Permit #2018110957
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00790-0140 |
| CONDITIONED SPACE: 1683 sqft |
| GARAGE: 558 sqft |
| OPENED PORCH (WITH ROOF) : 40 sqft |
| OPENED PORCH (WITH ROOF) : 214 sqft |
| Total Square Footage: 2495 sqft |
| Block: 00790 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 407-307-4753 |
| Location Address: 3 ROLLS ROYCE CT S |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/25/2019 |
| NOC: RECORDED |
| Applicant name: SHAWN VIRAG |
| Owner: BRITE PROPERTIES OF FLORIDA LLC |
|
Address 7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤140,878.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SHAWNTELLE CONSULTING AND DESIGN LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
611 LARGOVISTA DR OAKLAND, FL 34787 |
CBC1261160 (Exp: 08/31/2020) | 407-307-4753 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 06/18/2019 | FINAL APPROVED | KHOWELL |
| ROW - FINAL INSPECTION | 06/18/2019 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 06/17/2019 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 06/17/2019 | Disapproved - NO FEE | KHOWELL |
| Note: ASPHALT PATCH NEEDS TO BE COMPLETED PRIOR TO CALLING FOR INSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 06/17/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: ASPHALT PATCH NOT DONE YET WILL BE INSPECTED WITH THE R.O.W. FINAL | |||
| BLD - BUILDING FINAL | 06/17/2019 | FINAL APPROVED | DROCKWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 06/14/2019 | APPROVED | KHOWELL |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/14/2019 | APPROVED | KHOWELL |
| ELECTRIC - EARLY POWER | 05/29/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 3:30 | |||
| ROW- PRE-APRON (PRE-POUR) | 05/16/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ELECTRIC - EARLY POWER | 05/08/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 4:00 | |||
| GRAVITY SEWER TEST | 04/22/2019 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 04/22/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: VIDEO SENT BY PLUMBER OF U-TIE IN | |||
| LATH/BRICK/ WATER BARRIER | 04/08/2019 | APPROVED | DROCKWELL |
| INSULATION | 04/02/2019 | APPROVED - AS NOTED | MWILLIAMS |
| Note: this inspection was approved yesterday | |||
| ALL ROUGH | 04/01/2019 | APPROVED | DROCKWELL |
| INSULATION | 04/01/2019 | APPROVED - AS NOTED | MWILLIAMS |
| Note: DO NOT HANG ANY DRYWALL PRIOR TO INSULATION INSPECTION | |||
| ROOF VALLEY & METAL | 03/20/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/18/2019 | APPROVED | DROCKWELL |
| TIE BEAM / LINTEL | 03/11/2019 | APPROVED | MWILLIAMS |
| Note: per contractor | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/08/2019 | APPROVED | JHINDMAN |
| ELECTRIC-TUG | 03/08/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: CALLED FPL. RELEASE POWER 2:00 | |||
| MONOLITHIC SLAB | 03/07/2019 | CANCELLED BY INSPECTOR | WMILLER |
| Note: INSPECTION NOT NEEDED (ALREADY APPROVED BY INSPECTOR DR ON 2-28-2019 | |||
| MONOLITHIC SLAB | 02/28/2019 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/25/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/11/2019 | 03/18/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 03/04/2019 | 03/08/2019 |
| Note: Released By: JHINDMAN foundation | |||
| SWALE | COMPLETE | 01/17/2019 | 01/29/2019 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/14/2019 | 01/14/2019 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 01/14/2019 | 01/17/2019 |
| Note: Released By: TBAKER | |||
| ELEC | COMPLETE | 01/14/2019 | 01/22/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 01/14/2019 | 01/22/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | HOLD | 12/26/2018 | 12/27/2018 |
| Note: Held By: AMOBLEY Survey should provide rear setback | |||
| ENGIN1 | HOLD | 12/26/2018 | 01/02/2019 |
| Note: Held By: TBAKER IRon rods are not acceptable bench marks. See attached image outlining COPC site plan requirements. | |||
| SW1 | HOLD | 12/26/2018 | 01/04/2019 |
| Note: Held By: JHINDMAN Provide addtional elevations measurements for storm water flow per City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300. Provide additional elevation measurements per Residential Florida Building Code R401.3 2nd request | |||
| ELEC | HOLD | 12/26/2018 | 01/04/2019 |
| Note: Held By: JHINDMAN Receptacle neededn in back left bedroom, NEC 2014 210.52A still missing on switch side of the door. | |||
| BLD | COMPLETE | 12/03/2018 | 12/10/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 12/03/2018 | 12/06/2018 |
| Note: Held By: DREWIS Receptacle neededn in back left bedroom, NEC 2014 210.52A Additional GFCI needed in the laundry area, NEC 2014 210.52F Daniel Rewis 986-4736 | |||
| ENGIN1 | HOLD | 12/03/2018 | 12/05/2018 |
| Note: Held By: TBAKER No bench mark on survey | |||
| MECH | COMPLETE | 12/03/2018 | 12/10/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 12/03/2018 | 12/10/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 12/03/2018 | 12/06/2018 |
| Note: Held By: DREWIS Provide addtional elevations measurements for storm water flow per City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300. Provide additional elevation measurements per Residential Florida Building Code R401.3 Daniel Rewis 986-4736 | |||
| UD1 | COMPLETE | 12/03/2018 | 12/06/2018 |
| Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 12/03/2018 | 12/04/2018 |
| Note: Held By: AMOBLEY Survey should have total lot square footage Survey should provide front, rear and side setbacks from all adjacent properties |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 06/25/2019 |
| ELECTRIC FEE | ¤192.00 | 01/25/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 01/25/2019 |
| IMPACT FEE FIRE | ¤223.38 | 01/25/2019 |
| IMPACT FEE PARKS | ¤849.24 | 01/25/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/25/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 01/25/2019 |
| MECHANICAL FEE | ¤192.00 | 01/25/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/25/2019 |
| PLAN CHECK FEE | ¤88.00 | 01/25/2019 |
| PLUMBING FEE | ¤192.00 | 01/25/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤440.00 | 01/25/2019 |
| SITE PLAN 20 | ¤20.00 | 01/25/2019 |
| SURCHARGE FS 533.721 | ¤11.44 | 01/25/2019 |
| SURCHARGE - FS 468.631 | ¤17.16 | 01/25/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/25/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 01/25/2019 |
| ADMIN FEE | ¤20.00 | 01/25/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,516.08 |