Permit #2018120157
Permit Details
Status: COED
| Parcel Id: 07-11-31-7013-00190-0120 |
| CONDITIONED SPACE: 1683 sqft |
| OPENED PORCH (WITH ROOF) : 40 sqft |
| OPENED PORCH (WITH ROOF) : 214 sqft |
| GARAGE: 558 sqft |
| Total Square Footage: 2495 sqft |
| Block: 00190 |
| Subdivision: 2192 - SECTION 13-BELLE TERRE |
| Job Phone: 407-307-4753 |
| Location Address: 61 BRUNING LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/12/2019 |
| NOC: RECORDED |
| Applicant name: SHAWN VIRAG |
| Owner: BRITE PROPERTIES OF FLORIDA LLC |
|
Address 619 EAST WASHINGTON ORLANDO, FL 32801 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤140,878.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SHAWNTELLE CONSULTING AND DESIGN LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
611 LARGOVISTA DR OAKLAND, FL 34787 |
CBC1261160 (Exp: 08/31/2020) | 407-307-4753 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/14/2019 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ROW - STORMWATER FINAL | 11/14/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 11/12/2019 | APPROVED | AHALL |
| ROW - STORMWATER FINAL | 11/12/2019 | Disapproved - NO FEE | RGROSS |
| Note: CLEAN CULVERT ENDS. | |||
| BLD - BUILDING FINAL | 11/12/2019 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: MOCP RATING NOT MATCHING BREAKERS MFBC 1303 AC max beaker 25, 30 amp in panel....need termite sticker posted at final inspection | |||
| ROW - FINAL APRON (AFTER POUR) | 11/12/2019 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/07/2019 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 11/07/2019 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 10/15/2019 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION. READY TO POUR. SWALE PLAN DID NOT HAVE THE BENCHMARK. INSPECTOR CALLED FOR THE CORRECT ONE AND WROTE IT ON THE PLAN WITH INITIALS. | |||
| ELECTRIC - EARLY POWER | 10/08/2019 | APPROVED - AS NOTED | RMARTIN |
| ROW- PRE-APRON (PRE-POUR) | 10/04/2019 | Disapproved -FEE REQUIRED | RGROSS |
| Note: MISSING DOCUMENTATION. NO SWALE PLAN ON SITE. | |||
| GRAVITY SEWER TEST | 08/20/2019 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 08/20/2019 | APPROVED | JGIBSON |
| INSULATION | 08/06/2019 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 08/05/2019 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: need to frame out panel box.per plan...need to completly seal with fire foam panel at ceiling FBC 305 | |||
| LATH/BRICK/ WATER BARRIER | 08/02/2019 | APPROVED | JCOLASANTI |
| ALL ROUGH | 07/25/2019 | APPROVED - AS NOTED | JCOLASANTI |
| Note: secure vent at front porch...nail plate plumbing waste in laundry room...frame in electric panel.....need to completely seal dryer vent nat roof with mastic | |||
| ROOF VALLEY & METAL | 07/10/2019 | APPROVED | JDELBONIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/03/2019 | APPROVED - AS NOTED | JDELBONIS |
| Note: check down cells at next inspection still have boards on | |||
| ELECTRIC-TUG | 06/19/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 3:30 | |||
| TIE BEAM / LINTEL | 06/17/2019 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 06/10/2019 | APPROVED | JMUNSON |
| MONOLITHIC SLAB | 05/31/2019 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 05/30/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. NO EVIDENCE OF TERMITE TREATMENT OR NOTICE OF INTENT TO TREAT, R318.1.7 6th edition 2. footing do not conform to plans | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/23/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 06/07/2019 | 06/10/2019 |
| Note: Released By: JMUNSON Found S | |||
| ELEC | COMPLETE | 03/14/2019 | 03/21/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 02/11/2019 | 02/18/2019 |
| Note: Held By: JHINDMAN 1. Provide a signed and sealed electrical plan (page E1,0)or a plan signed by the electrical contractor with their license number. 2nd request. | |||
| ELEC | HOLD | 01/28/2019 | 02/04/2019 |
| Note: Held By: JHINDMAN 1. Provide a signed and sealed electrical plan or a plan signed by the electrical contractor with their license number. | |||
| SWALE | COMPLETE | 01/09/2019 | 01/16/2019 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/07/2019 | 01/08/2019 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 01/07/2019 | 01/09/2019 |
| Note: Released By: TBAKER | |||
| ELEC | HOLD | 01/07/2019 | 01/11/2019 |
| Note: Held By: JHINDMAN Provide receptacles for rear left side bedroom at the switch wall. 2014 nec 210.52 | |||
| SW1 | COMPLETE | 01/07/2019 | 01/11/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 12/06/2018 | 12/12/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 12/06/2018 | 12/10/2018 |
| Note: Held By: DREWIS Per NEC 2014 210.52 Provide receptacles for rear left side bedroom at the switch wall. Additional GFCI in the laundry area. GFCI with weather proof cover(406.9) on the porch. Provide load calculations, NEC 2014 220. Daniel Rewis 986-4736 | |||
| ENGIN1 | HOLD | 12/06/2018 | 12/10/2018 |
| Note: Held By: TBAKER No benchmark on survey | |||
| MECH | COMPLETE | 12/06/2018 | 12/12/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 12/06/2018 | 12/12/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 12/06/2018 | 12/10/2018 |
| Note: Held By: DREWIS Provide a site plan depicting storm water flow elevations and grade at and away from the foundation wall of residence per Residential Florida Building Code R401.3 and City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300. Daniel Rewis 986-4736 | |||
| UD1 | COMPLETE | 12/06/2018 | 12/12/2018 |
| Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 12/06/2018 | 12/07/2018 |
| Note: Held By: AMOBLEY Survey must have total lot square footage |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 12/05/2019 |
| REINSPECTION FEE | ¤40.00 | 12/05/2019 |
| REINSPECTION FEE | ¤40.00 | 12/05/2019 |
| REINSPECTION FEE | ¤40.00 | 12/05/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| ADMIN FEE | ¤20.00 | 04/12/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤440.00 | 04/12/2019 |
| SITE PLAN 20 | ¤20.00 | 04/12/2019 |
| SURCHARGE FS 533.721 | ¤11.44 | 04/12/2019 |
| SURCHARGE - FS 468.631 | ¤17.16 | 04/12/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/12/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 04/12/2019 |
| ELECTRIC FEE | ¤192.00 | 04/12/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 04/12/2019 |
| IMPACT FEE FIRE | ¤223.38 | 04/12/2019 |
| IMPACT FEE PARKS | ¤849.24 | 04/12/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/12/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 04/12/2019 |
| MECHANICAL FEE | ¤192.00 | 04/12/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 04/12/2019 |
| PLAN CHECK FEE | ¤88.00 | 04/12/2019 |
| PLUMBING FEE | ¤192.00 | 04/12/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,676.08 |