Permit #2018120397
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00650-0130 |
| CONDITIONED SPACE: 1806 sqft |
| GARAGE: 453 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| SCREEN PORCH (SOLID ROOF) : 240 sqft |
| Total Square Footage: 2559 sqft |
| Block: 00650 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 386-960-7720 |
| Location Address: 13 ROLLING SANDS DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/11/2019 |
| NOC: RECORDED |
| Applicant name: LAWRENCE FRED SIETSMA |
| Owner: AVTEC HOMES INC |
|
Address 620 MALABAR ROAD SE STE 5 PALM BAY, FL 32907 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤225,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
AVTEC HOMES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
2405 E GRAVES AVE ORANGE CITY, FL 32763 |
CRC041905 (Exp: 08/31/2024) | 386-960-7720 |
Sub Contractors
DOUGLAS EDWARD RICHARDS
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
108 E INDIANA AVENUE DELAND, FL 32724 |
CCC1328824 (Exp: 08/31/2024) | 386-736-4226 | 386-740-0535 |
STEVEN JAY SMITH
| Status | Location Address | State License Number | Phone |
| INACTIVE |
104 West Cedar Avenue Orange City, FL 32763 |
EC0001542 (Exp: 08/31/2022) | (386)775-7776 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
BRUCE R BOLTON
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
1982 SR 44 NEW SMYRNA BEACH, FL 32168 |
SUITE 357 NEW SMYRNA BEACH, FL 32168 |
CAC1817407 (Exp: 08/31/2022) | 386-216-5975 | 386-402-4191 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 06/26/2019 | FINAL APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 06/26/2019 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 06/25/2019 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: the sewer clean out cap is required to be flush with final sod grade. Please cut lower accordingly. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/25/2019 | APPROVED | KHOWELL |
| ROW - STORMWATER FINAL | 06/25/2019 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: SOD THE BARE AREAS ON THE LEFT SIDE IN THE R.O.W. WITH BAHIA SOD | |||
| BLD - BUILDING FINAL | 06/25/2019 | FINAL APPROVED | DROCKWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 06/21/2019 | APPROVED | KHOWELL |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/21/2019 | APPROVED | KHOWELL |
| ELECTRIC - EARLY POWER | 06/12/2019 | APPROVED | MWILLIAMS |
| ROW- PRE-APRON (PRE-POUR) | 06/05/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: THIS IS A REINSPECTION It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/03/2019 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: THIS IS A REINSPECTION THE CULVERT PIPE IS NOT 8' FROM THE EXISTING EDGE OF PAVEMENT | |||
| ROW- PRE-APRON (PRE-POUR) | 05/31/2019 | CANCELLED BY APPLICANT | KHOWELL |
| Note: THIS IS A REINSPECTION BRIAN TEXTED AND CANCELLED INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 05/30/2019 | CANCELLED BY APPLICANT | KHOWELL |
| Note: BRIAN TEXTED AND CANCELLED | |||
| LATH/BRICK/ WATER BARRIER | 04/29/2019 | APPROVED | MWILLIAMS |
| INSULATION | 04/24/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 04/23/2019 | Disapproved -FEE REQUIRED | MWILLIAMS |
| Note: Multiple penetrations through the top plate not fire caulked. plumbing and electrical wires and pipes. | |||
| ALL ROUGH | 04/18/2019 | APPROVED - AS NOTED | JCOLASANTI |
| Note: need to hold water in the waste test pipe....need to fireblock kitchen exhaust fbc 302 | |||
| ROOF VALLEY & METAL | 04/15/2019 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/10/2019 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/09/2019 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Not ready for inspection/Anchor entry headers to lintel/Nail off sheathing. | |||
| TIE BEAM / LINTEL | 03/28/2019 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 03/27/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 03/14/2019 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/12/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 03/12/2019 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 03/12/2019 | APPROVED | JGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/11/2019 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NEED TO HAVE ON SITE AT TIME OF INSPECTION ALL APPROVED DOCUMENTS AND APPROVED STAMPED PLANS FOR INSPECTION, SEWER TIE IN AND GRAVITY SEWER INSPECTIONS NEED TO BE CALLED IN AS ALL ARE COMPLETED |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 03/20/2019 | 03/27/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 02/19/2019 | 02/19/2019 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 02/19/2019 | 02/22/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 02/19/2019 | 02/25/2019 |
| Note: Released By: MBACON | |||
| ZON | COMPLETE | 02/19/2019 | 02/19/2019 |
| Note: Released By: AMOBLEY | |||
| ELEC | COMPLETE | 12/27/2018 | 01/07/2019 |
| Note: Released By: JHINDMAN | |||
| SWALE | COMPLETE | 12/18/2018 | 12/19/2018 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 12/14/2018 | 12/21/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 12/14/2018 | 12/18/2018 |
| Note: Held By: DREWIS Provide a disconnect for the AHU, NEC 2014 440.14. Provide an additional receptacle for the switch wall in bedroom 3, NEC 2014 210.52. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 12/14/2018 | 12/18/2018 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 12/14/2018 | 12/21/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 12/14/2018 | 12/26/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 12/14/2018 | 12/18/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 12/14/2018 | 12/20/2018 |
| Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 12/14/2018 | 12/14/2018 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/26/2019 |
| REINSPECTION FEE | ¤40.00 | 06/26/2019 |
| REINSPECTION FEE | ¤40.00 | 06/26/2019 |
| REINSPECTION FEE | ¤40.00 | 06/26/2019 |
| REINSPECTION FEE | ¤40.00 | 06/26/2019 |
| REINSPECTION FEE | ¤40.00 | 06/26/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤462.00 | 01/11/2019 |
| SITE PLAN 20 | ¤20.00 | 01/11/2019 |
| SURCHARGE FS 533.721 | ¤11.90 | 01/11/2019 |
| SURCHARGE - FS 468.631 | ¤17.85 | 01/11/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/11/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 01/11/2019 |
| ADMIN FEE | ¤20.00 | 01/11/2019 |
| ELECTRIC FEE | ¤198.60 | 01/11/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 01/11/2019 |
| IMPACT FEE FIRE | ¤223.38 | 01/11/2019 |
| IMPACT FEE PARKS | ¤849.24 | 01/11/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/11/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 01/11/2019 |
| MECHANICAL FEE | ¤198.60 | 01/11/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/11/2019 |
| PLAN CHECK FEE | ¤92.40 | 01/11/2019 |
| PLUMBING FEE | ¤198.60 | 01/11/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,763.43 |