I want to search for...
Permit #2019010255
Permit Details
Status: COED
| Parcel Id: 29-10-31-5540-00000-0310 |
| CONDITIONED SPACE: 935 sqft |
| CONDITIONED SPACE: 4486 sqft |
| GARAGE: 926 sqft |
| OPENED PORCH (WITH ROOF) : 296 sqft |
| OPENED PORCH (WITH ROOF) : 657 sqft |
| OPENED PORCH (WITH ROOF) : 132 sqft |
| OPENED PORCH (WITH ROOF) : 302 sqft |
| Total Square Footage: 7734 sqft |
| Block: 00000 |
| Subdivision: 1005 - SANCTUARY SUBDIVISION |
| Job Phone: (386)446-5161 |
| Location Address: 56 OLD OAK DR S |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/29/2019 |
| NOC: RECORDED |
| Applicant name: HUGO A CAMACHO |
| Owner: BRAYTON SALLY |
|
Address 144 COCHISE COURT PALM COAST, FL 32137 |
| Lot: 0310 |
| Contracted Stated Job Value: ¤500,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
IDEAL HOMES AT PALM COAST, INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 353639 PALM COAST, FL 32137 |
CBC1250774 (Exp: 08/31/2026) | (386)446-5161 | (386)447-0238 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CCC1331939 (Exp: 08/31/2026) | 386-445-7945 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/23/2020 | FINAL APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION GFCI oulets outside , bathrooms , garage , under kitchen sink , landury room lock out brakers wall oven list is too long check all electric | |||
| BLD - BUILDING FINAL | 04/22/2020 | CANCELLED BY APPLICANT | JDELBONIS |
| Note: THIS IS A REINSPECTION GFCI oulets outside , bathrooms , garage , under kitchen sink , landury room lock out brakers wall oven list is too long check all electric | |||
| BLD - BUILDING FINAL | 04/21/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: GFCI oulets outside , bathrooms , garage , under kitchen sink , landury room lock out brakers wall oven list is too long check all electric | |||
| U -UTILITY RESIDENTIAL FINAL | 04/17/2020 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 04/02/2020 | APPROVED - AS NOTED | RGROSS |
| Note: LARGE AREA ACROSS THE DRAINAGE DITCH HAS SOD PENDING UNTIL THE EQUIPMENT FOR THE NEW DOCK IS BROUGHT IN. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/02/2020 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/31/2020 | APPROVED - AS NOTED | RGROSS |
| Note: LARGE AREA ACROSS THE DRAINAGE DITCH IN THE REAR WILL BE SODDED AFTER THE EQUIPMENT FOR THE NEW DOCK HAS BEEN MOVED TO AVOID DAMAGE TO THE NEW SOD. SPOKE ON SITE WITH HOMEOWNER. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/31/2020 | APPROVED - AS NOTED | RGROSS |
| Note: SEE NOTES ON THE FIELD SURVEY | |||
| ELECTRIC - EARLY POWER | 02/04/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 2:00 | |||
| ROW- PRE-APRON (PRE-POUR) | 01/16/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW- PAVER RESTRAINTS | 12/11/2019 | APPROVED - AS NOTED | RGROSS |
| Note: RESTRAINTS APPROVED BUT BASE DEPTH IN THE ROW IS NOT DEEP ENOUGH. SEE PRE POUR RESULTS. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/11/2019 | Disapproved -FEE REQUIRED | RGROSS |
| Note: PAVER SUB BASE WILL NOT BE THICK ENOUGH IN THE ROW AS FORMED AND GRADED. IF CONCRETE IS BEING POURING IN THE ENTIRE ROW MATERIAL PILED UP FROM THE RESTRAINTS WILL NOT ALLOW FOR A THICK ENOUGH CONCRETE BASE. PHOTO'S ATTACHED. | |||
| U - SEWER TIE IN | 11/14/2019 | APPROVED | FWILLIS |
| GRAVITY SEWER TEST | 11/14/2019 | APPROVED | FWILLIS |
| INSULATION | 10/22/2019 | APPROVED | MWILLIAMS |
| LATH/BRICK/ WATER BARRIER | 10/17/2019 | APPROVED | MWILLIAMS |
| ALL ROUGH | 10/09/2019 | APPROVED | FWILLIS |
| GAS ROUGH | 10/09/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS FOR A GAS ROUGH ON INTERIOR OF HOUSE, ALL GAS APPROVED FOR LOCATIONS LISTED ON PERMIT | |||
| WALL SHEATHING | 09/12/2019 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 08/29/2019 | APPROVED | WMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/15/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 08/15/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/07/2019 | Disapproved - NO FEE | WMILLER |
| Note: THIS IS A REINSPECTION Need to complete deficiencies noted at last inspection as well as the following noted today 1. MISSING MTS20's AT FLOOR TRUSSES PER DETAIL 2. MISING FASTENERS AT TRUSS 38 FRONT WALL 3. MISSING CENTER STRAPS ON TRUSSES 34, 35, AND 36 4. LOOSE THREADED RODS OT FRONT WALL UP STAIRS | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/02/2019 | Disapproved - NO FEE | WMILLER |
| Note: Looked at first floor only except gable end bracing and observed the following... 1. Plans call for 3-2x12 for headers at openings in (frame wall typical opening detail) (need revision by final) 2. missing double jacks at openings per (frame wall typical opening detail) 3. missing fasteners at truss 36 and truss 37 connection to girder on back borch 4. missing Mitek 3x6 at 48 inches OC per engineering (WILL LOOK AT SECOND STORY AND GABLE BRACING WHEN WE COME BACK TO LOOK AT THE ITEMS ABOVE | |||
