I want to search for...

Permit #2019010255

Permit Details

Status: COED

Parcel Id: 29-10-31-5540-00000-0310
CONDITIONED SPACE: 935 sqft
CONDITIONED SPACE: 4486 sqft
GARAGE: 926 sqft
OPENED PORCH (WITH ROOF) : 296 sqft
OPENED PORCH (WITH ROOF) : 657 sqft
OPENED PORCH (WITH ROOF) : 132 sqft
OPENED PORCH (WITH ROOF) : 302 sqft
Total Square Footage: 7734 sqft
Block: 00000
Subdivision: 1005 - SANCTUARY SUBDIVISION
Job Phone: (386)446-5161
Location Address: 56 OLD OAK DR S
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/29/2019
NOC: RECORDED
Applicant name: HUGO A CAMACHO
Owner: BRAYTON SALLY

Address

144 COCHISE COURT

PALM COAST, FL 32137

Lot: 0310
Contracted Stated Job Value: ¤500,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

IDEAL HOMES AT PALM COAST, INC.
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 353639

PALM COAST, FL 32137

CBC1250774 (Exp: 08/31/2026) (386)446-5161 (386)447-0238

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
CHRISTOPHER DANIEL FULTON
Status Location Address Mailing Address State License Number Phone
ACTIVE

