Permit #2018110963
Permit Details
Status: COED
| Parcel Id: 07-11-31-7033-00390-0090 |
| CONDITIONED SPACE: 1510 sqft |
| GARAGE: 403 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| OPENED PORCH (WITH ROOF) : 240 sqft |
| Total Square Footage: 2185 sqft |
| Block: 00390 |
| Subdivision: 2184 - SECTION 33-ROYAL PALMS |
| Job Phone: 386-960-7720 |
| Location Address: 109 RENSHAW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/13/2018 |
| NOC: RECORDED |
| Applicant name: LAWRENCE FRED SIETSMA |
| Owner: AVTEC HOMES INC |
|
Address 620 MALABAR RD SE PALM BAY, FL 32907 |
|
Address SUITE 5 PALM BAY, FL 32907 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
AVTEC HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
2405 E GRAVES AVE ORANGE CITY, FL 32763 |
CRC041905 (Exp: 08/31/2024) | 386-960-7720 |
Sub Contractors
STEVEN JAY SMITH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
104 West Cedar Avenue Orange City, FL 32763 |
EC0001542 (Exp: 08/31/2022) | (386)775-7776 |
STEVEN JAY SMITH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
104 West Cedar Avenue Orange City, FL 32763 |
EC0001542 (Exp: 08/31/2022) | (386)775-7776 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
BRUCE R BOLTON
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
1982 SR 44 NEW SMYRNA BEACH, FL 32168 |
SUITE 357 NEW SMYRNA BEACH, FL 32168 |
CAC1817407 (Exp: 08/31/2022) | 386-216-5975 | 386-402-4191 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - DRAINAGE | 06/05/2019 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW - STORMWATER FINAL | 06/05/2019 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 06/04/2019 | FINAL APPROVED | LFITZGERALD |
| BLD - BUILDING FINAL | 06/04/2019 | APPROVED | MWILLIAMS |
| ROW - FINAL APRON (AFTER POUR) | 06/04/2019 | APPROVED | KHOWELL |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/03/2019 | APPROVED | KHOWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 06/03/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 05/21/2019 | Disapproved - NO FEE | RGROSS |
| Note: FINISHED FLOOR ELEVATION MUST BE 4 INCHES HIGHER THAN THE OUTSIDE GRADE | |||
| ELECTRIC - EARLY POWER | 05/06/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 3:40 | |||
| GRAVITY SEWER TEST | 04/30/2019 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 04/30/2019 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 04/30/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: THIS IS A REINSPECTION It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. PIN THE SWALE PLAN AND SITE PLAN TOGETHER IN BACK OF DOC BOX | |||
| ROW- PRE-APRON (PRE-POUR) | 04/26/2019 | Disapproved -FEE REQUIRED | RGROSS |
| Note: NOT A CONSISTANT 6 INCH DEPTH AT THE ROAD EDGE. | |||
| LATH/BRICK/ WATER BARRIER | 03/18/2019 | APPROVED | MWILLIAMS |
| INSULATION | 03/13/2019 | APPROVED | WMILLER |
| ALL ROUGH | 03/05/2019 | APPROVED | DROCKWELL |
| ROW - DRAINAGE | 02/22/2019 | Disapproved - NO FEE | KHOWELL |
| Note: OPEN THE SWALE UP AND KEEP IT OPEN DURING THE REMAINDER OF CONSTRUCTION THIS WILL BE REINSPECTED ON 2-27-19 IF IT HAS NOT BEEN OPENED A REINSPECTION FEE WILL BE ADDED | |||
| ROOF VALLEY & METAL | 02/19/2019 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/13/2019 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/11/2019 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Not ready for inspection | |||
| TIE BEAM / LINTEL | 02/06/2019 | APPROVED | DROCKWELL |
| TIE BEAM / LINTEL | 02/05/2019 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Missing down cell right of entry.Check plans | |||
| TIE BEAM / LINTEL | 02/04/2019 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: per contractor/Missing dowel right of entry | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/01/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 01/16/2019 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/08/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 01/28/2019 | 02/01/2019 |
| Note: Released By: JHINDMAN | |||
| SWALE | COMPLETE | 12/05/2018 | 12/13/2018 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 11/30/2018 | 12/07/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 11/30/2018 | 12/05/2018 |
| Note: Released By: DREWIS | |||
| ENGIN1 | COMPLETE | 11/30/2018 | 12/05/2018 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 11/30/2018 | 12/07/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 11/30/2018 | 12/07/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 11/30/2018 | 12/05/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 11/30/2018 | 12/04/2018 |
| Note: Released By: LFITZGERALD PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap | |||
| ZON | COMPLETE | 11/30/2018 | 12/03/2018 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/05/2019 |
| REINSPECTION FEE | ¤40.00 | 02/12/2019 |
| REINSPECTION FEE | ¤40.00 | 02/05/2019 |
| REINSPECTION FEE | ¤40.00 | 02/04/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤390.00 | 12/13/2018 |
| SITE PLAN 20 | ¤20.00 | 12/13/2018 |
| SURCHARGE FS 533.721 | ¤10.39 | 12/13/2018 |
| SURCHARGE - FS 468.631 | ¤15.59 | 12/13/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/13/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 12/13/2018 |
| ADMIN FEE | ¤20.00 | 12/13/2018 |
| ELECTRIC FEE | ¤177.00 | 12/13/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 12/13/2018 |
| IMPACT FEE FIRE | ¤223.38 | 12/13/2018 |
| IMPACT FEE PARKS | ¤849.24 | 12/13/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/13/2018 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 12/13/2018 |
| MECHANICAL FEE | ¤177.00 | 12/13/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 12/13/2018 |
| PLAN CHECK FEE | ¤78.00 | 12/13/2018 |
| PLUMBING FEE | ¤177.00 | 12/13/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,528.46 |