I want to search for...
Permit #2018110955
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00460-0010 |
| CONDITIONED SPACE: 1683 sqft |
| GARAGE: 558 sqft |
| OPENED PORCH (WITH ROOF) : 40 sqft |
| OPENED PORCH (WITH ROOF) : 214 sqft |
| Total Square Footage: 2495 sqft |
| Block: 00460 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: 407-307-4753 |
| Location Address: 18 RANCH WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/13/2019 |
| NOC: Unknown |
| Applicant name: SHAWN VIRAG |
| Owner: BRITE PROPERTIES OF FLORIDA LLC |
|
Address 7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤140,878.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SHAWNTELLE CONSULTING AND DESIGN LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
611 LARGOVISTA DR OAKLAND, FL 34787 |
CBC1261160 (Exp: 08/31/2020) | 407-307-4753 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/20/2019 | APPROVED | JDELBONIS |
| ROW - FINAL APRON (AFTER POUR) | 11/20/2019 | APPROVED | MMAJEWSKI |
| ROW - STORMWATER FINAL | 11/20/2019 | APPROVED | MMAJEWSKI |
| U -UTILITY RESIDENTIAL FINAL | 11/20/2019 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/19/2019 | APPROVED | MMAJEWSKI |
| FINAL SURVEY (OFFICE USE ONLY) | 11/19/2019 | APPROVED | MMAJEWSKI |
| ELECTRIC - EARLY POWER | 10/11/2019 | APPROVED - AS NOTED | RMARTIN |
| ROW- PRE-APRON (PRE-POUR) | 09/25/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 09/20/2019 | Disapproved -FEE REQUIRED | RGROSS |
| Note: NOT READY FOR INSPECTION. NOT COMPLETELY FORMED. | |||
| U - SEWER TIE IN | 07/18/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 07/18/2019 | APPROVED | JGIBSON |
| U-GRAVITY SEWER INSTALL/TESTING | 07/18/2019 | CANCELLED BY INSPECTOR | LFITZGERALD |
| Note: wrong inspection scheduled | |||
| ELECTRIC-TUG | 06/26/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 3:15 | |||
| LATH/BRICK/ WATER BARRIER | 06/25/2019 | APPROVED | DROCKWELL |
| PEP TANK INSTALLATION REQUEST | 06/25/2019 | APPROVED | CSTONE |
| Note: Once you request your pep tank we ask that you keep the site clear until the tank is in. You will have 72 hours after pep tank request has been approved to get the site ready. Site ready means area is clear without driveway, sod, paint, sidewalks, or irrigation in the way. If you have underground power where the pep tank will be located you will need to have that moved. | |||
| INSULATION | 06/17/2019 | APPROVED | MWILLIAMS |
| ALL ROUGH | 06/12/2019 | APPROVED | DROCKWELL |
| ROOF VALLEY & METAL | 06/04/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/31/2019 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/30/2019 | APPROVED | DROCKWELL |
| Note: Strap upper roof to trusses b elow/Provide solid blocking between trusses as so sheathing can be nailed to plan/Strap girder to post | |||
| TIE BEAM / LINTEL | 05/20/2019 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 05/17/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 05/09/2019 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/02/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 05/10/2019 | 05/17/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 03/01/2019 | 03/07/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 02/11/2019 | 02/18/2019 |
| Note: Held By: JHINDMAN 1. Provide a signed and sealed electrical plan ( page E1.0)or a plan signed by the electrical contractor with their license number. 6th ed. FBC 107.1. J. hindman 986-3784.2nd request | |||
| ZON | COMPLETE | 01/28/2019 | 01/28/2019 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 01/28/2019 | 01/28/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 01/28/2019 | 02/04/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 01/28/2019 | 02/04/2019 |
| Note: Held By: JHINDMAN 1. Provide a signed and sealed electrical plan or a plan signed by the electrical contractor with their license number. 6th ed. FBC 107.1. J. hindman 986-3784. | |||
| SW1 | COMPLETE | 01/28/2019 | 02/04/2019 |
| Note: Released By: JHINDMAN | |||
| SWALE | COMPLETE | 01/28/2019 | 03/01/2019 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 12/26/2018 | 12/27/2018 |
| Note: Held By: AMOBLEY Per The LDC chapter 13 - Section 13.03.03 C. Fenestration 1. Windowless exterior walls, excluding garage doors, that face a public right-of-way, golf course, canals, lakes, or other similar highly visible areas are prohibited. | |||
| ELEC | COMPLETE | 12/26/2018 | 01/04/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | HOLD | 12/26/2018 | 01/02/2019 |
| Note: Held By: TBAKER No benchmark on survey | |||
| UD1 | COMPLETE | 12/26/2018 | 01/02/2019 |
| Note: Released By: LFITZGERALD PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap | |||
| ZON | HOLD | 12/14/2018 | 12/14/2018 |
