I want to search for...
Permit #2018120419
Permit Details
Status: CANCEL
| Parcel Id: 07-11-31-7030-00560-0240 |
| CONDITIONED SPACE: 1390 sqft |
| GARAGE: 445 sqft |
| OPENED PORCH (WITH ROOF) : 120 sqft |
| OPENED PORCH (WITH ROOF) : 52 sqft |
| Total Square Footage: 2007 sqft |
| Block: 00560 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: 407-307-4753 |
| Location Address: 76 RANDOLPH DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/06/2019 |
| NOC: RECORDED |
| Applicant name: SHAWN VIRAG |
| Owner: DLP BRITE HOMES LLC |
|
Address 605 PALENCIA CLUB DRIVE ST AUGUSTINE, FL 32095 |
| Lot: 0240 |
| Contracted Stated Job Value: ¤127,800.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SHAWNTELLE CONSULTING AND DESIGN LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
611 LARGOVISTA DR OAKLAND, FL 34787 |
CBC1261160 (Exp: 08/31/2020) | 407-307-4753 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
RALPH RICHARD PARROTT
| Status | Location Address | State License Number | Phone |
| INACTIVE |
7777 WICKHAM ROAD, SUITE 12507 MELBOURNE, FL 32940 |
CFC1429812 (Exp: 08/31/2026) | 407-568-9202 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
Inspection History
| Type | Request Date | Result | Inspector |
| FOUND SURVEY APPROVED (OFFICE) | |||
| FINAL SURVEY (OFFICE USE ONLY) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | |||
| GRAVITY SEWER TEST | |||
| ELECTRIC - EARLY POWER | |||
| MONOLITHIC SLAB | |||
| LATH/BRICK/ WATER BARRIER | |||
| TIE BEAM / LINTEL | |||
| ALL ROUGH | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | |||
| ROOF VALLEY & METAL | |||
| INSULATION | |||
| BLD - BUILDING FINAL | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| U - SEWER TIE IN | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 04/29/2019 | 04/30/2019 |
| Note: Released By: AMOBLEY | |||
| SW1 | COMPLETE | 04/29/2019 | 04/30/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 04/29/2019 | 05/03/2019 |
| Note: Released By: AHALL | |||
| ENGIN1 | COMPLETE | 04/29/2019 | 04/30/2019 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 03/14/2019 | 03/14/2019 |
| Note: Held By: AMOBLEY Site plan/Survey must have all (front,rear and sides) setbacks from house to property line | |||
| SW1 | HOLD | 03/14/2019 | 03/15/2019 |
| Note: Held By: RLEE 1. Drainage is not to ULDC Tech Manual chapter 5-300 2. Remove septic tank and drain field. 3. positive outfall from structure does not comply with FBCR 401.3 | |||
| UD1 | COMPLETE | 03/14/2019 | 03/19/2019 |
| Note: Released By: AHALL PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap | |||
| ENGIN1 | COMPLETE | 03/14/2019 | 03/18/2019 |
| Note: Released By: TBAKER | |||
| ELEC | HOLD | 02/18/2019 | 02/18/2019 |
| Note: Held By: JHINDMAN 1. Provide a signed and sealed electrical plan or a plan signed by the electrical contractor with their license number. 6th ed. FBC 107.1. J. hindman 986-3784. | |||
| ZON | HOLD | 02/11/2019 | 02/12/2019 |
| Note: Held By: AMOBLEY Can not have a windowless wall facing a street | |||
| ELEC | COMPLETE | 02/11/2019 | 02/18/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 02/11/2019 | 02/18/2019 |
| Note: Released By: JHINDMAN | |||
| MECH | COMPLETE | 02/11/2019 | 02/18/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 02/11/2019 | 02/15/2019 |
| Note: Held By: RLEE Provide proposed grades at structure, determine 5% minimum positive outfall within 10 foot. | |||
| ENGIN1 | COMPLETE | 02/11/2019 | 02/12/2019 |
| Note: Released By: TBAKER | |||
| UD1 | COMPLETE | 02/11/2019 | 02/18/2019 |
| Note: Released By: LFITZGERALD PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap | |||
| SWALE | COMPLETE | 01/17/2019 | 02/12/2019 |
| Note: Released By: TBAKER | |||
| ZON | HOLD | 01/14/2019 | 01/14/2019 |
| Note: Held By: AMOBLEY Rear setback must be from the furthest point to property line Can not have windowless walls facing a public right of way Need landscape with the correct layout | |||
| ENGIN1 | COMPLETE | 01/14/2019 | 01/17/2019 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 01/14/2019 | 01/22/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 01/14/2019 | 01/22/2019 |
| Note: Held By: JHINDMAN Provided the signature and seal of the designing engineer or the signature with license number of the electrical contractor, FBC 107.1 This needs to be on the electrical plan page. | |||
| BLD | COMPLETE | 12/14/2018 | 12/21/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 12/14/2018 | 12/18/2018 |
| Note: Held By: DREWIS Provided the signature and seal of the designing engineer or the signature with license number of the electrical contractor, FBC 107.1 Daniel Rewis 986-4736 | |||
| ENGIN1 | HOLD | 12/14/2018 | 12/18/2018 |
| Note: Held By: TBAKER No benchmark on survey - please see attached document for COPC benchmark standards | |||
| MECH | COMPLETE | 12/14/2018 | 12/21/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 12/14/2018 | 12/21/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 12/14/2018 | 12/18/2018 |
| Note: Held By: DREWIS Provide a site plan with proposed elevations depicting stormwater flow per City of Palm Coast Tech. Manual Sec. 5 eng. Standard 300 and grade elevations per Residential Florida Building Code R401.3. Daniel Rewis 986-4736 | |||
| UD1 | COMPLETE | 12/14/2018 | 12/20/2018 |
| Note: Released By: MBACON PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 12/14/2018 | 12/14/2018 |
| Note: Held By: AMOBLEY Survey must have total lot square footage It appears the left and right elevation are swapped on elevation page Blueprint layout does not match site and landscape plans. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 06/06/2019 |
| ELECTRIC FEE | ¤168.00 | 06/06/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 06/06/2019 |
| IMPACT FEE FIRE | ¤223.38 | 06/06/2019 |
| IMPACT FEE PARKS | ¤849.24 | 06/06/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/06/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 06/06/2019 |
| MECHANICAL FEE | ¤168.00 | 06/06/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 06/06/2019 |
| PLAN CHECK FEE | ¤72.00 | 06/06/2019 |
| PLUMBING FEE | ¤168.00 | 06/06/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤360.00 | 06/06/2019 |
| SITE PLAN 20 | ¤20.00 | 06/06/2019 |
| SURCHARGE FS 533.721 | ¤9.76 | 06/06/2019 |
| SURCHARGE - FS 468.631 | ¤14.64 | 06/06/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/06/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 06/06/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,303.88 |