Permit #2019010184
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7037-00860-0080 |
| CONDITIONED SPACE: 546 sqft |
| OPENED PORCH (WITH ROOF) : 403 sqft |
| Total Square Footage: 949 sqft |
| Block: 00860 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 386-338-1755 |
| Location Address: 19 LAKE SUCCESS DR |
| Type: BA - BUILDING ADDITION |
| Issue Date: 02/27/2019 |
| NOC: RECORDED |
| Applicant name: SOPHAN KES |
| Owner: KENNEDY PETER F & MAUREEN J KENNEDY H&W |
|
Address 4 WICCOPEA COURTY PUTNAM VALLEY, NY 10579 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤92,000.00 |
| Job Description: ADDITION |
| Type: CN |
Contractor
KES CONSTRUCTION INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
107 BURROUGHS PALM COAST, FL 32164 |
CRC1332024 (Exp: 08/31/2022) | 386-338-1755 |
Sub Contractors
CHRISTOPHER I HALL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
60 COOPER LANE PALM COAST, FL 32137 |
EC13008029 (Exp: 08/31/2028) | 386-225-1937 |
ROBERT JAMES BARROW JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2323 N STATE ST BUNNELL, FL 32110 |
UNIT 126 BUNNELL, FL 32110 |
CAC1817890 (Exp: 08/31/2026) | 386-627-5500 |
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 08/26/2019 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION. PER HOMEOWNER. LOT IS SOON TO BE REGRADED. THEREFORE CONTRACTOR DOES NOT NEED TO SEED AND STRAW. | |||
| ROW - FINAL APRON (AFTER POUR) | 08/23/2019 | CANCELLED BY APPLICANT | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 08/20/2019 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 08/20/2019 | Disapproved -FEE REQUIRED | RGROSS |
| Note: SEED AND STRAW ALL BARE EARTH AREAS IN THE VACANT USE AS AN ACCESS AND STAGING POINT FOR CONSTRUCTION. | |||
| BLD - BUILDING FINAL | 08/19/2019 | Disapproved - NO FEE | JDELBONIS |
| Note: GFCI’S NEEDED, 210.8-A, ALL 120 VOLT SINGLE PHASE 15 AND 20 AMP RECEPTICLES INSTALLED IN LOCATIONS SPECIFIED IN 1 TROUGH 8 SHALL HAVE GFCI PROTECTION (1. BATHROOMS,2. GARAGES, 3. OUT DOORS, 4. CRAWL SPACES, 5. UNFINISHED BASEMENTS, 6.KITCHENS, 7, SINKS-LOCATED IN AREAS OTHER THAN KITCHENS WITHIN 6ft OF THE EDGE OF THE SINK | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/16/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/06/2019 | Disapproved - NO FEE | RGROSS |
| Note: FINAL SURVEY SHOULD NOT BE TURNED IN UNTIL ALL SOD REPLACEMENT AND LOT DISTURBANCE HAS BEEN RESTORED ON THE SWALE AND ENTRANCE AREA TO ACCESS THE ADDITION SITE. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/31/2019 | FINAL APPROVED | JHARDING |
| LATH/BRICK/ WATER BARRIER | 06/11/2019 | APPROVED | JCOLASANTI |
| INSULATION | 05/28/2019 | APPROVED | JCOLASANTI |
| ALL ROUGH | 05/23/2019 | APPROVED | JCOLASANTI |
| ROOF VALLEY & METAL | 05/21/2019 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/26/2019 | APPROVED | JCOLASANTI |
| TIE BEAM / LINTEL | 04/08/2019 | APPROVED | JCOLASANTI |
| FOUND SURVEY APPROVED (OFFICE) | 04/05/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 03/25/2019 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/21/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS IS A REINSPECTION THIS INSPECTION WAS DONE ON 3/18/19 THE ONLY ISSUE WAS NEEDED TO LIST CORRECT PLUMBING SUB-CONTRACTOR. THE CORRECT SUB IS NOW LISTED CORRECTLY | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/18/2019 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NEED TO LIST CORRECT PLUMBING SUB-CONTRACTOR. I SPOKE WITH HEATH SANFORD AND WAS TOLD HE DID NOT PERFORM WORK ON THIS JOB. NED TO SUBMIT NEW PLUMBING CONTRACTOR AND ALL OTHERS THAT HAVE BEEN CHANGED AFTER PERMIT WAS ISSUED |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/21/2019 | 06/28/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 06/21/2019 | 06/21/2019 |
| Note: Released By: TDOAK | |||
| SW1 | COMPLETE | 04/01/2019 | 04/05/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 02/19/2019 | 02/19/2019 |
| Note: Released By: AMOBLEY | |||
| ELEC | COMPLETE | 02/19/2019 | 02/26/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | HOLD | 02/06/2019 | 02/07/2019 |
| Note: Held By: AMOBLEY Paperwork was received. This was sent to city utilities for release as well. Once approved the agreement will be drawn up for owners to sign and then the permit can be released. | |||
| ELEC | HOLD | 02/06/2019 | 02/13/2019 |
| Note: Held By: JHINDMAN Provide load calculations and riser. The load calculations must show the existing load along with the new load to make sure the service is large enough. | |||
| PLUM | COMPLETE | 02/06/2019 | 02/13/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 01/07/2019 | 01/10/2019 |
| Note: Released By: RLEE | |||
| ELEC | HOLD | 01/07/2019 | 01/10/2019 |
| Note: Held By: RLEE Provide load calculations and riser. | |||
| MECH | COMPLETE | 01/07/2019 | 01/10/2019 |
| Note: Released By: RLEE | |||
| PLUM | HOLD | 01/07/2019 | 01/10/2019 |
| Note: Held By: RLEE Provide layout for pool equipment being moved, sizing, etc. | |||
| SW1 | COMPLETE | 01/07/2019 | 01/10/2019 |
| Note: Released By: RLEE | |||
| ZON | HOLD | 01/07/2019 | 01/07/2019 |
| Note: Held By: AMOBLEY Must provide termination of easement application paperwork with utility release letters |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 08/22/2019 |
| CONTRACTOR CHANGE | ¤40.00 | 08/19/2019 |
| REINSPECTION FEE | ¤40.00 | 08/19/2019 |
| ADMIN FEE | ¤20.00 | 02/27/2019 |
| ELECTRIC FEE | ¤115.20 | 02/27/2019 |
| RECORDING FEE REIMBURSE DOC | ¤35.50 | 02/27/2019 |
| MECHANICAL FEE | ¤115.20 | 02/27/2019 |
| PLAN CHECK FEE | ¤40.00 | 02/27/2019 |
| PLUMBING FEE | ¤115.20 | 02/27/2019 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 02/27/2019 |
| SITE PLAN 20 | ¤20.00 | 02/27/2019 |
| SURCHARGE FS 533.721 | ¤4.66 | 02/27/2019 |
| SURCHARGE - FS 468.631 | ¤6.98 | 02/27/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/27/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤712.74 |