| Note: Held By: AMOBLEY Repeat comment: Survey should have total lot square footage Per The LDC chapter 13 - Section 13.03.03 C. Fenestration 1. Windowless exterior walls, excluding garage doors, that face a public right-of-way, golf course, canals, lakes, or other similar highly visible areas are prohibited. Foundation Plantings a. Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. On corner lots, six (6) shrubs shall be planted on each side of the home facing a street, and (4) shrubs planted on the interior side of the home. When the rear yard of a home faces a saltwater canal, lake, or golf course, an additional four (4) shrubs shall be planted along the rear of the home. b. All of these required shrubs shall be planted between two and one-half (2 ½) and eight (8) feet of the home’s foundation. c. The corners of the house shall be wrapped with shrubbery or have an understory tree planted there. Shrubbery shall be selected using varying heights to accent and soften walls. AC screening should be from the neighboring property side of the unit | |||
| ENGIN1 | HOLD | 12/14/2018 | 12/18/2018 |
| Note: Held By: TBAKER Site plan does not correspond with address of project | |||
| UD1 | HOLD | 12/14/2018 | 12/20/2018 |
| Note: Held By: LFITZGERALD Site plan does not correspond with project address Also please follow original comments PEP Panel not shown on electrical plans (Builder Electrical Plan PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan | |||
| SW1 | COMPLETE | 12/14/2018 | 12/18/2018 |
| Note: Released By: DREWIS | |||
| ELEC | HOLD | 12/14/2018 | 12/18/2018 |
| Note: Held By: DREWIS Provide an additional GFCI in the laundry area, NEC 2014 210.52F. Daniel Rewis 986-3782 | |||
| BLD | COMPLETE | 12/03/2018 | 12/10/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 12/03/2018 | 12/06/2018 |
| Note: Held By: DREWIS Provide a receptacle in rear left bedroom on the switch wall, NEC 2014 210.52A Provide an additional GFCI in the laundry area, NEC 2014 210.52F. Daniel Rewis 986-4736 | |||
| ENGIN1 | HOLD | 12/03/2018 | 12/05/2018 |
| Note: Held By: TBAKER No benchmark on survey | |||
| MECH | COMPLETE | 12/03/2018 | 12/10/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 12/03/2018 | 12/10/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 12/03/2018 | 12/06/2018 |
| Note: Held By: DREWIS Provide addtional elevations measurements for storm water flow per City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300. Provide additional elevation measurements per Residential Florida Building Code R401.3 Daniel Rewis 986-4736 | |||
| UD1 | HOLD | 12/03/2018 | 12/06/2018 |
| Note: Held By: MBACON PEP Panel not shown on electrical plans PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. | |||
| ZON | HOLD | 12/03/2018 | 12/04/2018 |
| Note: Held By: AMOBLEY Survey should have total lot square footage Per The LDC chapter 13 - Section 13.03.03 C. Fenestration 1. Windowless exterior walls, excluding garage doors, that face a public right-of-way, golf course, canals, lakes, or other similar highly visible areas are prohibited. Foundation Plantings a. Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. On corner lots, six (6) shrubs shall be planted on each side of the home facing a street, and (4) shrubs planted on the interior side of the home. When the rear yard of a home faces a saltwater canal, lake, or golf course, an additional four (4) shrubs shall be planted along the rear of the home. b. All of these required shrubs shall be planted between two and one-half (2 ½) and eight (8) feet of the home’s foundation. c. The corners of the house shall be wrapped with shrubbery or have an understory tree planted there. Shrubbery shall be selected using varying heights to accent and soften walls. AC screening should be from the neighboring property side of the unit |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 11/20/2019 |
| CONTRACTOR CHANGE | ¤40.00 | 08/13/2019 |
| ELECTRIC FEE | ¤192.00 | 03/13/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 03/13/2019 |
| IMPACT FEE FIRE | ¤223.38 | 03/13/2019 |
| IMPACT FEE PARKS | ¤849.24 | 03/13/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/13/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 03/13/2019 |
| MECHANICAL FEE | ¤192.00 | 03/13/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 03/13/2019 |
| PLAN CHECK FEE | ¤88.00 | 03/13/2019 |
| PLUMBING FEE | ¤192.00 | 03/13/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤440.00 | 03/13/2019 |
| SITE PLAN 20 | ¤20.00 | 03/13/2019 |
| SURCHARGE FS 533.721 | ¤11.44 | 03/13/2019 |
| SURCHARGE - FS 468.631 | ¤17.16 | 03/13/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/13/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 03/13/2019 |
| ADMIN FEE | ¤20.00 | 03/13/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,556.08 |