Permit #2018120154
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00310-0010 |
| CONDITIONED SPACE: 1875 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| OPENED PORCH (WITH ROOF) : 213 sqft |
| GARAGE: 516 sqft |
| Total Square Footage: 2652 sqft |
| Block: 00310 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: 407-307-4753 |
| Location Address: 32 PICKERING DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/08/2019 |
| NOC: RECORDED |
| Applicant name: SHAWN VIRAG |
| Owner: BRITE PROPERTIES OF FLORIDA LLC |
|
Address 7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤127,800.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SHAWNTELLE CONSULTING AND DESIGN LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
611 LARGOVISTA DR OAKLAND, FL 34787 |
CBC1261160 (Exp: 08/31/2020) | 407-307-4753 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/26/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 07/26/2019 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW DAMAGE | 07/26/2019 | FINAL APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 07/25/2019 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 07/25/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: CLEAN UP LEFT SIDE OF PROPERTY AND STABILIZE BARE AREAS PRIOR TO CALLING IN FOR R.O.W. DAMAGE INSPECTION | |||
| ROW DAMAGE | 07/25/2019 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: ASPHALT REPAIR NOT DONE AT THE TIME OF INSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 07/25/2019 | Disapproved - NO FEE | KHOWELL |
| Note: REMOVE CONCRETE THAT IS POURED PAST THE RIGHT FOOTER INTO THE SWALE AREA | |||
| BLD - BUILDING FINAL | 07/25/2019 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: NEED TO HAVE ARC SHIELDS WHERE THERE IS MORE THAN 1/4" SPACE AT COMBUSTABLES CHECK ALL OUTLETS..NEC 314.20 (kitchen back splash) | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/24/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/24/2019 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 07/22/2019 | Disapproved - NO FEE | KHOWELL |
| Note: SEE NOTES ON SURVEY MARK UP | |||
| ELECTRIC - EARLY POWER | 07/01/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 2:00 | |||
| ROW- PRE-APRON (PRE-POUR) | 06/11/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: THIS IS A REINSPECTION It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/07/2019 | Disapproved - NO FEE | KHOWELL |
| Note: FORM WORK NOT FINISHED OR SOMEOENE HAS KNOCKED IT DOWN BEFORE INSPECTION | |||
| U - SEWER TIE IN | 05/21/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 05/21/2019 | APPROVED | JGIBSON |
| INSULATION | 05/03/2019 | APPROVED | DROCKWELL |
| LATH/BRICK/ WATER BARRIER | 05/01/2019 | APPROVED | DROCKWELL |
| ALL ROUGH | 04/25/2019 | APPROVED - AS NOTED | JCOLASANTI |
| Note: THIS IS A REINSPECTION need to phase hots in panel | |||
| ALL ROUGH | 04/24/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS IS A REINSPECTION not ready per area manager Tom on site | |||
| ALL ROUGH | 04/23/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. NOTCHING AND DRILLING STUDS R 602.6(2) INTERIOR NON BEARING WALLS 6th edition NOT MORE THAN 40 percent FOR NOTCHING, AND 60 percent WITH A MINIMUM OF 5/8 inch TO THE EDGE 2. BACK FALL ON DWV BRANCH ARMS 3. PLUMBING OUT OF WALL 4. FIREBLOCKING R302.11 1-6 MATERIAL THICKNESS 5. 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1), 6. DUCTWORK NOT INSTALLED AS PROPOSED (OBTAIN REVISION OR INSTALL AS PROPOSED 7. NEED TO PHASE OUT HOT CONDUCTORS IN PANEL BOX. NEC.210.5(C).. | |||
| ROOF VALLEY & METAL | 04/04/2019 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/01/2019 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 04/01/2019 | CANCELLED BY APPLICANT | WMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/27/2019 | Disapproved - NO FEE | JCOLASANTI |
| Note: THIS IS A REINSPECTION need COPC approved plans on site to complete inspection....Ok to dry in FBC 107.3 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/25/2019 | CANCELLED BY APPLICANT | WMILLER |
| Note: CANCELLED PER TOM | |||
