I want to search for...

Permit #2018110955

Permit Details

Status: COED

Parcel Id: 07-11-31-7030-00460-0010
CONDITIONED SPACE: 1683 sqft
GARAGE: 558 sqft
OPENED PORCH (WITH ROOF) : 40 sqft
OPENED PORCH (WITH ROOF) : 214 sqft
Total Square Footage: 2495 sqft
Block: 00460
Subdivision: 2154 - SECTION 30-ROYAL PALMS
Job Phone: 407-307-4753
Location Address: 18 RANCH WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/13/2019
NOC: Unknown
Applicant name: SHAWN VIRAG
Owner: BRITE PROPERTIES OF FLORIDA LLC

Address

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

Lot: 0010
Contracted Stated Job Value: ¤140,878.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SHAWNTELLE CONSULTING AND DESIGN LLC
Status Location Address State License Number Phone
CANCEL

611 LARGOVISTA DR

OAKLAND, FL 34787

CBC1261160 (Exp: 08/31/2020) 407-307-4753

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/20/2019 APPROVED JDELBONIS
ROW - FINAL APRON (AFTER POUR) 11/20/2019 APPROVED MMAJEWSKI
ROW - STORMWATER FINAL 11/20/2019 APPROVED MMAJEWSKI
U -UTILITY RESIDENTIAL FINAL 11/20/2019 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 11/19/2019 APPROVED MMAJEWSKI
FINAL SURVEY (OFFICE USE ONLY) 11/19/2019 APPROVED MMAJEWSKI
ELECTRIC - EARLY POWER 10/11/2019 APPROVED - AS NOTED RMARTIN
ROW- PRE-APRON (PRE-POUR) 09/25/2019 APPROVED RGROSS
Note: THIS IS A REINSPECTION
ROW- PRE-APRON (PRE-POUR) 09/20/2019 Disapproved -FEE REQUIRED RGROSS
Note: NOT READY FOR INSPECTION. NOT COMPLETELY FORMED.
U - SEWER TIE IN 07/18/2019 APPROVED JGIBSON
GRAVITY SEWER TEST 07/18/2019 APPROVED JGIBSON
U-GRAVITY SEWER INSTALL/TESTING 07/18/2019 CANCELLED BY INSPECTOR LFITZGERALD
Note: wrong inspection scheduled
ELECTRIC-TUG 06/26/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED POWER 3:15
LATH/BRICK/ WATER BARRIER 06/25/2019 APPROVED DROCKWELL
PEP TANK INSTALLATION REQUEST 06/25/2019 APPROVED CSTONE
Note: Once you request your pep tank we ask that you keep the site clear until the tank is in. You will have 72 hours after pep tank request has been approved to get the site ready. Site ready means area is clear without driveway, sod, paint, sidewalks, or irrigation in the way. If you have underground power where the pep tank will be located you will need to have that moved.
INSULATION 06/17/2019 APPROVED MWILLIAMS
ALL ROUGH 06/12/2019 APPROVED DROCKWELL
ROOF VALLEY & METAL 06/04/2019 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/31/2019 APPROVED JCOLASANTI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/30/2019 APPROVED DROCKWELL
Note: Strap upper roof to trusses b elow/Provide solid blocking between trusses as so sheathing can be nailed to plan/Strap girder to post
TIE BEAM / LINTEL 05/20/2019 APPROVED DROCKWELL
FOUND SURVEY APPROVED (OFFICE) 05/17/2019 APPROVED JHINDMAN
MONOLITHIC SLAB 05/09/2019 APPROVED DROCKWELL
PLUMBING 1ST ROUGH UNDERGROUND 05/02/2019 APPROVED JGIBSON

