I want to search for...

Permit #2018110963

Permit Details

Status: COED

Parcel Id: 07-11-31-7033-00390-0090
CONDITIONED SPACE: 1510 sqft
GARAGE: 403 sqft
OPENED PORCH (WITH ROOF) : 32 sqft
OPENED PORCH (WITH ROOF) : 240 sqft
Total Square Footage: 2185 sqft
Block: 00390
Subdivision: 2184 - SECTION 33-ROYAL PALMS
Job Phone: 386-960-7720
Location Address: 109 RENSHAW DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/13/2018
NOC: RECORDED
Applicant name: LAWRENCE FRED SIETSMA
Owner: AVTEC HOMES INC

Address

620 MALABAR RD SE

PALM BAY, FL 32907

Address

SUITE 5

PALM BAY, FL 32907

Lot: 0090
Contracted Stated Job Value: ¤175,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

AVTEC HOMES INC
Status Location Address State License Number Phone
CANCEL

2405 E GRAVES AVE

ORANGE CITY, FL 32763

CRC041905 (Exp: 08/31/2024) 386-960-7720

Sub Contractors

STEVEN JAY SMITH
Status Location Address State License Number Phone
INACTIVE

104 West Cedar Avenue

Orange City, FL 32763

EC0001542 (Exp: 08/31/2022) (386)775-7776
STEVEN JAY SMITH
Status Location Address State License Number Phone
INACTIVE

104 West Cedar Avenue

Orange City, FL 32763

EC0001542 (Exp: 08/31/2022) (386)775-7776
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
BRUCE R BOLTON
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

1982 SR 44

NEW SMYRNA BEACH, FL 32168

SUITE 357

NEW SMYRNA BEACH, FL 32168

CAC1817407 (Exp: 08/31/2022) 386-216-5975 386-402-4191

Inspection History

Type Request Date Result Inspector
ROW - DRAINAGE 06/05/2019 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
ROW - STORMWATER FINAL 06/05/2019 FINAL APPROVED KHOWELL
U -UTILITY RESIDENTIAL FINAL 06/04/2019 FINAL APPROVED LFITZGERALD
BLD - BUILDING FINAL 06/04/2019 APPROVED MWILLIAMS
ROW - FINAL APRON (AFTER POUR) 06/04/2019 APPROVED KHOWELL
ROW FIELD SURVEY /GRADING CERTIFICATION 06/03/2019 APPROVED KHOWELL
FINAL SURVEY (OFFICE USE ONLY) 06/03/2019 APPROVED RGROSS
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 05/21/2019 Disapproved - NO FEE RGROSS
Note: FINISHED FLOOR ELEVATION MUST BE 4 INCHES HIGHER THAN THE OUTSIDE GRADE
ELECTRIC - EARLY POWER 05/06/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED POWER 3:40
GRAVITY SEWER TEST 04/30/2019 APPROVED JGIBSON
U - SEWER TIE IN 04/30/2019 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 04/30/2019 APPROVED - AS NOTED KHOWELL
Note: THIS IS A REINSPECTION It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. PIN THE SWALE PLAN AND SITE PLAN TOGETHER IN BACK OF DOC BOX
ROW- PRE-APRON (PRE-POUR) 04/26/2019 Disapproved -FEE REQUIRED RGROSS
Note: NOT A CONSISTANT 6 INCH DEPTH AT THE ROAD EDGE.
LATH/BRICK/ WATER BARRIER 03/18/2019 APPROVED MWILLIAMS
INSULATION 03/13/2019 APPROVED WMILLER
ALL ROUGH 03/05/2019 APPROVED DROCKWELL
ROW - DRAINAGE 02/22/2019 Disapproved - NO FEE KHOWELL
Note: OPEN THE SWALE UP AND KEEP IT OPEN DURING THE REMAINDER OF CONSTRUCTION THIS WILL BE REINSPECTED ON 2-27-19 IF IT HAS NOT BEEN OPENED A REINSPECTION FEE WILL BE ADDED
ROOF VALLEY & METAL 02/19/2019 APPROVED DROCKWELL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/13/2019 APPROVED DROCKWELL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/11/2019 Disapproved -FEE REQUIRED DROCKWELL
Note: Not ready for inspection
TIE BEAM / LINTEL 02/06/2019 APPROVED DROCKWELL
TIE BEAM / LINTEL 02/05/2019 Disapproved -FEE REQUIRED DROCKWELL
Note: Missing down cell right of entry.Check plans
TIE BEAM / LINTEL 02/04/2019 Disapproved -FEE REQUIRED DROCKWELL
Note: per contractor/Missing dowel right of entry
FOUND SURVEY APPROVED (OFFICE) 02/01/2019 APPROVED JHINDMAN
MONOLITHIC SLAB 01/16/2019 APPROVED DROCKWELL
PLUMBING 1ST ROUGH UNDERGROUND 01/08/2019 APPROVED JGIBSON

Review History

Department Status Date In Date Out
SW1 COMPLETE 01/28/2019 02/01/2019
Note: Released By: JHINDMAN
SWALE COMPLETE 12/05/2018 12/13/2018
Note: Released By: TBAKER
BLD COMPLETE 11/30/2018 12/07/2018
Note: Released By: JHINDMAN
ELEC COMPLETE 11/30/2018 12/05/2018
Note: Released By: DREWIS
ENGIN1 COMPLETE 11/30/2018 12/05/2018
Note: Released By: TBAKER
MECH COMPLETE 11/30/2018 12/07/2018
Note: Released By: JHINDMAN
PLUM COMPLETE 11/30/2018 12/07/2018
Note: Released By: JHINDMAN
SW1 COMPLETE 11/30/2018 12/05/2018
Note: Released By: DREWIS
UD1 COMPLETE 11/30/2018 12/04/2018
Note: Released By: LFITZGERALD PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap
ZON COMPLETE 11/30/2018 12/03/2018
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 06/05/2019
REINSPECTION FEE ¤40.00 02/12/2019
REINSPECTION FEE ¤40.00 02/05/2019
REINSPECTION FEE ¤40.00 02/04/2019
NEW RESIDENTIAL INSPECTIONS ¤390.00 12/13/2018
SITE PLAN 20 ¤20.00 12/13/2018
SURCHARGE FS 533.721 ¤10.39 12/13/2018
SURCHARGE - FS 468.631 ¤15.59 12/13/2018
STORM WATER PERMIT FEES ¤80.00 12/13/2018
3% TRANS IMPACT FEE CREDIT (¤48.96) 12/13/2018
ADMIN FEE ¤20.00 12/13/2018
ELECTRIC FEE ¤177.00 12/13/2018
3% FIRE IMPACT FEE CREDIT (¤6.70) 12/13/2018
IMPACT FEE FIRE ¤223.38 12/13/2018
IMPACT FEE PARKS ¤849.24 12/13/2018
IMPACT FEE SCHOOL ¤3,600.00 12/13/2018
IMPACT FEE TRANSPORTATION ¤1,632.00 12/13/2018
MECHANICAL FEE ¤177.00 12/13/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 12/13/2018
PLAN CHECK FEE ¤78.00 12/13/2018
PLUMBING FEE ¤177.00 12/13/2018
Fees Total Due: ¤0.00 Total Paid: ¤7,528.46