2 MARKET PLACE

PALM COAST, FL 32137

UNIT D

PALM COAST, FL 32137

CCC1331939 (Exp: 08/31/2026) 386-445-7945

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/23/2020 FINAL APPROVED JDELBONIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION GFCI oulets outside , bathrooms , garage , under kitchen sink , landury room lock out brakers wall oven list is too long check all electric
BLD - BUILDING FINAL 04/22/2020 CANCELLED BY APPLICANT JDELBONIS
Note: THIS IS A REINSPECTION GFCI oulets outside , bathrooms , garage , under kitchen sink , landury room lock out brakers wall oven list is too long check all electric
BLD - BUILDING FINAL 04/21/2020 Disapproved -FEE REQUIRED JDELBONIS
Note: GFCI oulets outside , bathrooms , garage , under kitchen sink , landury room lock out brakers wall oven list is too long check all electric
U -UTILITY RESIDENTIAL FINAL 04/17/2020 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 04/02/2020 APPROVED - AS NOTED RGROSS
Note: LARGE AREA ACROSS THE DRAINAGE DITCH HAS SOD PENDING UNTIL THE EQUIPMENT FOR THE NEW DOCK IS BROUGHT IN.
ROW - FINAL APRON (AFTER POUR) 04/02/2020 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 03/31/2020 APPROVED - AS NOTED RGROSS
Note: LARGE AREA ACROSS THE DRAINAGE DITCH IN THE REAR WILL BE SODDED AFTER THE EQUIPMENT FOR THE NEW DOCK HAS BEEN MOVED TO AVOID DAMAGE TO THE NEW SOD. SPOKE ON SITE WITH HOMEOWNER.
FINAL SURVEY (OFFICE USE ONLY) 03/31/2020 APPROVED - AS NOTED RGROSS
Note: SEE NOTES ON THE FIELD SURVEY
ELECTRIC - EARLY POWER 02/04/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 2:00
ROW- PRE-APRON (PRE-POUR) 01/16/2020 APPROVED RGROSS
Note: THIS IS A REINSPECTION
ROW- PAVER RESTRAINTS 12/11/2019 APPROVED - AS NOTED RGROSS
Note: RESTRAINTS APPROVED BUT BASE DEPTH IN THE ROW IS NOT DEEP ENOUGH. SEE PRE POUR RESULTS.
ROW- PRE-APRON (PRE-POUR) 12/11/2019 Disapproved -FEE REQUIRED RGROSS
Note: PAVER SUB BASE WILL NOT BE THICK ENOUGH IN THE ROW AS FORMED AND GRADED. IF CONCRETE IS BEING POURING IN THE ENTIRE ROW MATERIAL PILED UP FROM THE RESTRAINTS WILL NOT ALLOW FOR A THICK ENOUGH CONCRETE BASE. PHOTO'S ATTACHED.
U - SEWER TIE IN 11/14/2019 APPROVED FWILLIS
GRAVITY SEWER TEST 11/14/2019 APPROVED FWILLIS
INSULATION 10/22/2019 APPROVED MWILLIAMS
LATH/BRICK/ WATER BARRIER 10/17/2019 APPROVED MWILLIAMS
ALL ROUGH 10/09/2019 APPROVED FWILLIS
GAS ROUGH 10/09/2019 APPROVED - AS NOTED JGIBSON
Note: THIS WAS FOR A GAS ROUGH ON INTERIOR OF HOUSE, ALL GAS APPROVED FOR LOCATIONS LISTED ON PERMIT
WALL SHEATHING 09/12/2019 APPROVED FWILLIS
ROOF VALLEY & METAL 08/29/2019 APPROVED WMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/15/2019 APPROVED MWILLIAMS
Note: THIS IS A REINSPECTION
ALL ROUGH 08/15/2019 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/07/2019 Disapproved - NO FEE WMILLER
Note: THIS IS A REINSPECTION Need to complete deficiencies noted at last inspection as well as the following noted today 1. MISSING MTS20's AT FLOOR TRUSSES PER DETAIL 2. MISING FASTENERS AT TRUSS 38 FRONT WALL 3. MISSING CENTER STRAPS ON TRUSSES 34, 35, AND 36 4. LOOSE THREADED RODS OT FRONT WALL UP STAIRS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/02/2019 Disapproved - NO FEE WMILLER
Note: Looked at first floor only except gable end bracing and observed the following... 1. Plans call for 3-2x12 for headers at openings in (frame wall typical opening detail) (need revision by final) 2. missing double jacks at openings per (frame wall typical opening detail) 3. missing fasteners at truss 36 and truss 37 connection to girder on back borch 4. missing Mitek 3x6 at 48 inches OC per engineering (WILL LOOK AT SECOND STORY AND GABLE BRACING WHEN WE COME BACK TO LOOK AT THE ITEMS ABOVE
ELECTRIC-TUG 05/31/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED POWER 3:30
TIE BEAM / LINTEL 05/23/2019 APPROVED WMILLER
FOUND SURVEY APPROVED (OFFICE) 05/21/2019 APPROVED JHINDMAN
MONOLITHIC SLAB 04/25/2019 APPROVED WMILLER
PLUMBING 1ST ROUGH UNDERGROUND 04/15/2019 APPROVED WMILLER
RETAINING WALL 03/21/2019 APPROVED MWILLIAMS
RETAINING WALL FOUNDATION 03/08/2019 APPROVED MWILLIAMS
STEM WALL FOUNDATION 03/08/2019 APPROVED MWILLIAMS

