Permit #2018120154

Permit Details

Status: COED

Parcel Id: 07-11-31-7026-00310-0010
CONDITIONED SPACE: 1875 sqft
OPENED PORCH (WITH ROOF) : 48 sqft
OPENED PORCH (WITH ROOF) : 213 sqft
GARAGE: 516 sqft
Total Square Footage: 2652 sqft
Block: 00310
Subdivision: 2153 - SECTION 26-PINE GROVE
Job Phone: 407-307-4753
Location Address: 32 PICKERING DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/08/2019
NOC: RECORDED
Applicant name: SHAWN VIRAG
Owner: BRITE PROPERTIES OF FLORIDA LLC

Address

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

Lot: 0010
Contracted Stated Job Value: ¤127,800.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SHAWNTELLE CONSULTING AND DESIGN LLC
Status Location Address State License Number Phone
CANCEL

611 LARGOVISTA DR

OAKLAND, FL 34787

CBC1261160 (Exp: 08/31/2020) 407-307-4753

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/26/2019 APPROVED MWILLIAMS
Note: THIS IS A REINSPECTION
ROW - FINAL APRON (AFTER POUR) 07/26/2019 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
ROW DAMAGE 07/26/2019 FINAL APPROVED KHOWELL
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 07/25/2019 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 07/25/2019 APPROVED - AS NOTED KHOWELL
Note: CLEAN UP LEFT SIDE OF PROPERTY AND STABILIZE BARE AREAS PRIOR TO CALLING IN FOR R.O.W. DAMAGE INSPECTION
ROW DAMAGE 07/25/2019 Disapproved -FEE REQUIRED KHOWELL
Note: ASPHALT REPAIR NOT DONE AT THE TIME OF INSPECTION
ROW - FINAL APRON (AFTER POUR) 07/25/2019 Disapproved - NO FEE KHOWELL
Note: REMOVE CONCRETE THAT IS POURED PAST THE RIGHT FOOTER INTO THE SWALE AREA
BLD - BUILDING FINAL 07/25/2019 Disapproved -FEE REQUIRED JCOLASANTI
Note: NEED TO HAVE ARC SHIELDS WHERE THERE IS MORE THAN 1/4" SPACE AT COMBUSTABLES CHECK ALL OUTLETS..NEC 314.20 (kitchen back splash)
FINAL SURVEY (OFFICE USE ONLY) 07/24/2019 APPROVED RGROSS
Note: THIS IS A REINSPECTION
ROW FIELD SURVEY /GRADING CERTIFICATION 07/24/2019 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 07/22/2019 Disapproved - NO FEE KHOWELL
Note: SEE NOTES ON SURVEY MARK UP
ELECTRIC - EARLY POWER 07/01/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED POWER 2:00
ROW- PRE-APRON (PRE-POUR) 06/11/2019 APPROVED - AS NOTED KHOWELL
Note: THIS IS A REINSPECTION It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ROW- PRE-APRON (PRE-POUR) 06/07/2019 Disapproved - NO FEE KHOWELL
Note: FORM WORK NOT FINISHED OR SOMEOENE HAS KNOCKED IT DOWN BEFORE INSPECTION
U - SEWER TIE IN 05/21/2019 APPROVED JGIBSON
GRAVITY SEWER TEST 05/21/2019 APPROVED JGIBSON
INSULATION 05/03/2019 APPROVED DROCKWELL
LATH/BRICK/ WATER BARRIER 05/01/2019 APPROVED DROCKWELL
ALL ROUGH 04/25/2019 APPROVED - AS NOTED JCOLASANTI
Note: THIS IS A REINSPECTION need to phase hots in panel
ALL ROUGH 04/24/2019 Disapproved -FEE REQUIRED WMILLER
Note: THIS IS A REINSPECTION not ready per area manager Tom on site
ALL ROUGH 04/23/2019 Disapproved -FEE REQUIRED WMILLER
Note: 1. NOTCHING AND DRILLING STUDS R 602.6(2) INTERIOR NON BEARING WALLS 6th edition NOT MORE THAN 40 percent FOR NOTCHING, AND 60 percent WITH A MINIMUM OF 5/8 inch TO THE EDGE 2. BACK FALL ON DWV BRANCH ARMS 3. PLUMBING OUT OF WALL 4. FIREBLOCKING R302.11 1-6 MATERIAL THICKNESS 5. 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1), 6. DUCTWORK NOT INSTALLED AS PROPOSED (OBTAIN REVISION OR INSTALL AS PROPOSED 7. NEED TO PHASE OUT HOT CONDUCTORS IN PANEL BOX. NEC.210.5(C)..
ROOF VALLEY & METAL 04/04/2019 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/01/2019 APPROVED WMILLER
Note: THIS IS A REINSPECTION
ROOF VALLEY & METAL 04/01/2019 CANCELLED BY APPLICANT WMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/27/2019 Disapproved - NO FEE JCOLASANTI
Note: THIS IS A REINSPECTION need COPC approved plans on site to complete inspection....Ok to dry in FBC 107.3
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/25/2019 CANCELLED BY APPLICANT WMILLER
Note: CANCELLED PER TOM
TIE BEAM / LINTEL 03/13/2019 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 03/12/2019 Disapproved -FEE REQUIRED JCOLASANTI
Note: THIS IS A REINSPECTION 1. CLEARANCE FROM MASONRY (6TH EDITION) R606.3.4 MINIMUM WALL REINFORCING STEEL COVERAGE NOT MET (.75 INCH) 2. missing dowels into footings at each side of doorway (drill and epoxy) (still misssing dowels)
TIE BEAM / LINTEL 03/11/2019 Disapproved -FEE REQUIRED WMILLER
Note: 1. CLEARANCE FROM MASONRY (6TH EDITION) R606.3.4 MINIMUM WALL REINFORCING STEEL COVERAGE NOT MET (.75 INCH) 2. missing dowels into footings at each side of doorway (drill and epoxy)
ELECTRIC-TUG 03/11/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED POWER 3:45
FOUND SURVEY APPROVED (OFFICE) 03/08/2019 APPROVED JHINDMAN
MONOLITHIC SLAB 03/01/2019 APPROVED MWILLIAMS
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 02/28/2019 Disapproved -FEE REQUIRED JCOLASANTI
Note: footing at garage corner needs to be 16" deep marked on plans (FBC 802)
PLUMBING 1ST ROUGH UNDERGROUND 02/22/2019 APPROVED JGIBSON

