Permit #2019010052

Permit Details

Status: COED

Parcel Id: 07-11-31-7030-00670-0170
CONDITIONED SPACE: 1571 sqft
GARAGE: 443 sqft
OPENED PORCH (WITH ROOF) : 201 sqft
OPENED PORCH (WITH ROOF) : 46 sqft
Total Square Footage: 2261 sqft
Block: 00670
Subdivision: 2154 - SECTION 30-ROYAL PALMS
Job Phone: 407-307-4753
Location Address: 15 RAMBLE WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/13/2019
NOC: RECORDED
Applicant name: SHAWN VIRAG
Owner: BRITE PROPERTIES OF FLORIDA, LLC

Address

619 EAST WASHINGTON ST

ORLANDO, FL 32808

Lot: 0170
Contracted Stated Job Value: ¤135,466.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SHAWNTELLE CONSULTING AND DESIGN LLC
Status Location Address State License Number Phone
CANCEL

611 LARGOVISTA DR

OAKLAND, FL 34787

CBC1261160 (Exp: 08/31/2020) 407-307-4753

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 08/16/2019 APPROVED - AS NOTED KHOWELL
Note: TOM WILL REMOVE CONCRETE FROM CULVERT PIPE
ROW - STORMWATER FINAL 08/16/2019 FINAL APPROVED KHOWELL
ROW - FINAL INSPECTION 08/16/2019 APPROVED KHOWELL
U -UTILITY RESIDENTIAL FINAL 08/16/2019 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 08/15/2019 APPROVED - AS NOTED KHOWELL
Note: REPAIR THE EROSION AT THE MITERED ENDS AND REMOVE DIRT FROM CULVERTS. WATER IS TRAPPED IN THE AREA TO THE LEFT OF THE GARAGE BEHIND THE SIDEWALK NEEDS TO BE FIXED.
U -UTILITY RESIDENTIAL FINAL 08/15/2019 CANCELLED BY INSPECTOR LFITZGERALD
Note: Pep tank full , not pumping down. Utility- Braeker keeps tripping -Ivan with city utility informed so he can correct problem.
BLD - BUILDING FINAL 08/15/2019 FINAL APPROVED DROCKWELL
FINAL SURVEY (OFFICE USE ONLY) 08/15/2019 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 08/13/2019 Disapproved - NO FEE KHOWELL
Note: THIS IS A REINSPECTION SEE NOTES ON SURVEY MARKUP
FINAL SURVEY (OFFICE USE ONLY) 08/08/2019 Disapproved - NO FEE KHOWELL
Note: SEE SURVEY MARK UP
ELECTRIC - EARLY POWER 07/30/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED POWER 3:10
ROW- PRE-APRON (PRE-POUR) 07/18/2019 APPROVED - AS NOTED KHOWELL
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. TELL THE FORM CONTRACTOR TO MAKE SURE THERE ARE NO NAILS IN THE ROAD, WHEN THEY FINISH FORMING DRIVEWAY
U - SEWER TIE IN 07/12/2019 APPROVED JGIBSON
GRAVITY SEWER TEST 07/12/2019 APPROVED JGIBSON
PEP TANK INSTALLATION REQUEST 06/25/2019 APPROVED CSTONE
Note: Once you request your pep tank we ask that you keep the site clear until the tank is in. You will have 72 hours after pep tank request has been approved to get the site ready. Site ready means area is clear without driveway, sod, paint, sidewalks, or irrigation in the way. If you have underground power where the pep tank will be located you will need to have that moved.
LATH/BRICK/ WATER BARRIER 06/20/2019 APPROVED DROCKWELL
INSULATION 06/07/2019 APPROVED JCOLASANTI
ALL ROUGH 06/05/2019 APPROVED DROCKWELL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/20/2019 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
ROOF VALLEY & METAL 05/20/2019 APPROVED DROCKWELL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/16/2019 Disapproved -FEE REQUIRED MWILLIAMS
Note: Kitchen load bearing wall. Improper stud spacing. Spacing for load bearing wall not to exceed 16" OC. Interior load bearing wall detail on plan calls for mid blocking on all bearing walls. Detail shows blocking laying flat. Cabinet backing blocks are not mid blocking per plan. Also mid blocking required in other load bearing walls internally. Load bearing wall in kitchen top plate has been notched to fit truss. Must have full thickness double top plate for truss bearing.
ELECTRIC-TUG 05/16/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED POWER 3:45
ELECTRIC-TUG 05/09/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED POWER 3:10
TIE BEAM / LINTEL 05/07/2019 APPROVED DROCKWELL
FOUND SURVEY APPROVED (OFFICE) 05/03/2019 APPROVED JHINDMAN
MONOLITHIC SLAB 04/29/2019 APPROVED MWILLIAMS
PLUMBING 1ST ROUGH UNDERGROUND 04/25/2019 APPROVED - AS NOTED JGIBSON
Note: NEED TO LIST CORRECT PLUMBING SUB CONTRACTOR BEFORE NEXT INSPECTION ''MONOLITHIC SLAB''