Review History

Department Status Date In Date Out
ZON COMPLETE 11/22/2019 11/22/2019
Note: Released By: AMOBLEY
ZON HOLD 11/21/2019 11/22/2019
Note: Held By: ELENS Revised landscape plans does not show the required 14 trees. Revised landscape plan does not show landscaping to the left of the entry.
UD1 COMPLETE 11/21/2019 11/26/2019
Note: Released By: AHALL
SW1 COMPLETE 11/21/2019 11/21/2019
Note: Released By: CTROHA
ENGIN1 COMPLETE 11/21/2019 11/21/2019
Note: Released By: TBAKER
ELEC COMPLETE 09/30/2019 09/30/2019
Note: Released By: JMUNSON
PLUM COMPLETE 09/19/2019 09/26/2019
Note: Released By: MGARRETT
BLD COMPLETE 08/13/2019 08/20/2019
Note: Released By: MGARRETT
BLD COMPLETE 07/15/2019 07/19/2019
Note: Released By: JHINDMAN
SW1 COMPLETE 05/14/2019 05/17/2019
Note: Released By: JHINDMAN Foundation S
ZON COMPLETE 03/01/2019 03/01/2019
Note: Released By: AMOBLEY
ZON HOLD 02/27/2019 02/28/2019
Note: Held By: TDOAK Plans must note that retaining wall will be finished masonry walls where seams are not visible and must be painted to match the house.
BLD COMPLETE 02/19/2019 02/26/2019
Note: Released By: JHINDMAN
ZON HOLD 02/19/2019 02/19/2019
Note: Held By: AMOBLEY Please specify only the retaining wall with setbacks on survey not the pool area. We can not approve a pool deck on a house permit.
ZON COMPLETE 01/18/2019 01/18/2019
Note: Released By: AMOBLEY
PLUM COMPLETE 01/18/2019 01/28/2019
Note: Released By: JHINDMAN
MECH COMPLETE 01/18/2019 01/28/2019
Note: Released By: JHINDMAN
ELEC COMPLETE 01/18/2019 01/28/2019
Note: Released By: JHINDMAN
BLD COMPLETE 01/18/2019 01/28/2019
Note: Released By: JHINDMAN
PLFM COMPLETE 01/09/2019 01/09/2019
Note: Released By: JMYERS Based on the Site Plan submitted 1/8/19, the structure will be outside of the Special Flood Hazard Area that resides on the property. No elevation certificates will be required.
BLD HOLD 01/08/2019 01/14/2019
Note: Held By: JHINDMAN 1. Provide plans designed to the 6th edition (2017) Florida building Code and the 2014 NEC. J. Hindman 986-3784.
ELEC HOLD 01/08/2019 01/14/2019
Note: Held By: JHINDMAN 1. Provide plans designed to the 6th edition (2017) Florida building Code and the 2014 NEC. J. Hindman 986-3784.
ENGIN1 COMPLETE 01/08/2019 01/09/2019
Note: Released By: TBAKER
MECH HOLD 01/08/2019 01/14/2019
Note: Held By: JHINDMAN 1. Provide plans designed to the 6th edition (2017) Florida building Code and the 2014 NEC. J. Hindman 986-3784.
PLUM HOLD 01/08/2019 01/14/2019
Note: Held By: JHINDMAN 1. Provide plans designed to the 6th edition (2017) Florida building Code and the 2014 NEC. J. Hindman 986-3784.
SW1 COMPLETE 01/08/2019 01/14/2019
Note: Released By: JHINDMAN
UD1 COMPLETE 01/08/2019 01/14/2019
Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind
ZON HOLD 01/08/2019 01/09/2019
Note: Held By: AMOBLEY Per the LDC a single family residence can not have an office. Please change the room labeled office on plans

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 04/23/2020
REINSPECTION FEE ¤40.00 04/23/2020
NEW RESIDENTIAL INSPECTIONS ¤1,392.00 01/29/2019
SITE PLAN 20 ¤20.00 01/29/2019
SURCHARGE FS 533.721 ¤31.43 01/29/2019
SURCHARGE - FS 468.631 ¤47.15 01/29/2019
STORM WATER PERMIT FEES ¤80.00 01/29/2019
3% TRANS IMPACT FEE CREDIT (¤89.43) 01/29/2019
ADMIN FEE ¤20.00 01/29/2019
ELECTRIC FEE ¤477.60 01/29/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 01/29/2019
IMPACT FEE FIRE ¤223.38 01/29/2019
IMPACT FEE PARKS ¤849.24 01/29/2019
IMPACT FEE SCHOOL ¤3,600.00 01/29/2019
IMPACT FEE TRANSPORTATION ¤2,981.00 01/29/2019
MECHANICAL FEE ¤477.60 01/29/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 01/29/2019
PLAN CHECK FEE ¤278.40 01/29/2019
PLUMBING FEE ¤477.60 01/29/2019
Fees Total Due: ¤0.00 Total Paid: ¤10,913.79