I want to search for...
Permit #2018120237
Permit Details
Status: COED
| Parcel Id: 48-11-31-1700-00000-0050 |
| CONDITIONED SPACE: 2470 sqft |
| GARAGE: 954 sqft |
| OPENED PORCH (WITH ROOF) : 380 sqft |
| OPENED PORCH (WITH ROOF) : 90 sqft |
| Total Square Footage: 3894 sqft |
| Block: 00000 |
| Subdivision: 2086 - ESTATES AT GRAND HAVEN PHASE I |
| Job Phone: (386)445-2012 |
| Location Address: 15 BLUEJACK CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/02/2019 |
| NOC: RECORDED |
| Applicant name: JOHN DONALD GORDON |
| Owner: LEBOFFE, ELIZABETH M |
|
Address 34 WHIG STREET TRUMANSBURG, NY 14886 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤422,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. Box 354786 Palm Coast, FL 32137 |
CGC062646 (Exp: 08/31/2020) | (386)445-2012 | (386)446-7928 |
Sub Contractors
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
JOSEPH JOHN VERRECHIO
| Status | Location Address | State License Number | Phone |
| CANCEL |
1325 WEST STATE RD. 100 BUNNELL, FL 32110 |
EC13004254 (Exp: 08/31/2024) | 386-447-9644 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
PATTI MULLIGAN
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
2803 REIS ST PALATKA, FL 32177 |
21948 (Exp: 07/10/2021) | 386-698-1033 | 386-698-1077 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/25/2020 | FINAL APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 02/24/2020 | CANCELLED BY APPLICANT | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| GAS FINAL | 02/24/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| GAS FINAL | 02/21/2020 | CANCELLED BY APPLICANT | JGIBSON |
| BLD - BUILDING FINAL | 02/21/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: GFCI in garage lock out braker on wall oven GFCI in landry closet | |||
| U-CROSS CONNECTION | 02/20/2020 | APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 02/20/2020 | APPROVED | MMAJEWSKI |
| ROW - STORMWATER FINAL | 02/20/2020 | APPROVED | MMAJEWSKI |
| U -UTILITY RESIDENTIAL FINAL | 02/20/2020 | FINAL APPROVED | LFITZGERALD |
| GAS ROUGH | 02/20/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/19/2020 | APPROVED | MMAJEWSKI |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/19/2020 | APPROVED | MMAJEWSKI |
| ROW- PRE-APRON (PRE-POUR) | 01/29/2020 | APPROVED | RGROSS |
| ROW- PAVER RESTRAINTS | 01/08/2020 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 12/06/2019 | APPROVED - AS NOTED | RGROSS |
| Note: READY TO POUR. NOTE THAT THE SITE PLAN INDICATES PAVER DIVIDER BAND SECTIONS THAT WERE NOT FORMED AT THE TIME OF THE INSPECTION. | |||
| U - SEWER TIE IN | 07/15/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS INSPECTED ON 7/12/19 | |||
| GRAVITY SEWER TEST | 07/15/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS AN ADD ON FROM 7/12/19 I WENT TO THE ADDRESS AND PERFORMED INSPECTION | |||
| ELECTRIC - EARLY POWER | 06/20/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 3:00 | |||
| GAS ROUGH | 05/03/2019 | PARTIALLY APPROVED | JGIBSON |
| Note: NEED BOND WIRE RAN TO GAS LINE BEFORE GAS FINAL | |||
| LATH/BRICK/ WATER BARRIER | 05/03/2019 | APPROVED | WMILLER |
| INSULATION | 05/01/2019 | APPROVED | MWILLIAMS |
| ALL ROUGH | 04/12/2019 | APPROVED - AS NOTED | WMILLER |
| Note: need the following by insulation NAIL PLATES ELECTRIC TOP OF PANEL AND BOTTOM PLATE BY ICE MAKER LINE... PROTECTION OF ELECTRIC FBC E3802.1, AND 3802.3.2 CALL SEPARATE TUB SET FOR GARDEN TUB PRIOR TO CLOSING IN | |||
| ROOF VALLEY & METAL | 03/19/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/14/2019 | APPROVED | MWILLIAMS |
| ELECTRIC-TUG | 03/14/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 3:20 | |||
| TIE BEAM / LINTEL | 02/27/2019 | APPROVED | MWILLIAMS |
| FOUND SURVEY APPROVED (OFFICE) | 02/26/2019 | APPROVED | RLEE |
| MONOLITHIC SLAB | 02/12/2019 | APPROVED | WMILLER |
| Note: approved | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/04/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 02/25/2019 | 02/26/2019 |
| Note: Released By: RLEE Foundation Survey | |||
| SW1 | COMPLETE | 12/11/2018 | 12/11/2018 |
| Note: Released By: DREWIS Site plan with proper requirments was originally submitted. | |||
| PLFM | COMPLETE | 12/10/2018 | 12/10/2018 |
| Note: Released By: JMYERS According to the Site Plan provided, the structure will not fall within the Special Flood Hazard Area which resides on the property. No elevation certificates will be required. | |||
| BLD | COMPLETE | 12/07/2018 | 12/13/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 12/07/2018 | 12/11/2018 |
| Note: Released By: DREWIS | |||
| ENGIN1 | COMPLETE | 12/07/2018 | 12/10/2018 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 12/07/2018 | 12/13/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 12/07/2018 | 12/13/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 12/07/2018 | 12/11/2018 |
| Note: Held By: DREWIS Provide a site plan depicting proposed elevations for storm water flow, City of Palm Coast Tech. Manual Sec. 5 Eng. Standard 300 and elevations for grade at the foundation and 10' per Residential Florida Building Code R401.3. Daniel Rewis 986-4736 | |||
| UD1 | COMPLETE | 12/07/2018 | 12/17/2018 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind | |||
| ZON | COMPLETE | 12/07/2018 | 12/10/2018 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 02/25/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤844.00 | 01/02/2019 |
| SITE PLAN 20 | ¤20.00 | 01/02/2019 |
| SURCHARGE FS 533.721 | ¤19.92 | 01/02/2019 |
| SURCHARGE - FS 468.631 | ¤29.89 | 01/02/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/02/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 01/02/2019 |
| ADMIN FEE | ¤20.00 | 01/02/2019 |
| ELECTRIC FEE | ¤313.20 | 01/02/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 01/02/2019 |
| IMPACT FEE FIRE | ¤223.38 | 01/02/2019 |
| IMPACT FEE PARKS | ¤849.24 | 01/02/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/02/2019 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 01/02/2019 |
| MECHANICAL FEE | ¤313.20 | 01/02/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/02/2019 |
| PLAN CHECK FEE | ¤168.80 | 01/02/2019 |
| PLUMBING FEE | ¤313.20 | 01/02/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,694.22 |