I want to search for...
Permit #2018120615
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7001-00150-0220 |
| CONDITIONED SPACE: 210 sqft |
| Total Square Footage: 210 sqft |
| Block: 00150 |
| Subdivision: 2143 - SECTION 1-FLORIDA PARK |
| Job Phone: 386-986-9350 |
| Location Address: 58 FLEETWOOD DR |
| Type: BA - BUILDING ADDITION |
| Issue Date: 01/28/2019 |
| NOC: RECORDED |
| Applicant name: GLENN ALAN BEAULIEU |
| Owner: HUANG ERNEST |
|
Address 58 FLEETWOOD DR PALM COAST, FL 32137 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤30,000.00 |
| Job Description: ADDITION TO HOME -EXTERIOR TO MATCH EXISTING |
| Type: CN |
Contractor
PALM COAST RESIDENTIAL SERVICES INC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
24 FIRETHORN LANE PALM COAST , FL 32137 |
CBC1255562 (Exp: 08/31/2026) | 386-986-9350 | 386-313-1897 |
Sub Contractors
STEVEN DUANE DENSLOW
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
317 RIO PINR DR Ormond Beach, FL 32174 |
EC0001678 (Exp: 08/31/2026) | 386-233-1553 | 386-673-5994 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/10/2019 | FINAL APPROVED | WMILLER |
| FINAL SURVEY (OFFICE USE ONLY) | 05/22/2019 | APPROVED | CTROHA |
| Note: Meets COPC requirements at time of inspection | |||
| U -UTILITY RESIDENTIAL FINAL | 05/15/2019 | FINAL APPROVED | JNICHOLS |
| INSULATION | 04/25/2019 | APPROVED | MWILLIAMS |
| ALL ROUGH | 04/23/2019 | APPROVED - AS NOTED | WMILLER |
| Note: NEED THE FOLLOWING BY INSULATION 1. FATENERS AT WINDOW 2. COMPLETE WINDOW FRAMING (MISSING AT BOTTOM OF WINDOW) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/03/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/29/2019 | Disapproved - NO FEE | JHINDMAN |
| Note: sheathing ok need collar ties per plans. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/12/2019 | Disapproved - NO FEE | WMILLER |
| Note: WRONG INSPECTION CALLED IN TIE BEAM LENTEL ADDED AND APPROVED... RE-CALL ROOF SHEATHING WHEN READY | |||
| TIE BEAM / LINTEL | 03/12/2019 | APPROVED - AS NOTED | WMILLER |
| Note: WRONG INSPECTION WAS CALLED IN THIS INSPECTION WAS NEEDED AND ADDED. RESULT IS APPROVED | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/08/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 02/04/2019 | APPROVED | WMILLER |
| Note: APPROVED |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 03/05/2019 | 03/08/2019 |
| Note: Released By: JHINDMAN Foundation Survey | |||
| MECH | COMPLETE | 01/11/2019 | 01/18/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 12/21/2018 | 01/03/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 12/21/2018 | 01/03/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 12/21/2018 | 01/03/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 12/21/2018 | 12/21/2018 |
| Note: Released By: TDOAK | |||
| MECH | HOLD | 12/21/2018 | 01/03/2019 |
| Note: Held By: JHINDMAN 1. Provide energy calculations and specifications for the a/c. 6th ed. FBC EC R405. | |||
| PLUM | CANCEL | 12/21/2018 | 01/03/2019 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 01/28/2019 |
| ELECTRIC FEE | ¤78.00 | 01/28/2019 |
| MECHANICAL FEE | ¤78.00 | 01/28/2019 |
| PLAN CHECK FEE | ¤40.00 | 01/28/2019 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 01/28/2019 |
| SITE PLAN 20 | ¤20.00 | 01/28/2019 |
| SURCHARGE FS 533.721 | ¤2.76 | 01/28/2019 |
| SURCHARGE - FS 468.631 | ¤4.14 | 01/28/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/28/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤362.90 |