Permit #2018110948

Permit Details

Status: COED

Parcel Id: 07-11-31-7031-00560-0100
CONDITIONED SPACE: 1571 sqft
GARAGE: 443 sqft
OPENED PORCH (WITH ROOF) : 201 sqft
OPENED PORCH (WITH ROOF) : 46 sqft
Total Square Footage: 2261 sqft
Block: 00560
Subdivision: 2166 - SECTION 31-ROYAL PALMS
Job Phone: 407-307-4753
Location Address: 19 RIVIERE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/25/2019
NOC: RECORDED
Applicant name: SHAWN VIRAG
Owner: BRITE PROPETIES OF FLORIDA LLC

Address

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

Lot: 0100
Contracted Stated Job Value: ¤135,466.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SHAWNTELLE CONSULTING AND DESIGN LLC
Status Location Address State License Number Phone
CANCEL

611 LARGOVISTA DR

OAKLAND, FL 34787

CBC1261160 (Exp: 08/31/2020) 407-307-4753

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
ELECTRIC - EARLY POWER 06/25/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED POWER 3:30
BLD - BUILDING FINAL 06/25/2019 FINAL APPROVED DROCKWELL
ROW - FINAL APRON (AFTER POUR) 06/25/2019 APPROVED KHOWELL
ROW - STORMWATER FINAL 06/25/2019 FINAL APPROVED KHOWELL
U -UTILITY RESIDENTIAL FINAL 06/25/2019 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 06/24/2019 APPROVED KHOWELL
FINAL SURVEY (OFFICE USE ONLY) 06/24/2019 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 06/21/2019 Disapproved - NO FEE KHOWELL
Note: SEE NOTES ON SURVEY
ELECTRIC - EARLY POWER 05/30/2019 Disapproved -FEE REQUIRED RMARTIN
Note: UFER GROUND CONNECTION NEEDS TO BE EXPOSED NEC 250.66 A
ROW- PRE-APRON (PRE-POUR) 05/29/2019 APPROVED - AS NOTED KHOWELL
Note: THIS IS A REINSPECTION ADJUST LEFT SIDE MITERED END SECTION, 2" OF CONCRETE REQUIRED OVER THE CULVERT OPENING. ADD FORM AT END SO CONCRETE DOES NOT GO INTO THE SWALE AREA. It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ROW- PRE-APRON (PRE-POUR) 05/24/2019 CANCELLED BY APPLICANT KHOWELL
GRAVITY SEWER TEST 05/03/2019 APPROVED JGIBSON
U - SEWER TIE IN 05/03/2019 APPROVED JGIBSON
INSULATION 04/12/2019 APPROVED DROCKWELL
LATH/BRICK/ WATER BARRIER 04/11/2019 APPROVED DROCKWELL
ALL ROUGH 04/05/2019 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
ALL ROUGH 04/04/2019 Disapproved -FEE REQUIRED MWILLIAMS
Note: Electrical work is incomplete. Electrician onsite. Has complete circuits to install and service entrance cable needs supported and strapped per code.
ROOF VALLEY & METAL 03/27/2019 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/25/2019 APPROVED - AS NOTED DROCKWELL
Note: Provide solid blocking along flat top trusses.7/16 OSB cannot exceed 24in o/c
TIE BEAM / LINTEL 03/12/2019 APPROVED MWILLIAMS
ELECTRIC-TUG 03/12/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED POWER 10:45
FOUND SURVEY APPROVED (OFFICE) 03/11/2019 APPROVED JHINDMAN
MONOLITHIC SLAB 03/04/2019 APPROVED JCOLASANTI
PLUMBING 1ST ROUGH UNDERGROUND 02/27/2019 APPROVED JGIBSON

Review History

Department Status Date In Date Out
BLD COMPLETE 03/11/2019 03/18/2019
Note: Released By: JHINDMAN
SW1 COMPLETE 03/06/2019 03/11/2019
Note: Released By: JHINDMAN Foundation S
SW1 COMPLETE 01/14/2019 01/22/2019
Note: Released By: JHINDMAN
SWALE COMPLETE 01/09/2019 01/29/2019
Note: Released By: TBAKER
ZON COMPLETE 01/03/2019 01/03/2019
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 01/03/2019 01/09/2019
Note: Released By: TBAKER
UD1 COMPLETE 01/03/2019 01/11/2019
Note: Released By: MBACON PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ELEC COMPLETE 01/03/2019 01/10/2019
Note: Released By: JHINDMAN
SW1 HOLD 01/03/2019 01/10/2019
Note: Held By: JHINDMAN Provide addtional elevations measurements for storm water flow per City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300. Provide additional elevation measurements per Residential Florida Building Code R401.3 2nd request
PLUM COMPLETE 01/03/2019 01/10/2019
Note: Released By: JHINDMAN
BLD COMPLETE 12/03/2018 12/10/2018
Note: Released By: JHINDMAN
ELEC HOLD 12/03/2018 12/06/2018
Note: Held By: DREWIS Provide load calcultions, NEC 2014 220. Provide a receptale, front left and rear bedrooms on switch wall, NEC 2014 210.52A. Additional GFCI needed in the laundry area, 210.52F Daniel Rewis 986-4736
ENGIN1 HOLD 12/03/2018 12/05/2018
Note: Held By: TBAKER No benchmark on survey
MECH COMPLETE 12/03/2018 12/10/2018
Note: Released By: JHINDMAN
PLUM HOLD 12/03/2018 12/10/2018
Note: Held By: JHINDMAN 1. Provide 3" minimum sanitary drain for master bathroom 6th ed. FBC R Table 3005.4.1. J. Hindman 986-3784.
SW1 HOLD 12/03/2018 12/06/2018
Note: Held By: DREWIS Provide addtional elevations measurements for storm water flow per City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300. Provide additional elevation measurements per Residential Florida Building Code R401.3 Daniel Rewis 986-4736
UD1 HOLD 12/03/2018 12/06/2018
Note: Held By: MBACON PEP Panel not shown on electrical plans PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
ZON HOLD 12/03/2018 12/03/2018
Note: Held By: AMOBLEY Additional shrubs will need to be planted at the rear of home since it faces a street Survey should have the total lot square footage

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 06/25/2019
REINSPECTION FEE ¤40.00 06/25/2019
REINSPECTION FEE ¤40.00 06/25/2019
NEW RESIDENTIAL INSPECTIONS ¤406.00 01/25/2019
SITE PLAN 20 ¤20.00 01/25/2019
SURCHARGE FS 533.721 ¤10.73 01/25/2019
SURCHARGE - FS 468.631 ¤16.09 01/25/2019
STORM WATER PERMIT FEES ¤80.00 01/25/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 01/25/2019
ELECTRIC FEE ¤181.80 01/25/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 01/25/2019
IMPACT FEE FIRE ¤223.38 01/25/2019
IMPACT FEE PARKS ¤849.24 01/25/2019
IMPACT FEE SCHOOL ¤3,600.00 01/25/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 01/25/2019
MECHANICAL FEE ¤181.80 01/25/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 01/25/2019
PLAN CHECK FEE ¤81.20 01/25/2019
PLUMBING FEE ¤181.80 01/25/2019
ADMIN FEE ¤20.00 01/25/2019
Fees Total Due: ¤0.00 Total Paid: ¤7,522.90