I want to search for...

Permit #2019010269

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7022-00170-0100
Block: 00170
Subdivision: 2217 - SECTION 22-WYNNFIELD
Job Phone: 386-566-7804
Location Address: 49 WESTOVER LN
Type: DR - DRIVEWAY
Issue Date: 02/01/2019
NOC: RECORDED
Applicant name: ERIC KACHNYCZ
Owner: ALLEN DONALD E & DONNA M H&W

Address

49 WESTOVER LANE

PALM COAST, FL 32164

Lot: 0100
Contracted Stated Job Value: ¤7,500.00
Job Description: PAVER DRIVEWAY
Type: CN

Contractor

DONE RIGHT SINCE 1985
Status Location Address Phone
ACTIVE

1405 KINGS ESTATE RD

ST AUGUSTINE, FL 32086

(904) 533-6373

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 02/21/2019 APPROVED RGROSS
ROW - FINAL INSPECTION 02/21/2019 FINAL APPROVED RGROSS
U -UTILITY RESIDENTIAL FINAL 02/21/2019 FINAL APPROVED AHALL
ROW- PRE-APRON (PRE-POUR) 02/08/2019 APPROVED KHOWELL
ROW- PAVER RESTRAINTS 02/07/2019 APPROVED KHOWELL
ROW- PRE-APRON (PRE-POUR) 02/07/2019 APPROVED - AS NOTED KHOWELL
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ROW- PRE-APRON (PRE-POUR) 02/06/2019 Disapproved -FEE REQUIRED KHOWELL
Note: 1. PIPE IS OUT OF TOLERANCE SLOPED WRONG DIRECTION 2. THE BIGGER FOOTER IS REQUIRED IN THE R.O.W. AREA 3. FOOTERS ARE REQUIRED TO BE DUG OUT AT TIME OF INSPECTION 6" DEEP 4. THE FORMS FOR THE CULVERT PIPE ARE REQUIRED TO BE 18" OFF THE EDGE OF THE PIPE 5. THE EXISTING EDGE OF PAVEMENT NEEDS TO BE FORMED SO NO CONCRETE IS POURED INTO THE ROADWAY 6. APRON FORMS LOOK HIGH PAVERS CAN BE A MAXIMUM OF 3/4" ABOVE THE EDGE OF PAVEMENT 7. THERE IS NOT A PROPOSED DRIVEWAY WIDTH ON SITE PLAN 8. 2" OF CONCRETE IS REQUIRED ABOVE THE CULVERT OPENING IF PAVERS ARE NOT GOING TO BE INSTALLED OVER IT. 9. REBAR FOR FOOTER IS REQUIRED TO BE ON SITE AT TIME OF INSPECTION 10. ADD A FORM BOARD AT THE EDGE OF PAVEMENT SO THE INSIDE OF IT LINES UP WITH THE EDGE OF PAVEMENT

Review History

Department Status Date In Date Out
ZON COMPLETE 01/17/2019 01/18/2019
Note: Released By: AMOBLEY
ENGIN1 COMPLETE 01/08/2019 01/11/2019
Note: Released By: TBAKER
SW1 COMPLETE 01/08/2019 01/10/2019
Note: Released By: JHINDMAN
UD1 COMPLETE 01/08/2019 01/14/2019
Note: Released By: LFITZGERALD All Concrete, Driveways, Pavers, Pools / Sidewalks ETC. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind.
ZON HOLD 01/08/2019 01/09/2019
Note: Held By: TAWILLIAMS 1) Need Right-A-Way Utilization Agreement signed by owners 2) Need right side setback from driveway to property line

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 02/20/2019
SITE PLAN 20 ¤20.00 02/01/2019
SURCHARGE FS 533.721 ¤2.00 02/01/2019
SURCHARGE - FS 468.631 ¤2.00 02/01/2019
STORM WATER PERMIT FEES ¤40.00 02/01/2019
ADMIN FEE ¤20.00 02/01/2019
RECORDING FEE REIMBURSE DOC ¤44.00 02/01/2019
Fees Total Due: ¤0.00 Total Paid: ¤168.00