| ELECTRIC-TUG | 05/31/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 3:30 | |||
| TIE BEAM / LINTEL | 05/23/2019 | APPROVED | WMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 05/21/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 04/25/2019 | APPROVED | WMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/15/2019 | APPROVED | WMILLER |
| RETAINING WALL | 03/21/2019 | APPROVED | MWILLIAMS |
| RETAINING WALL FOUNDATION | 03/08/2019 | APPROVED | MWILLIAMS |
| STEM WALL FOUNDATION | 03/08/2019 | APPROVED | MWILLIAMS |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 11/22/2019 | 11/22/2019 |
| Note: Released By: AMOBLEY | |||
| ZON | HOLD | 11/21/2019 | 11/22/2019 |
| Note: Held By: ELENS Revised landscape plans does not show the required 14 trees. Revised landscape plan does not show landscaping to the left of the entry. | |||
| UD1 | COMPLETE | 11/21/2019 | 11/26/2019 |
| Note: Released By: AHALL | |||
| SW1 | COMPLETE | 11/21/2019 | 11/21/2019 |
| Note: Released By: CTROHA | |||
| ENGIN1 | COMPLETE | 11/21/2019 | 11/21/2019 |
| Note: Released By: TBAKER | |||
| ELEC | COMPLETE | 09/30/2019 | 09/30/2019 |
| Note: Released By: JMUNSON | |||
| PLUM | COMPLETE | 09/19/2019 | 09/26/2019 |
| Note: Released By: MGARRETT | |||
| BLD | COMPLETE | 08/13/2019 | 08/20/2019 |
| Note: Released By: MGARRETT | |||
| BLD | COMPLETE | 07/15/2019 | 07/19/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 05/14/2019 | 05/17/2019 |
| Note: Released By: JHINDMAN Foundation S | |||
| ZON | COMPLETE | 03/01/2019 | 03/01/2019 |
| Note: Released By: AMOBLEY | |||
| ZON | HOLD | 02/27/2019 | 02/28/2019 |
| Note: Held By: TDOAK Plans must note that retaining wall will be finished masonry walls where seams are not visible and must be painted to match the house. | |||
| BLD | COMPLETE | 02/19/2019 | 02/26/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | HOLD | 02/19/2019 | 02/19/2019 |
| Note: Held By: AMOBLEY Please specify only the retaining wall with setbacks on survey not the pool area. We can not approve a pool deck on a house permit. | |||
| ZON | COMPLETE | 01/18/2019 | 01/18/2019 |
| Note: Released By: AMOBLEY | |||
| PLUM | COMPLETE | 01/18/2019 | 01/28/2019 |
| Note: Released By: JHINDMAN | |||
| MECH | COMPLETE | 01/18/2019 | 01/28/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 01/18/2019 | 01/28/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 01/18/2019 | 01/28/2019 |
| Note: Released By: JHINDMAN | |||
| PLFM | COMPLETE | 01/09/2019 | 01/09/2019 |
| Note: Released By: JMYERS Based on the Site Plan submitted 1/8/19, the structure will be outside of the Special Flood Hazard Area that resides on the property. No elevation certificates will be required. | |||
| BLD | HOLD | 01/08/2019 | 01/14/2019 |
| Note: Held By: JHINDMAN 1. Provide plans designed to the 6th edition (2017) Florida building Code and the 2014 NEC. J. Hindman 986-3784. | |||
| ELEC | HOLD | 01/08/2019 | 01/14/2019 |
| Note: Held By: JHINDMAN 1. Provide plans designed to the 6th edition (2017) Florida building Code and the 2014 NEC. J. Hindman 986-3784. | |||
| ENGIN1 | COMPLETE | 01/08/2019 | 01/09/2019 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 01/08/2019 | 01/14/2019 |
| Note: Held By: JHINDMAN 1. Provide plans designed to the 6th edition (2017) Florida building Code and the 2014 NEC. J. Hindman 986-3784. | |||
| PLUM | HOLD | 01/08/2019 | 01/14/2019 |
| Note: Held By: JHINDMAN 1. Provide plans designed to the 6th edition (2017) Florida building Code and the 2014 NEC. J. Hindman 986-3784. | |||
| SW1 | COMPLETE | 01/08/2019 | 01/14/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 01/08/2019 | 01/14/2019 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind | |||
| ZON | HOLD | 01/08/2019 | 01/09/2019 |
| Note: Held By: AMOBLEY Per the LDC a single family residence can not have an office. Please change the room labeled office on plans |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 04/23/2020 |
| REINSPECTION FEE | ¤40.00 | 04/23/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,392.00 | 01/29/2019 |
| SITE PLAN 20 | ¤20.00 | 01/29/2019 |
| SURCHARGE FS 533.721 | ¤31.43 | 01/29/2019 |
| SURCHARGE - FS 468.631 | ¤47.15 | 01/29/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/29/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 01/29/2019 |
| ADMIN FEE | ¤20.00 | 01/29/2019 |
| ELECTRIC FEE | ¤477.60 | 01/29/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 01/29/2019 |
| IMPACT FEE FIRE | ¤223.38 | 01/29/2019 |
| IMPACT FEE PARKS | ¤849.24 | 01/29/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/29/2019 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 01/29/2019 |
| MECHANICAL FEE | ¤477.60 | 01/29/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/29/2019 |
| PLAN CHECK FEE | ¤278.40 | 01/29/2019 |
| PLUMBING FEE | ¤477.60 | 01/29/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,913.79 |