Permit #2019010272
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01190-0030 |
| CONDITIONED SPACE: 1502 sqft |
| OPENED PORCH (WITH ROOF) : 234 sqft |
| GARAGE: 436 sqft |
| OPENED PORCH (WITH ROOF) : 70 sqft |
| Total Square Footage: 2242 sqft |
| Block: 01190 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-447-4151 |
| Location Address: 35 EDGE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/15/2019 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: FLORIDA GREEN CONSTRUCTION INC |
|
Address 38-50 VANORE DRIVE FAIR LAWN, NJ 07410 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GREGG A MCANALLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE PALM COAST, FL 32092 |
CAC1815760 (Exp: 08/31/2022) | 904-829-8898 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/06/2019 | FINAL APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 08/28/2019 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Master bath GFI will n ot re-set | |||
| ROW - FINAL APRON (AFTER POUR) | 08/23/2019 | APPROVED | KHOWELL |
| ROW - STORMWATER FINAL | 08/23/2019 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 08/23/2019 | APPROVED | AHALL |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/22/2019 | APPROVED | KHOWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 08/22/2019 | APPROVED | KHOWELL |
| ELECTRIC - EARLY POWER | 07/23/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 3:10 | |||
| ROW- PRE-APRON (PRE-POUR) | 07/18/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| U - SEWER TIE IN | 07/12/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 07/12/2019 | APPROVED | JGIBSON |
| PEP TANK INSTALLATION REQUEST | 06/28/2019 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 06/06/2019 | APPROVED | DROCKWELL |
| INSULATION | 06/05/2019 | APPROVED | MWILLIAMS |
| ALL ROUGH | 05/30/2019 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/17/2019 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 04/08/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/04/2019 | CANCELLED BY APPLICANT | WMILLER |
| TIE BEAM / LINTEL | 03/15/2019 | APPROVED | MWILLIAMS |
| TIE BEAM / LINTEL | 03/14/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: CLEANOUT OPENINGS…. R606.13.7, and 609.1.5 CLEANOUT OPENINGS SHALL BE PROVIDED, MINIMUM 3 inch OPENING | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/13/2019 | APPROVED | RLEE |
| MONOLITHIC SLAB | 02/19/2019 | APPROVED - AS NOTED | MWILLIAMS |
| Note: must have approved trash recepticle on site and clean up construction debris prior to next inspection. Loose plastic has blown into roadway cardboard boxes littering site. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/08/2019 | APPROVED | JGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/07/2019 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NEED TO HAVE STAMPED APPROVED PLANS ON SITE FOR ALL INSPECTIONS | |||
| ELECTRIC TEMP POLE | 01/31/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 3:45 |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/26/2019 | 04/29/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 04/05/2019 | 04/12/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 03/12/2019 | 03/13/2019 |
| Note: Released By: RLEE Foundation S | |||
| BLD | COMPLETE | 01/09/2019 | 01/15/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 01/09/2019 | 01/15/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 01/09/2019 | 01/09/2019 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 01/09/2019 | 01/15/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 01/09/2019 | 01/15/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 01/09/2019 | 01/15/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 01/09/2019 | 01/14/2019 |
| Note: Released By: LFITZGERALD PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap | |||
| ZON | COMPLETE | 01/09/2019 | 01/09/2019 |
| Note: Released By: AMOBLEY | |||
| SWALE | COMPLETE | 01/09/2019 | 01/24/2019 |
| Note: Released By: TBAKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/05/2019 |
| REINSPECTION FEE | ¤40.00 | 04/16/2019 |
| REINSPECTION FEE | ¤40.00 | 04/16/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤500.00 | 01/15/2019 |
| SITE PLAN 20 | ¤20.00 | 01/15/2019 |
| SURCHARGE FS 533.721 | ¤12.70 | 01/15/2019 |
| SURCHARGE - FS 468.631 | ¤19.05 | 01/15/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/15/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 01/15/2019 |
| ADMIN FEE | ¤20.00 | 01/15/2019 |
| ELECTRIC FEE | ¤210.00 | 01/15/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 01/15/2019 |
| IMPACT FEE FIRE | ¤223.38 | 01/15/2019 |
| IMPACT FEE PARKS | ¤849.24 | 01/15/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/15/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 01/15/2019 |
| MECHANICAL FEE | ¤210.00 | 01/15/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/15/2019 |
| PLAN CHECK FEE | ¤100.00 | 01/15/2019 |
| PLUMBING FEE | ¤210.00 | 01/15/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,725.23 |