Review History

Department Status Date In Date Out
BLD COMPLETE 03/11/2019 03/18/2019
Note: Released By: JHINDMAN
SW1 COMPLETE 03/05/2019 03/08/2019
Note: Released By: JHINDMAN Foundation Survey
ZON COMPLETE 01/03/2019 01/03/2019
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 01/03/2019 01/03/2019
Note: Released By: TBAKER
SWALE COMPLETE 01/03/2019 01/22/2019
Note: Released By: TBAKER
ZON HOLD 12/14/2018 12/14/2018
Note: Held By: AMOBLEY Repeat comment: Survey must have total lot square footage Survey should have the rear setback from house to property line
ENGIN1 HOLD 12/14/2018 12/18/2018
Note: Held By: TBAKER Unacceptable benchamrk. Refer to attached document listing COPC benchmark standards
ELEC COMPLETE 12/14/2018 12/18/2018
Note: Released By: DREWIS
SW1 COMPLETE 12/14/2018 12/18/2018
Note: Released By: DREWIS
UD1 COMPLETE 12/14/2018 12/20/2018
Note: Released By: LFITZGERALD PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap
BLD COMPLETE 12/06/2018 12/12/2018
Note: Released By: JHINDMAN
ELEC HOLD 12/06/2018 12/10/2018
Note: Held By: DREWIS Per NEC 2014 210.52 Additional GFCI in the laundry area. GFCI with weather proof cover(406.9) on the porch. Daniel Rewis 986-4736
ENGIN1 HOLD 12/06/2018 12/10/2018
Note: Held By: TBAKER No benchmark on survey
MECH COMPLETE 12/06/2018 12/12/2018
Note: Released By: JHINDMAN
PLUM COMPLETE 12/06/2018 12/12/2018
Note: Released By: JHINDMAN
SW1 HOLD 12/06/2018 12/10/2018
Note: Held By: DREWIS Provide a site plan depicting storm water flow elevations and grade at and away from the foundation wall of residence per Residential Florida Building Code R401.3 and City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300. Daniel Rewis 986-4736
UD1 HOLD 12/06/2018 12/12/2018
Note: Held By: MBACON PEP Panel not shown on electrical plans PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. Please remove septic and drainfield from survey.
ZON HOLD 12/06/2018 12/07/2018
Note: Held By: AMOBLEY Survey must have total lot square footage Survey should have the rear setback from house to property line

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 08/13/2019
REINSPECTION FEE ¤40.00 08/13/2019
REINSPECTION FEE ¤40.00 08/13/2019
REINSPECTION FEE ¤40.00 08/13/2019
REINSPECTION FEE ¤40.00 08/13/2019
REINSPECTION FEE ¤40.00 08/13/2019
REINSPECTION FEE ¤40.00 08/13/2019
REINSPECTION FEE ¤40.00 08/13/2019
NEW RESIDENTIAL INSPECTIONS ¤480.00 01/08/2019
SITE PLAN 20 ¤20.00 01/08/2019
SURCHARGE FS 533.721 ¤12.28 01/08/2019
SURCHARGE - FS 468.631 ¤18.42 01/08/2019
STORM WATER PERMIT FEES ¤80.00 01/08/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 01/08/2019
ELECTRIC FEE ¤204.00 01/08/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 01/08/2019
IMPACT FEE FIRE ¤223.38 01/08/2019
IMPACT FEE PARKS ¤849.24 01/08/2019
IMPACT FEE SCHOOL ¤3,600.00 01/08/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 01/08/2019
MECHANICAL FEE ¤204.00 01/08/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 01/08/2019
PLAN CHECK FEE ¤96.00 01/08/2019
PLUMBING FEE ¤204.00 01/08/2019
ADMIN FEE ¤20.00 01/08/2019
Fees Total Due: ¤0.00 Total Paid: ¤7,882.18