Permit #2018110957

Permit Details

Status: COED

Parcel Id: 07-11-31-7032-00790-0140
CONDITIONED SPACE: 1683 sqft
GARAGE: 558 sqft
OPENED PORCH (WITH ROOF) : 40 sqft
OPENED PORCH (WITH ROOF) : 214 sqft
Total Square Footage: 2495 sqft
Block: 00790
Subdivision: 2155 - SECTION 32-ROYAL PALMS
Job Phone: 407-307-4753
Location Address: 3 ROLLS ROYCE CT S
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/25/2019
NOC: RECORDED
Applicant name: SHAWN VIRAG
Owner: BRITE PROPERTIES OF FLORIDA LLC

Address

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

Lot: 0140
Contracted Stated Job Value: ¤140,878.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SHAWNTELLE CONSULTING AND DESIGN LLC
Status Location Address State License Number Phone
CANCEL

611 LARGOVISTA DR

OAKLAND, FL 34787

CBC1261160 (Exp: 08/31/2020) 407-307-4753

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 06/18/2019 FINAL APPROVED KHOWELL
ROW - FINAL INSPECTION 06/18/2019 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 06/17/2019 FINAL APPROVED LFITZGERALD
ROW - FINAL INSPECTION 06/17/2019 Disapproved - NO FEE KHOWELL
Note: ASPHALT PATCH NEEDS TO BE COMPLETED PRIOR TO CALLING FOR INSPECTION
ROW - FINAL APRON (AFTER POUR) 06/17/2019 APPROVED - AS NOTED KHOWELL
Note: ASPHALT PATCH NOT DONE YET WILL BE INSPECTED WITH THE R.O.W. FINAL
BLD - BUILDING FINAL 06/17/2019 FINAL APPROVED DROCKWELL
FINAL SURVEY (OFFICE USE ONLY) 06/14/2019 APPROVED KHOWELL
ROW FIELD SURVEY /GRADING CERTIFICATION 06/14/2019 APPROVED KHOWELL
ELECTRIC - EARLY POWER 05/29/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED POWER 3:30
ROW- PRE-APRON (PRE-POUR) 05/16/2019 APPROVED - AS NOTED KHOWELL
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ELECTRIC - EARLY POWER 05/08/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED POWER 4:00
GRAVITY SEWER TEST 04/22/2019 APPROVED JGIBSON
U - SEWER TIE IN 04/22/2019 APPROVED - AS NOTED JGIBSON
Note: VIDEO SENT BY PLUMBER OF U-TIE IN
LATH/BRICK/ WATER BARRIER 04/08/2019 APPROVED DROCKWELL
INSULATION 04/02/2019 APPROVED - AS NOTED MWILLIAMS
Note: this inspection was approved yesterday
ALL ROUGH 04/01/2019 APPROVED DROCKWELL
INSULATION 04/01/2019 APPROVED - AS NOTED MWILLIAMS
Note: DO NOT HANG ANY DRYWALL PRIOR TO INSULATION INSPECTION
ROOF VALLEY & METAL 03/20/2019 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/18/2019 APPROVED DROCKWELL
TIE BEAM / LINTEL 03/11/2019 APPROVED MWILLIAMS
Note: per contractor
FOUND SURVEY APPROVED (OFFICE) 03/08/2019 APPROVED JHINDMAN
ELECTRIC-TUG 03/08/2019 APPROVED - AS NOTED RMARTIN
Note: CALLED FPL. RELEASE POWER 2:00
MONOLITHIC SLAB 03/07/2019 CANCELLED BY INSPECTOR WMILLER
Note: INSPECTION NOT NEEDED (ALREADY APPROVED BY INSPECTOR DR ON 2-28-2019
MONOLITHIC SLAB 02/28/2019 APPROVED DROCKWELL
PLUMBING 1ST ROUGH UNDERGROUND 02/25/2019 APPROVED JGIBSON

Review History

Department Status Date In Date Out
BLD COMPLETE 03/11/2019 03/18/2019
Note: Released By: JHINDMAN
SW1 COMPLETE 03/04/2019 03/08/2019
Note: Released By: JHINDMAN foundation
SWALE COMPLETE 01/17/2019 01/29/2019
Note: Released By: TBAKER
ZON COMPLETE 01/14/2019 01/14/2019
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 01/14/2019 01/17/2019
Note: Released By: TBAKER
ELEC COMPLETE 01/14/2019 01/22/2019
Note: Released By: JHINDMAN
SW1 COMPLETE 01/14/2019 01/22/2019
Note: Released By: JHINDMAN
ZON HOLD 12/26/2018 12/27/2018
Note: Held By: AMOBLEY Survey should provide rear setback
ENGIN1 HOLD 12/26/2018 01/02/2019
Note: Held By: TBAKER IRon rods are not acceptable bench marks. See attached image outlining COPC site plan requirements.
SW1 HOLD 12/26/2018 01/04/2019
Note: Held By: JHINDMAN Provide addtional elevations measurements for storm water flow per City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300. Provide additional elevation measurements per Residential Florida Building Code R401.3 2nd request
ELEC HOLD 12/26/2018 01/04/2019
Note: Held By: JHINDMAN Receptacle neededn in back left bedroom, NEC 2014 210.52A still missing on switch side of the door.
BLD COMPLETE 12/03/2018 12/10/2018
Note: Released By: JHINDMAN
ELEC HOLD 12/03/2018 12/06/2018
Note: Held By: DREWIS Receptacle neededn in back left bedroom, NEC 2014 210.52A Additional GFCI needed in the laundry area, NEC 2014 210.52F Daniel Rewis 986-4736
ENGIN1 HOLD 12/03/2018 12/05/2018
Note: Held By: TBAKER No bench mark on survey
MECH COMPLETE 12/03/2018 12/10/2018
Note: Released By: JHINDMAN
PLUM COMPLETE 12/03/2018 12/10/2018
Note: Released By: JHINDMAN
SW1 HOLD 12/03/2018 12/06/2018
Note: Held By: DREWIS Provide addtional elevations measurements for storm water flow per City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300. Provide additional elevation measurements per Residential Florida Building Code R401.3 Daniel Rewis 986-4736
UD1 COMPLETE 12/03/2018 12/06/2018
Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON HOLD 12/03/2018 12/04/2018
Note: Held By: AMOBLEY Survey should have total lot square footage Survey should provide front, rear and side setbacks from all adjacent properties

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 06/25/2019
ELECTRIC FEE ¤192.00 01/25/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 01/25/2019
IMPACT FEE FIRE ¤223.38 01/25/2019
IMPACT FEE PARKS ¤849.24 01/25/2019
IMPACT FEE SCHOOL ¤3,600.00 01/25/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 01/25/2019
MECHANICAL FEE ¤192.00 01/25/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 01/25/2019
PLAN CHECK FEE ¤88.00 01/25/2019
PLUMBING FEE ¤192.00 01/25/2019
NEW RESIDENTIAL INSPECTIONS ¤440.00 01/25/2019
SITE PLAN 20 ¤20.00 01/25/2019
SURCHARGE FS 533.721 ¤11.44 01/25/2019
SURCHARGE - FS 468.631 ¤17.16 01/25/2019
STORM WATER PERMIT FEES ¤80.00 01/25/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 01/25/2019
ADMIN FEE ¤20.00 01/25/2019
Fees Total Due: ¤0.00 Total Paid: ¤7,516.08