Permit #2018110677
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00230-0190 |
| CONDITIONED SPACE: 1875 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| OPENED PORCH (WITH ROOF) : 213 sqft |
| Total Square Footage: 2652 sqft |
| Block: 00230 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: 407-307-4753 |
| Location Address: 39 RYLAND DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/05/2019 |
| NOC: RECORDED |
| Applicant name: SHAWN VIRAG |
| Owner: BRITE PROPERTIES OF FLORIDA LLC |
|
Address 619 EAST WASHINGTON ORLANDO, FL 32801 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤147,646.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SHAWNTELLE CONSULTING AND DESIGN LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
611 LARGOVISTA DR OAKLAND, FL 34787 |
CBC1261160 (Exp: 08/31/2020) | 407-307-4753 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
Inspection History
| Type | Request Date | Result | Inspector |
| ELECTRIC - EARLY POWER | 03/19/2020 | APPROVED | BBEMBRY |
| ROW - FINAL APRON (AFTER POUR) | 10/29/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: CLEAN THE DIRT AND CONCRETE OUT OF THE CULVERT PIPE | |||
| ROW - STORMWATER FINAL | 10/29/2019 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 10/29/2019 | FINAL APPROVED | LFITZGERALD |
| BLD - BUILDING FINAL | 08/08/2019 | FINAL APPROVED | JDELBONIS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/25/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: REMOVE BAHIA AND INSTALL ST. AUGUSTINE ON RIGHT AND LEFT NEIGHBORING LOTS AND BLIND SOD IN TO MATCH EXISTING YARD ELEVATIONS | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/25/2019 | APPROVED | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 06/25/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. ON SITE WITH TOM WILL MAKE ADJUSTMENTS THAT WAS TALKED ABOUT PRIOR TO POURING CONCRETE | |||
| U - SEWER TIE IN | 05/14/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 05/14/2019 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 05/14/2019 | APPROVED | DROCKWELL |
| INSULATION | 05/03/2019 | APPROVED | DROCKWELL |
| ALL ROUGH | 04/30/2019 | APPROVED - AS NOTED | DROCKWELL |
| Note: Check master bath waste arm for proper pitch/Need 5ft head on sanitary....check at insulation | |||
| ROOF VALLEY & METAL | 04/11/2019 | APPROVED | DROCKWELL |
| ELECTRIC-TUG | 04/11/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 3:20 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/10/2019 | APPROVED - AS NOTED | DROCKWELL |
| Note: Strip downcell forms for viewing | |||
| ELECTRIC-TUG | 04/10/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: GROUND INSIDE METER IS NOT TIGHT, AS STATED ON PREVIOUS INSPECTION | |||
| ELECTRIC-TUG | 03/27/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: GROUND INSIDE METER IS NOT TIGHT, GFCI OUTLET BOX NEEDS TO BE SECURED | |||
| TIE BEAM / LINTEL | 03/27/2019 | APPROVED | MWILLIAMS |
| FOUND SURVEY APPROVED (OFFICE) | 03/26/2019 | APPROVED | RLEE |
| MONOLITHIC SLAB | 03/19/2019 | APPROVED - AS NOTED | DROCKWELL |
| Note: Prep the building pad properly before you begin formwork..FYI future pads. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/14/2019 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/13/2019 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NEED TO HAVE CITY APPROVED PLANS ON SITE FOR ALL INSPECTIONS, |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 03/20/2019 | 03/26/2019 |
| Note: Released By: RLEE Foundation S | |||
| BLD | COMPLETE | 03/11/2019 | 03/18/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 01/28/2019 | 01/28/2019 |
| Note: Released By: AMOBLEY | |||
| SWALE | COMPLETE | 01/09/2019 | 01/16/2019 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 01/07/2019 | 01/08/2019 |
| Note: Held By: AMOBLEY Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. Please specify shrub types and add additional shrubs along side. Should have at least 4 along the sides of home | |||
| ENGIN1 | COMPLETE | 01/07/2019 | 01/09/2019 |
| Note: Released By: TBAKER | |||
| UD1 | COMPLETE | 01/07/2019 | 01/14/2019 |
| Note: Released By: MBACON PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| SW1 | COMPLETE | 01/07/2019 | 01/11/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 01/07/2019 | 01/11/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 11/20/2018 | 11/28/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 11/20/2018 | 11/27/2018 |
| Note: Held By: DREWIS Additional GFCI needed in the laundry area, NEC 2014 210.52F. Daniel Rewis 986-4736 | |||
| ENGIN1 | HOLD | 11/20/2018 | 11/26/2018 |
| Note: Held By: TBAKER No benchmark on survey Wrong street name on survey | |||
| MECH | COMPLETE | 11/20/2018 | 11/28/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 11/20/2018 | 11/28/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 11/20/2018 | 11/27/2018 |
| Note: Held By: DREWIS Provide proposed survey elevations for stormwater flow in accordance with City of Palm Coast Tech. Manual Sec. 5 Eng. Standards 300. Provide proposed elevations for grade at the foundation wall and 10' away per Florida Building Code R401.3 Daniel Rewis 986-4736 | |||
| UD1 | HOLD | 11/20/2018 | 11/27/2018 |
| Note: Held By: LFITZGERALD PEP Panel not shown on electrical plans (Builder Electrical Plan - PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plans Also-PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap | |||
| ZON | HOLD | 11/20/2018 | 11/20/2018 |
| Note: Held By: AMOBLEY Foundation Plantings... a. Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. On corner lots, six (6) shrubs shall be planted on each side of the home facing a street, and (4) shrubs planted on the interior side of the home. When the rear yard of a home faces a saltwater canal, lake, or golf course, an additional four (4) shrubs shall be planted along the rear of the home. b. All of these required shrubs shall be planted between two and one-half (2 ½) and eight (8) feet of the home’s foundation. c. The corners of the house shall be wrapped with shrubbery or have an understory tree planted there. Shrubbery shall be selected using varying heights to accent and soften walls. Ac pad must be screened with 7 gallon shrubs Please provide rear setback and total lot square footage on survey/site plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤480.00 | 02/05/2019 |
| SITE PLAN 20 | ¤20.00 | 02/05/2019 |
| SURCHARGE FS 533.721 | ¤12.28 | 02/05/2019 |
| SURCHARGE - FS 468.631 | ¤18.42 | 02/05/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/05/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 02/05/2019 |
| ELECTRIC FEE | ¤204.00 | 02/05/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 02/05/2019 |
| IMPACT FEE FIRE | ¤223.38 | 02/05/2019 |
| IMPACT FEE PARKS | ¤849.24 | 02/05/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/05/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 02/05/2019 |
| MECHANICAL FEE | ¤204.00 | 02/05/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 02/05/2019 |
| PLAN CHECK FEE | ¤96.00 | 02/05/2019 |
| PLUMBING FEE | ¤204.00 | 02/05/2019 |
| ADMIN FEE | ¤20.00 | 02/05/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,722.18 |