Review History

Department Status Date In Date Out
SW1 COMPLETE 05/10/2019 05/17/2019
Note: Released By: JHINDMAN
ELEC COMPLETE 03/01/2019 03/07/2019
Note: Released By: JHINDMAN
ELEC HOLD 02/11/2019 02/18/2019
Note: Held By: JHINDMAN 1. Provide a signed and sealed electrical plan ( page E1.0)or a plan signed by the electrical contractor with their license number. 6th ed. FBC 107.1. J. hindman 986-3784.2nd request
ZON COMPLETE 01/28/2019 01/28/2019
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 01/28/2019 01/28/2019
Note: Released By: TBAKER
BLD COMPLETE 01/28/2019 02/04/2019
Note: Released By: JHINDMAN
ELEC HOLD 01/28/2019 02/04/2019
Note: Held By: JHINDMAN 1. Provide a signed and sealed electrical plan or a plan signed by the electrical contractor with their license number. 6th ed. FBC 107.1. J. hindman 986-3784.
SW1 COMPLETE 01/28/2019 02/04/2019
Note: Released By: JHINDMAN
SWALE COMPLETE 01/28/2019 03/01/2019
Note: Released By: TBAKER
ZON HOLD 12/26/2018 12/27/2018
Note: Held By: AMOBLEY Per The LDC chapter 13 - Section 13.03.03 C. Fenestration 1. Windowless exterior walls, excluding garage doors, that face a public right-of-way, golf course, canals, lakes, or other similar highly visible areas are prohibited.
ELEC COMPLETE 12/26/2018 01/04/2019
Note: Released By: JHINDMAN
ENGIN1 HOLD 12/26/2018 01/02/2019
Note: Held By: TBAKER No benchmark on survey
UD1 COMPLETE 12/26/2018 01/02/2019
Note: Released By: LFITZGERALD PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap
ZON HOLD 12/14/2018 12/14/2018
Note: Held By: AMOBLEY Repeat comment: Survey should have total lot square footage Per The LDC chapter 13 - Section 13.03.03 C. Fenestration 1. Windowless exterior walls, excluding garage doors, that face a public right-of-way, golf course, canals, lakes, or other similar highly visible areas are prohibited. Foundation Plantings a. Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. On corner lots, six (6) shrubs shall be planted on each side of the home facing a street, and (4) shrubs planted on the interior side of the home. When the rear yard of a home faces a saltwater canal, lake, or golf course, an additional four (4) shrubs shall be planted along the rear of the home. b. All of these required shrubs shall be planted between two and one-half (2 ½) and eight (8) feet of the home’s foundation. c. The corners of the house shall be wrapped with shrubbery or have an understory tree planted there. Shrubbery shall be selected using varying heights to accent and soften walls. AC screening should be from the neighboring property side of the unit
ENGIN1 HOLD 12/14/2018 12/18/2018
Note: Held By: TBAKER Site plan does not correspond with address of project
UD1 HOLD 12/14/2018 12/20/2018
Note: Held By: LFITZGERALD Site plan does not correspond with project address Also please follow original comments PEP Panel not shown on electrical plans (Builder Electrical Plan PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan
SW1 COMPLETE 12/14/2018 12/18/2018
Note: Released By: DREWIS
ELEC HOLD 12/14/2018 12/18/2018
Note: Held By: DREWIS Provide an additional GFCI in the laundry area, NEC 2014 210.52F. Daniel Rewis 986-3782
BLD COMPLETE 12/03/2018 12/10/2018
Note: Released By: JHINDMAN
ELEC HOLD 12/03/2018 12/06/2018
Note: Held By: DREWIS Provide a receptacle in rear left bedroom on the switch wall, NEC 2014 210.52A Provide an additional GFCI in the laundry area, NEC 2014 210.52F. Daniel Rewis 986-4736
ENGIN1 HOLD 12/03/2018 12/05/2018
Note: Held By: TBAKER No benchmark on survey
MECH COMPLETE 12/03/2018 12/10/2018
Note: Released By: JHINDMAN
PLUM COMPLETE 12/03/2018 12/10/2018
Note: Released By: JHINDMAN
SW1 HOLD 12/03/2018 12/06/2018
Note: Held By: DREWIS Provide addtional elevations measurements for storm water flow per City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300. Provide additional elevation measurements per Residential Florida Building Code R401.3 Daniel Rewis 986-4736
UD1 HOLD 12/03/2018 12/06/2018
Note: Held By: MBACON PEP Panel not shown on electrical plans PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
ZON HOLD 12/03/2018 12/04/2018
Note: Held By: AMOBLEY Survey should have total lot square footage Per The LDC chapter 13 - Section 13.03.03 C. Fenestration 1. Windowless exterior walls, excluding garage doors, that face a public right-of-way, golf course, canals, lakes, or other similar highly visible areas are prohibited. Foundation Plantings a. Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. On corner lots, six (6) shrubs shall be planted on each side of the home facing a street, and (4) shrubs planted on the interior side of the home. When the rear yard of a home faces a saltwater canal, lake, or golf course, an additional four (4) shrubs shall be planted along the rear of the home. b. All of these required shrubs shall be planted between two and one-half (2 ½) and eight (8) feet of the home’s foundation. c. The corners of the house shall be wrapped with shrubbery or have an understory tree planted there. Shrubbery shall be selected using varying heights to accent and soften walls. AC screening should be from the neighboring property side of the unit

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 11/20/2019
CONTRACTOR CHANGE ¤40.00 08/13/2019
ELECTRIC FEE ¤192.00 03/13/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 03/13/2019
IMPACT FEE FIRE ¤223.38 03/13/2019
IMPACT FEE PARKS ¤849.24 03/13/2019
IMPACT FEE SCHOOL ¤3,600.00 03/13/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 03/13/2019
MECHANICAL FEE ¤192.00 03/13/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 03/13/2019
PLAN CHECK FEE ¤88.00 03/13/2019
PLUMBING FEE ¤192.00 03/13/2019
NEW RESIDENTIAL INSPECTIONS ¤440.00 03/13/2019
SITE PLAN 20 ¤20.00 03/13/2019
SURCHARGE FS 533.721 ¤11.44 03/13/2019
SURCHARGE - FS 468.631 ¤17.16 03/13/2019
STORM WATER PERMIT FEES ¤80.00 03/13/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 03/13/2019
ADMIN FEE ¤20.00 03/13/2019
Fees Total Due: ¤0.00 Total Paid: ¤7,556.08