Review History

Department Status Date In Date Out
SW1 COMPLETE 05/01/2019 05/03/2019
Note: Released By: JHINDMAN foundation
UD1 COMPLETE 03/01/2019 03/04/2019
Note: Released By: LFITZGERALD PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap
PLUM COMPLETE 03/01/2019 03/07/2019
Note: Released By: JHINDMAN
ELEC COMPLETE 03/01/2019 03/07/2019
Note: Released By: JHINDMAN
ZON COMPLETE 01/28/2019 01/28/2019
Note: Released By: AMOBLEY
SW1 COMPLETE 01/28/2019 02/01/2019
Note: Released By: RLEE
PLUM HOLD 01/28/2019 02/04/2019
Note: Held By: JHINDMAN 1. Provide a signed and sealed plumbing riser plan or a plan signed by the plumbing contractor with their license number on it.
ELEC HOLD 01/28/2019 02/04/2019
Note: Held By: JHINDMAN 1. Provide a signed and sealedelectrical plan or a plan signed by the electrical contractor with their license number on it.6th ed. Florida building code 107.1.
UD1 HOLD 01/28/2019 01/30/2019
Note: Held By: MBACON PEP Panel not shown on electrical plans PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
SWALE COMPLETE 01/02/2019 01/15/2019
Note: Released By: TBAKER
BLD COMPLETE 01/02/2019 01/09/2019
Note: Released By: JHINDMAN
ELEC HOLD 01/02/2019 01/09/2019
Note: Held By: JHINDMAN 1. Provide receptacles between the bedroom door and the closet doors in the small bedrooms 6th ed. FBC R E3901.2.2. J. hindman 986-3784.
ENGIN1 COMPLETE 01/02/2019 01/15/2019
Note: Released By: TBAKER
MECH COMPLETE 01/02/2019 01/09/2019
Note: Released By: JHINDMAN
PLUM HOLD 01/02/2019 01/09/2019
Note: Held By: JHINDMAN 1. Provide a minimum 3" drain line to the master bath watercloset on the plumbing riser. 6th ed. FBC R Table P3005.4.1. J. Hindman 986-3784.
SW1 HOLD 01/02/2019 01/09/2019
Note: Held By: JHINDMAN 1. Provide a proposed drainage plan per the ULDC Tech Manual ch5 Provide The elevations on all adjacent properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. (5) The elevations at 20 foot intervals along all property lines. (6) The interior elevations at no greater than a 20 foot grid.
UD1 HOLD 01/02/2019 01/10/2019
Note: Held By: MBACON PEP Panel not shown on electrical plans PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
ZON HOLD 01/02/2019 01/03/2019
Note: Held By: AMOBLEY Survey must have total lot square footage

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 08/13/2019
REINSPECTION FEE ¤40.00 08/13/2019
NEW RESIDENTIAL INSPECTIONS ¤406.00 03/13/2019
SITE PLAN 20 ¤20.00 03/13/2019
SURCHARGE FS 533.721 ¤10.73 03/13/2019
SURCHARGE - FS 468.631 ¤16.09 03/13/2019
STORM WATER PERMIT FEES ¤80.00 03/13/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 03/13/2019
ADMIN FEE ¤20.00 03/13/2019
ELECTRIC FEE ¤181.80 03/13/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 03/13/2019
IMPACT FEE FIRE ¤223.38 03/13/2019
IMPACT FEE PARKS ¤849.24 03/13/2019
IMPACT FEE SCHOOL ¤3,600.00 03/13/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 03/13/2019
MECHANICAL FEE ¤181.80 03/13/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 03/13/2019
PLAN CHECK FEE ¤81.20 03/13/2019
PLUMBING FEE ¤181.80 03/13/2019
Fees Total Due: ¤0.00 Total Paid: ¤7,482.90