I want to search for...

Permit #2018120400

Permit Details

Status: COED

Parcel Id: 07-11-31-7024-00210-0030
CONDITIONED SPACE: 1806 sqft
GARAGE: 413 sqft
OPENED PORCH (WITH ROOF) : 60 sqft
OPENED PORCH (WITH ROOF) : 240 sqft
Total Square Footage: 2519 sqft
Block: 00210
Subdivision: 2167 - SECTION 24-PINE GROVE
Job Phone: 386-960-7720
Location Address: 166 PRITCHARD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/11/2019
NOC: RECORDED
Applicant name: LAWRENCE FRED SIETSMA
Owner: AVTEC HOMES INC A FLORIDA CORP.

Address

620 MALABAR ROAD SE SUITE 5

PALM BAY, FL 32907

Lot: 0030
Contracted Stated Job Value: ¤220,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

AVTEC HOMES INC
Status Location Address State License Number Phone
CANCEL

2405 E GRAVES AVE

ORANGE CITY, FL 32763

CRC041905 (Exp: 08/31/2024) 386-960-7720

Sub Contractors

DOUGLAS EDWARD RICHARDS
Status Location Address State License Number Phone Fax
INACTIVE

108 E INDIANA AVENUE

DELAND, FL 32724

CCC1328824 (Exp: 08/31/2024) 386-736-4226 386-740-0535
STEVEN JAY SMITH
Status Location Address State License Number Phone
INACTIVE

104 West Cedar Avenue

Orange City, FL 32763

EC0001542 (Exp: 08/31/2022) (386)775-7776
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
BRUCE R BOLTON
Status Location Address Mailing Address State License Number Phone Fax
CANCEL

1982 SR 44

NEW SMYRNA BEACH, FL 32168

SUITE 357

NEW SMYRNA BEACH, FL 32168

CAC1817407 (Exp: 08/31/2022) 386-216-5975 386-402-4191

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/27/2019 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION
ROW - FINAL APRON (AFTER POUR) 06/26/2019 APPROVED KHOWELL
ROW - STORMWATER FINAL 06/26/2019 FINAL APPROVED KHOWELL
U -UTILITY RESIDENTIAL FINAL 06/25/2019 FINAL APPROVED LFITZGERALD
BLD - BUILDING FINAL 06/25/2019 Disapproved -FEE REQUIRED DROCKWELL
Note: House locked.No access
ROW FIELD SURVEY /GRADING CERTIFICATION 06/21/2019 APPROVED KHOWELL
FINAL SURVEY (OFFICE USE ONLY) 06/21/2019 APPROVED KHOWELL
ELECTRIC - EARLY POWER 05/30/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED POWER 3:40
ELECTRIC - EARLY POWER 05/28/2019 Disapproved -FEE REQUIRED RMARTIN
Note: SERVICE CABLE IS NOT TERMINATED AT METER, THIS NEEDS TO BE DONE PRIOR TO EARLY POWER INSPECTION
ROW- PRE-APRON (PRE-POUR) 05/13/2019 APPROVED - AS NOTED KHOWELL
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. RAIN IN FORCAST
LATH/BRICK/ WATER BARRIER 04/18/2019 APPROVED MWILLIAMS
INSULATION 04/09/2019 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
ALL ROUGH 04/05/2019 APPROVED WMILLER
Note: DEFICIENCIES NOTED BY INSPECTOR PRIOR RESOLVED
INSULATION 04/05/2019 CANCELLED BY APPLICANT WMILLER
Note: CANCELLED PER BRIAN
ALL ROUGH 04/02/2019 Disapproved -FEE REQUIRED JCOLASANTI
Note: need meter box, disconnect and service mast installed at all rough inspection
ROOF VALLEY & METAL 03/27/2019 APPROVED WMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/25/2019 APPROVED WMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/22/2019 Disapproved -FEE REQUIRED WMILLER
Note: missing strap at front porch/entry
TIE BEAM / LINTEL 03/12/2019 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 03/08/2019 APPROVED JHINDMAN
MONOLITHIC SLAB 02/20/2019 APPROVED WMILLER
Note: APPROVED
MONOLITHIC SLAB 02/19/2019 Disapproved -FEE REQUIRED JCOLASANTI
Note: DOCUMENTS MUST BE APPROVED AND KEPT ON SITE AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 107.3,1. (need documents onsite at time of inspection)
GRAVITY SEWER TEST 02/12/2019 APPROVED - AS NOTED JGIBSON
Note: THIS INSPECTION WAS DONE ON 2/11/19 WITH THE FIRST ROUGH PLUMBING
U - SEWER TIE IN 02/12/2019 APPROVED - AS NOTED JGIBSON
Note: THIS INSPECTION WAS APPROVED ON 2/11/18 WITH FIRST ROUGH PLUMBING AND VEDIO SENT BY PLUMBING CONTRACTOR
PLUMBING 1ST ROUGH UNDERGROUND 02/11/2019 APPROVED - AS NOTED JGIBSON
Note: CONTRACTOR WILL CALL IN FOR GRAVITY SEWER AND U- TIE IN ON 2/12/19 ALL WERE INSPECTED AND APPROVED TODAY 2/11/19

