans and make corrections | |||
| ELECTRIC-TUG | 04/11/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 3:20 | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/10/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 04/01/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 03/19/2019 | Disapproved - NO FEE | MWILLIAMS |
| Note: THIS IS A REINSPECTION This slab does not meet minimum code or details shown on plan. Must have a minimum of 12" of footing below grade in compacted soil. This footer is only on average 6-8" below level of compaction. 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE… R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE (NEED ADDITIONAL COMPACTION REPORT FOR AREAS OUTSIDE OF FOOTINGS AFTER ADDING REQUIRED MINIMUM DEPTH) (SAME FOR 6TH EDITION) | |||
| MONOLITHIC SLAB | 03/07/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: NEED APPROVED REVISION ON SITE FOR FOUNDATION CALLS OUT TWO DIFFEREN T DETAILS FOR SAME FOOTINGS (15 ON 6.1 AND F1 ON FOUNDATION PAGE) DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL | |||
| MONOLITHIC SLAB | 03/07/2019 | Disapproved - NO FEE | WMILLER |
| Note: THIS IS A REINSPECTION FAILED EARLIER TODAY WITH THE FOLLOWING INFO: NEED APPROVED REVISION ON SITE FOR FOUNDATION CALLS OUT TWO DIFFEREN T DETAILS FOR SAME FOOTINGS (15 ON 6.1 AND F1 ON FOUNDATION PAGE) DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL BUT FORGOT TO INCLUDE THEAT A COMPACTION IS ALSO NEEDED FEE WAS CHARGED EARLIER THEREFOR IS NOT CHARGED AGAIN ON THIS ONE. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/25/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/05/2019 | 04/10/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 03/11/2019 | 03/18/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 01/07/2019 | 01/10/2019 |
| Note: Released By: RLEE | |||
| SWALE | COMPLETE | 01/02/2019 | 02/11/2019 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 12/26/2018 | 12/27/2018 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 12/26/2018 | 01/02/2019 |
| Note: Released By: TBAKER | |||
| UD1 | COMPLETE | 12/26/2018 | 01/02/2019 |
| Note: Released By: LFITZGERALD PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap | |||
| SW1 | HOLD | 12/26/2018 | 01/04/2019 |
| Note: Held By: JHINDMAN Provide addtional elevations measurements for storm water flow per City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300. Provide additional elevation measurements per Residential Florida Building Code R401.3 | |||
| ELEC | COMPLETE | 12/26/2018 | 01/04/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 11/20/2018 | 11/28/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 11/20/2018 | 11/27/2018 |
| Note: Held By: DREWIS Additional GFCI needed in the laundry area, NEC 2014 210.52F. Daniel Rewis 986-4736 | |||
| ENGIN1 | HOLD | 11/20/2018 | 11/26/2018 |
| Note: Held By: TBAKER NO BENCHMARK ON SURVEY | |||
| MECH | COMPLETE | 11/20/2018 | 11/28/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 11/20/2018 | 11/28/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 11/20/2018 | 11/27/2018 |
| Note: Held By: DREWIS Provide proposed survey elevations for stormwater flow in accordance with City of Palm Coast Tech. Manual Sec. 5 Eng. Standards 300. Provide proposed elevations for grade at the foundation wall and 10' away per Florida Building Code R401.3 Daniel Rewis 986-4736 | |||
| UD1 | HOLD | 11/20/2018 | 11/27/2018 |
| Note: Held By: LFITZGERALD PEP Panel not shown on electrical plans (Builder Electrical Plan - PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. Also-PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap | |||
| ZON | HOLD | 11/20/2018 | 11/20/2018 |
| Note: Held By: AMOBLEY Landscape plans writing is backwards. Please make legible with all required information...Please specify sod, specific trees and shrub types Foundation Plantings... a. Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. On corner lots, six (6) shrubs shall be planted on each side of the home facing a street, and (4) shrubs planted on the interior side of the home. When the rear yard of a home faces a saltwater canal, lake, or golf course, an additional four (4) shrubs shall be planted along the rear of the home. b. All of these required shrubs shall be planted between two and one-half (2 ½) and eight (8) feet of the home’s foundation. c. The corners of the house shall be wrapped with shrubbery or have an understory tree planted there. Shrubbery shall be selected using varying heights to accent and soften walls. Ac pad must be screened with at least two 7 gallon shrubs Please provide rear setback and total lot square footage on survey/site plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤406.00 | 01/18/2019 |
| SITE PLAN 20 | ¤20.00 | 01/18/2019 |
| SURCHARGE FS 533.721 | ¤10.73 | 01/18/2019 |
| SURCHARGE - FS 468.631 | ¤16.09 | 01/18/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/18/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 01/18/2019 |
| ELECTRIC FEE | ¤181.80 | 01/18/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 01/18/2019 |
| IMPACT FEE FIRE | ¤223.38 | 01/18/2019 |
| IMPACT FEE PARKS | ¤849.24 | 01/18/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/18/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 01/18/2019 |
| MECHANICAL FEE | ¤181.80 | 01/18/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/18/2019 |
| PLAN CHECK FEE | ¤81.20 | 01/18/2019 |
| PLUMBING FEE | ¤181.80 | 01/18/2019 |
| ADMIN FEE | ¤20.00 | 01/18/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,602.90 |