| TIE BEAM / LINTEL | 03/13/2019 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 03/12/2019 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: THIS IS A REINSPECTION 1. CLEARANCE FROM MASONRY (6TH EDITION) R606.3.4 MINIMUM WALL REINFORCING STEEL COVERAGE NOT MET (.75 INCH) 2. missing dowels into footings at each side of doorway (drill and epoxy) (still misssing dowels) | |||
| TIE BEAM / LINTEL | 03/11/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. CLEARANCE FROM MASONRY (6TH EDITION) R606.3.4 MINIMUM WALL REINFORCING STEEL COVERAGE NOT MET (.75 INCH) 2. missing dowels into footings at each side of doorway (drill and epoxy) | |||
| ELECTRIC-TUG | 03/11/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 3:45 | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/08/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 03/01/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 02/28/2019 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: footing at garage corner needs to be 16" deep marked on plans (FBC 802) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/22/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/11/2019 | 03/18/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 03/05/2019 | 03/08/2019 |
| Note: Released By: JHINDMAN Foundation Survey | |||
| ZON | COMPLETE | 01/03/2019 | 01/03/2019 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 01/03/2019 | 01/03/2019 |
| Note: Released By: TBAKER | |||
| SWALE | COMPLETE | 01/03/2019 | 01/22/2019 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 12/14/2018 | 12/14/2018 |
| Note: Held By: AMOBLEY Repeat comment: Survey must have total lot square footage Survey should have the rear setback from house to property line | |||
| ENGIN1 | HOLD | 12/14/2018 | 12/18/2018 |
| Note: Held By: TBAKER Unacceptable benchamrk. Refer to attached document listing COPC benchmark standards | |||
| ELEC | COMPLETE | 12/14/2018 | 12/18/2018 |
| Note: Released By: DREWIS | |||
| SW1 | COMPLETE | 12/14/2018 | 12/18/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 12/14/2018 | 12/20/2018 |
| Note: Released By: LFITZGERALD PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap | |||
| BLD | COMPLETE | 12/06/2018 | 12/12/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 12/06/2018 | 12/10/2018 |
| Note: Held By: DREWIS Per NEC 2014 210.52 Additional GFCI in the laundry area. GFCI with weather proof cover(406.9) on the porch. Daniel Rewis 986-4736 | |||
| ENGIN1 | HOLD | 12/06/2018 | 12/10/2018 |
| Note: Held By: TBAKER No benchmark on survey | |||
| MECH | COMPLETE | 12/06/2018 | 12/12/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 12/06/2018 | 12/12/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 12/06/2018 | 12/10/2018 |
| Note: Held By: DREWIS Provide a site plan depicting storm water flow elevations and grade at and away from the foundation wall of residence per Residential Florida Building Code R401.3 and City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300. Daniel Rewis 986-4736 | |||
| UD1 | HOLD | 12/06/2018 | 12/12/2018 |
| Note: Held By: MBACON PEP Panel not shown on electrical plans PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. Please remove septic and drainfield from survey. | |||
| ZON | HOLD | 12/06/2018 | 12/07/2018 |
| Note: Held By: AMOBLEY Survey must have total lot square footage Survey should have the rear setback from house to property line |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤480.00 | 01/08/2019 |
| SITE PLAN 20 | ¤20.00 | 01/08/2019 |
| SURCHARGE FS 533.721 | ¤12.28 | 01/08/2019 |
| SURCHARGE - FS 468.631 | ¤18.42 | 01/08/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/08/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 01/08/2019 |
| ELECTRIC FEE | ¤204.00 | 01/08/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 01/08/2019 |
| IMPACT FEE FIRE | ¤223.38 | 01/08/2019 |
| IMPACT FEE PARKS | ¤849.24 | 01/08/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/08/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 01/08/2019 |
| MECHANICAL FEE | ¤204.00 | 01/08/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/08/2019 |
| PLAN CHECK FEE | ¤96.00 | 01/08/2019 |
| PLUMBING FEE | ¤204.00 | 01/08/2019 |
| ADMIN FEE | ¤20.00 | 01/08/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,882.18 |