Review History

Department Status Date In Date Out
SW1 COMPLETE 03/04/2019 03/08/2019
Note: Released By: JHINDMAN
ELEC COMPLETE 12/21/2018 01/03/2019
Note: Released By: JHINDMAN
UD1 COMPLETE 12/21/2018 01/02/2019
Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
SWALE COMPLETE 12/18/2018 01/10/2019
Note: Released By: TBAKER
BLD COMPLETE 12/14/2018 12/21/2018
Note: Released By: JHINDMAN
ELEC HOLD 12/14/2018 12/18/2018
Note: Held By: DREWIS Additional receptacle needed for switch wall of bedroom three, NEC 2014 210.52 Additonal GFCI needed in the laundry area, NEC 2014 210.52F. Disconnect needed for the AHU, NEC 2014 440.14 Daniel Rewis 986-4736
ENGIN1 COMPLETE 12/14/2018 12/18/2018
Note: Released By: TBAKER
MECH COMPLETE 12/14/2018 12/21/2018
Note: Released By: JHINDMAN
PLUM COMPLETE 12/14/2018 12/21/2018
Note: Released By: JHINDMAN
SW1 COMPLETE 12/14/2018 12/18/2018
Note: Released By: DREWIS
UD1 HOLD 12/14/2018 12/20/2018
Note: Held By: MBACON Please attach Utility marked site plan and water reciept.
ZON COMPLETE 12/14/2018 12/14/2018
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/30/2019
REINSPECTION FEE ¤40.00 07/30/2019
REINSPECTION FEE ¤40.00 07/30/2019
REINSPECTION FEE ¤40.00 03/25/2019
REINSPECTION FEE ¤40.00 02/19/2019
NEW RESIDENTIAL INSPECTIONS ¤460.00 01/11/2019
SITE PLAN 20 ¤20.00 01/11/2019
SURCHARGE FS 533.721 ¤11.86 01/11/2019
SURCHARGE - FS 468.631 ¤17.79 01/11/2019
STORM WATER PERMIT FEES ¤80.00 01/11/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 01/11/2019
ADMIN FEE ¤20.00 01/11/2019
ELECTRIC FEE ¤198.00 01/11/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 01/11/2019
IMPACT FEE FIRE ¤223.38 01/11/2019
IMPACT FEE PARKS ¤849.24 01/11/2019
IMPACT FEE SCHOOL ¤3,600.00 01/11/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 01/11/2019
MECHANICAL FEE ¤198.00 01/11/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 01/11/2019
PLAN CHECK FEE ¤92.00 01/11/2019
PLUMBING FEE ¤198.00 01/11/2019
Fees Total Due: ¤0.00 Total Paid: ¤7,719.13