Permit #2018120597

Permit Details

Status: FINAL

Parcel Id: 05-11-31-5918-00000-0190
Block: 00000
Subdivision: 2244 - VILLAGE AT PALM COAST PH 1
Job Phone: (386)447-8003
Location Address: 131 LONGVIEW WAY N
Type: BH - BOATHOUSE
Issue Date: 03/25/2019
NOC: RECORDED
Applicant name: CHRIS HOWARD
Owner: VANDERHEIDEWIJMA DICK ROBERT & GERLINDE K H&W

Address

131 LONGVIEW WAY N

PALM COAST, FL 32137

Lot: 0190
Contracted Stated Job Value: ¤36,910.00
Job Description: DOCK , BOATHOUSE, LIFT - ROOF TO MATCH HOUSE
Type: CN

Contractor

JC MARINE CONTRACTORS INC
Status Location Address Phone
CANCEL

2550 N US 1 SUITE 2

BUNNELL, FL 32110

(386)447-8003

Inspection History

Type Request Date Result Inspector
FINAL - BUILDING MISC 06/11/2019 FINAL APPROVED WMILLER
Note: final approved

Review History

Department Status Date In Date Out
ZON COMPLETE 03/15/2019 03/18/2019
Note: Released By: TDOAK OK with environmental planner
PLENV COMPLETE 03/15/2019 03/15/2019
Note: Released By: JMYERS No comments
BLD COMPLETE 03/15/2019 03/22/2019
Note: Released By: JHINDMAN
ZON HOLD 01/10/2019 01/10/2019
Note: Held By: TDOAK REPEAT COMMENT: 1. This permit requires a "Consent to Easement" by Department of the Army. Please refer to the letter in the submittal package dated 12/7/18 from the Regulatory Division, North Permits Branch. See #3 - A Consent to Easement is required. Provide a copy of this document.
PLENV HOLD 01/10/2019 01/11/2019
Note: Held By: JMYERS Please provide a Listed Species Assessment as Gopher Tortoise have been located in the area. Provide a status of permit modification with SJRWMD for the alteration of the Maintained Vegetated Buffer.
BLD HOLD 01/10/2019 01/17/2019
Note: Held By: RLEE 1. Provide manufacturers specifications for the boat lift. If electric provide an electric contracor and electrical plan 6th ed. FBC 107.2.1
BLD HOLD 12/21/2018 01/03/2019
Note: Held By: JHINDMAN 1. Provide manufacturers specifications for the boat lift. If electric provide an electric contracor and electrical plan 6th ed. FBC 107.2.1. J. hindman 986-3784.
SW1 COMPLETE 12/21/2018 01/03/2019
Note: Released By: JHINDMAN
ZON HOLD 12/21/2018 12/21/2018
Note: Held By: TDOAK
PLENV HOLD 12/21/2018 12/21/2018
Note: Held By: JMYERS Please provide a Listed Species Assessment as Gopher Tortoise have been located in the area. Provide an overview of how access to the shoreline will be accommodated. Provide a status of permit modification with SJRWMD for the alteration of the Maintained Vegetated Buffer. Provide a copy of agreement with HOA giving permission to disturb the Maintained Vegetated Buffer. The following actions shall be taken during construction. All projects must use Florida Fish and Wildlife Conservation Commission (FFWCC) approved screens or barriers to prevent manatees from entering the construction zone. Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement. All projects shall implement a manatee observer with after action reporting. At least one person shall be designated as a manatee observer when in-water work is being performed. That person shall have experience in manatee observation and equipped with polarized sunglasses to aid in observation. The manatee observer must be on site during all in-water construction activities and will advise personnel to cease operation upon sighting a manatee within 50 feet of any in-water construction activity. Movement of a work barge, other associated vessels, or any in-water work shall not be performed after sunset, or before sunrise when the possibility of spotting manatees is negligible. All vessels associated with the construction project shall operate at “Idle Speed/No Wake” at all times while in the immediate area and while in water where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible. Any collision with or injury to a manatee shall be reported immediately to the FWC Hotline at 1-888-404-FWCC. Collision and/or injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336) for north Florida or Vero Beach (1-772-562-3909) for south Florida. Temporary signs concerning manatees shall be posted prior to and during all in-water project activities. All signs are to be removed by the permittee upon completion of the project. Awareness signs that have already been approved for this use by the Florida Fish and Wildlife Conservation Commission (FWC) must be used. One sign measuring at least 3 ft. by 4 ft. which reads Caution: Manatee Area must be posted. A second sign measuring at least 8-1/2” by 11” explaining the requirements for “Idle Speed/No Wake” and the shutdown of in-water operations must be posted in a location prominently visible to all personnel engaged in water-related activities. Construction staff shall undergo a pre-construction educational program to familiarize the staff with manatee regulations and proper in-water protocol to prevent harm to manatees.
ZON HOLD 12/21/2018 12/21/2018
Note: Held By: TDOAK 1. This permit requires a "Consent to Easement" by the ACOE Real Estate Division. 2. This permit application also requires a recorded easement agreement specific to this property from the Villages HOA.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN FEE ¤20.00 03/25/2019
PLAN CHECK FEE ¤40.00 03/25/2019
REMODEL/ADDITION/ACCES INSPECT ¤40.00 03/25/2019
SURCHARGE FS 533.721 ¤2.00 03/25/2019
SURCHARGE - FS 468.631 ¤2.00 03/25/2019
STORM WATER PERMIT FEES ¤80.00 03/25/2019
Fees Total Due: ¤0.00 Total Paid: ¤184.00