Permit #2018120161
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00530-0140 |
| CONDITIONED SPACE: 1571 sqft |
| OPENED PORCH (WITH ROOF) : 201 sqft |
| OPENED PORCH (WITH ROOF) : 46 sqft |
| GARAGE: 443 sqft |
| Total Square Footage: 2261 sqft |
| Block: 00530 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: 407-307-4753 |
| Location Address: 4 RYKER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/25/2019 |
| NOC: RECORDED |
| Applicant name: SHAWN VIRAG |
| Owner: BRITE PROPERTIES OF FLORIDA LLC |
|
Address 7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤135,466.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SHAWNTELLE CONSULTING AND DESIGN LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
611 LARGOVISTA DR OAKLAND, FL 34787 |
CBC1261160 (Exp: 08/31/2020) | 407-307-4753 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 08/09/2019 | FINAL APPROVED | KHOWELL |
| ROW - FINAL INSPECTION | 08/09/2019 | APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 07/03/2019 | FINAL APPROVED | MBACON |
| ROW - FINAL INSPECTION | 07/03/2019 | APPROVED | RGROSS |
| BLD - BUILDING FINAL | 07/03/2019 | FINAL APPROVED | DROCKWELL |
| ROW - FINAL APRON (AFTER POUR) | 07/03/2019 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/02/2019 | APPROVED | KHOWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 07/02/2019 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/27/2019 | Disapproved - NO FEE | KHOWELL |
| Note: SEE NOTES ON SURVEY | |||
| ELECTRIC - EARLY POWER | 05/30/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 3:40 | |||
| ROW- PRE-APRON (PRE-POUR) | 05/30/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: THIS IS A REINSPECTION It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/28/2019 | Disapproved - NO FEE | KHOWELL |
| Note: THIS IS A REINSPECTION CULVERT PIPE NOT CENTERED IN DRIVEWAY | |||
| ROW- PRE-APRON (PRE-POUR) | 05/24/2019 | CANCELLED BY APPLICANT | KHOWELL |
| U - SEWER TIE IN | 05/13/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 05/13/2019 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 04/17/2019 | APPROVED | DROCKWELL |
| INSULATION | 04/17/2019 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 04/15/2019 | Disapproved - NO FEE | DROCKWELL |
| Note: THIS IS A REINSPECTION/ Repair damage | |||
| INSULATION | 04/12/2019 | CANCELLED BY APPLICANT | DROCKWELL |
| ALL ROUGH | 04/09/2019 | APPROVED | MWILLIAMS |
| ROOF VALLEY & METAL | 04/01/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/28/2019 | APPROVED - AS NOTED | MWILLIAMS |
| Note: Header detail for load bearing wall calls for angled strapping on both ends of the header please add the strapping or submit a revision to refleft method of strapping currently being used. Will recheck at all rough inspection | |||
| TIE BEAM / LINTEL | 03/15/2019 | APPROVED | DROCKWELL |
| ELECTRIC-TUG | 03/15/2019 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 03/14/2019 | APPROVED | RLEE |
| MONOLITHIC SLAB | 03/06/2019 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION DEFICIENCIES NOTED PRIOR BY INSPECTOR JC AND DR RESOLVED | |||
| MONOLITHIC SLAB | 03/05/2019 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: THIS IS A REINSPECTION/ UFER ground ans adjoining steel laying on the ground.Install new chairs and lift for proper clearance/UFER must be tied to steel/ Dowel also on ground...install in proper place and tie off to footing steel. | |||
| MONOLITHIC SLAB | 03/04/2019 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: UFER CONNECTION NEEDS TO BE ACCESSABLE with 20' rebar length NEC 250.68(A) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/26/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/11/2019 | 03/14/2019 |
| Note: Released By: RLEE | |||
| SW1 | COMPLETE | 03/07/2019 | 03/14/2019 |
| Note: Released By: JHINDMAN foundation | |||
| ELEC | COMPLETE | 01/14/2019 | 01/22/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 01/14/2019 | 01/22/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 01/03/2019 | 01/03/2019 |
| Note: Released By: AMOBLEY | |||
| SWALE | COMPLETE | 01/02/2019 | 01/15/2019 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 12/26/2018 | 12/27/2018 |
| Note: Held By: AMOBLEY Need additional shrubs on left side | |||
| ENGIN1 | COMPLETE | 12/26/2018 | 01/02/2019 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 12/26/2018 | 01/04/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 12/26/2018 | 01/04/2019 |
| Note: Held By: JHINDMAN Per NEC 2014 210.52 Provide receptacles for both left side bedrooms at the switch wall. 2nd request | |||
| UD1 | COMPLETE | 12/26/2018 | 01/03/2019 |
| Note: Released By: MBACON | |||
| PLUM | HOLD | 12/26/2018 | 01/04/2019 |
| Note: Held By: JHINDMAN 1. Provide a minimum 3" drain to master bath water closet per 6th ed. FBC R Table 3005.4.1. J. hindman 986-3784. 2nd request | |||
| BLD | COMPLETE | 12/06/2018 | 12/12/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 12/06/2018 | 12/10/2018 |
| Note: Held By: DREWIS Per NEC 2014 210.52 Provide receptacles for both left side bedrooms at the switch wall. Additional GFCI in the laundry area. GFCI with weather proof cover(406.9) on the porch. Daniel Rewis 986-4736 | |||
| ENGIN1 | HOLD | 12/06/2018 | 12/10/2018 |
| Note: Held By: TBAKER No benchmark on survey | |||
| MECH | COMPLETE | 12/06/2018 | 12/12/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | HOLD | 12/06/2018 | 12/12/2018 |
| Note: Held By: JHINDMAN 1. Provide a minimum 3" drain to master bath water closet per 6th ed. FBC R Table 3005.4.1. J. hindman 986-3784. | |||
| SW1 | HOLD | 12/06/2018 | 12/10/2018 |
| Note: Held By: DREWIS Provide a site plan depicting storm water flow elevations and grade at and away from the foundation wall of residence per Residential Florida Building Code R401.3 and City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300. Daniel Rewis 986-4736 | |||
| UD1 | HOLD | 12/06/2018 | 12/12/2018 |
| Note: Held By: MBACON PEP Panel not shown on electrical plans PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. Please remove septic and drainfield from survey. | |||
| ZON | HOLD | 12/06/2018 | 12/06/2018 |
| Note: Held By: AMOBLEY Survey should have total lot square footage Need additional shrubs on left side |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤406.00 | 01/25/2019 |
| SITE PLAN 20 | ¤20.00 | 01/25/2019 |
| SURCHARGE FS 533.721 | ¤10.73 | 01/25/2019 |
| SURCHARGE - FS 468.631 | ¤16.09 | 01/25/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/25/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 01/25/2019 |
| ELECTRIC FEE | ¤181.80 | 01/25/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 01/25/2019 |
| IMPACT FEE FIRE | ¤223.38 | 01/25/2019 |
| IMPACT FEE PARKS | ¤849.24 | 01/25/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/25/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 01/25/2019 |
| MECHANICAL FEE | ¤181.80 | 01/25/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/25/2019 |
| PLAN CHECK FEE | ¤81.20 | 01/25/2019 |
| PLUMBING FEE | ¤181.80 | 01/25/2019 |
| ADMIN FEE | ¤20.00 | 01/25/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,522.90 |