I want to search for...
Permit #2018120095
Permit Details
Status: FINAL
| Parcel Id: 05-11-31-4076-00000-060B |
| Block: 00000 |
| Subdivision: 1128 - LANDINGS @ MARINA COVE |
| Job Phone: 386-447-1402 |
| Location Address: 9 MARINA POINT PL |
| Type: BIA - BUILDING INTERIOR EXTERIOR ALTERATION |
| Issue Date: 12/22/2018 |
| NOC: RECORDED |
| Applicant name: RONALD ERIC PHILLIPS |
| Owner: BERTSCH, EDWARD & IDA |
|
Address 9 MARINA POINT PLACE PALM COAST, FL 32137 |
|
Address LIFE ESTATE PALM COAST, FL 32137 |
| Lot: 060B |
| Contracted Stated Job Value: ¤20,000.00 |
| Job Description: REMODEL KITCHEN/REMOVING LOAD BEARING WALL |
| Type: CN |
Contractor
PHILLIPS COASTAL CONSTRUCTION, INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
58 BUTTERFIELD DRIVE PALM COAST, FL 32137 |
CGC1506412 (Exp: 08/31/2024) | 386-447-1402 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1351 HAZELNUT ST BUNNELL, FL 32110 |
CFC1427527 (Exp: 08/31/2026) | 386-445-2532 | 386-445-5575 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/07/2019 | FINAL APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 06/06/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS IS A REINSPECTION GFCI’S NEEDED, 210.8-A, ALL 120 VOLT SINGLE PHASE 15 AND 20 AMP RECEPTICLES INSTALLED IN LOCATIONS SPECIFIED IN 1 TROUGH 8 SHALL HAVE GFCI PROTECTION (1. BATHROOMS,2. GARAGES, 3. OUT DOORS, 4. CRAWL SPACES, 5. UNFINISHED BASEMENTS, 6.KITCHENS, | |||
| BLD - BUILDING FINAL | 06/05/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: KNOCKED AND RANG DOORBELL (NO ANSWER), ACCESS NEEDED FOR INSPECTION. | |||
| INSULATION | 04/02/2019 | APPROVED | WMILLER |
| ALL ROUGH | 03/29/2019 | APPROVED | JHINDMAN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/29/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 02/25/2019 | APPROVED | WMILLER |
| Note: approved | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/21/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED TO TEST SHOWER PAN AT ALROUGH |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 03/19/2019 | 03/26/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 02/11/2019 | 02/18/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 02/11/2019 | 02/18/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 02/11/2019 | 02/18/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 12/17/2018 | 12/19/2018 |
| Note: Released By: DREWIS | |||
| BLD | COMPLETE | 12/05/2018 | 12/11/2018 |
| Note: Released By: RLEE | |||
| ELEC | HOLD | 12/05/2018 | 12/10/2018 |
| Note: Held By: DREWIS Disconnect needed for the AHU, NEC 2014 440.14. Daniel Rewis 986-4736 | |||
| MECH | CANCEL | 12/05/2018 | 12/11/2018 |
| PLUM | COMPLETE | 12/05/2018 | 12/11/2018 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 12/05/2018 | 12/05/2018 |
| Note: Released By: TAWILLIAMS No zoning required. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/06/2019 |
| REINSPECTION FEE | ¤40.00 | 06/06/2019 |
| REVISION | ¤40.00 | 03/28/2019 |
| REVISION | ¤40.00 | 02/24/2019 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 12/22/2018 |
| SITE PLAN 20 | ¤20.00 | 12/22/2018 |
| SURCHARGE FS 533.721 | ¤2.64 | 12/22/2018 |
| SURCHARGE - FS 468.631 | ¤3.96 | 12/22/2018 |
| ADMIN FEE | ¤20.00 | 12/22/2018 |
| ELECTRIC FEE | ¤72.00 | 12/22/2018 |
| PLAN CHECK FEE | ¤40.00 | 12/22/2018 |
| PLUMBING FEE | ¤72.00 | 12/22/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤430.60 |