Permit #2019010391
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00260-0130 |
| CONDITIONED SPACE: 2282 sqft |
| GARAGE: 546 sqft |
| OPENED PORCH (WITH ROOF) : 118 sqft |
| OPENED PORCH (WITH ROOF) : 315 sqft |
| Total Square Footage: 3261 sqft |
| Block: 00260 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 908-334-6117 |
| Location Address: 72 FRANKFORD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/28/2019 |
| NOC: RECORDED |
| Applicant name: KIM EUGENE ADAMS |
| Owner: BLASZKIEWICZ JACEK |
|
Address 136 WELLSTONE DRIVE PALM COAST, FL 32164 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤125,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
JMD QUALITY CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
300 CANOPY WALK LANE APT 342 ZEPHYRHILLS, FL 33542 |
CGC1526854 (Exp: 08/31/2026) | 908-334-6117 |
Sub Contractors
ANTONIO MANUEL MADALENA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 731089 HOLLY HILL, FL 32117 |
CAC1816500 (Exp: 08/31/2026) | 386-252-1247 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1351 HAZELNUT ST BUNNELL, FL 32110 |
CFC1427527 (Exp: 08/31/2026) | 386-445-2532 | 386-445-5575 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
KIM EUGENE ADAMS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
300 CANOPY WALK LANE APT 342 ZEPHYRHILLS, FL 33542 |
CGC1526854 (Exp: 08/31/2026) | 908-334-6117 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/07/2020 | FINAL APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION need shut off on pot filler GFCI front door and outside kitchen not working GFCIin kitchen | |||
| ROW - STORMWATER FINAL | 04/07/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION ROAD REPAIR NEEDS TO BE HOT NOT COLD PATCH | |||
| BLD - BUILDING FINAL | 03/24/2020 | Disapproved - NO FEE | JDELBONIS |
| Note: need shut off on pot filler GFCI front door and outside kitchen not working GFCIin kitchen | |||
| U -UTILITY RESIDENTIAL FINAL | 03/23/2020 | APPROVED | AHALL |
| ROW - STORMWATER FINAL | 03/23/2020 | Disapproved - NO FEE | RGROSS |
| Note: ROAD REPAIR NEEDS TO BE HOT NOT COLD PATCH | |||
| ROW - FINAL APRON (AFTER POUR) | 03/23/2020 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/20/2020 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 03/20/2020 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 02/07/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. READY FOR PAVERS. | |||
| ELECTRIC - EARLY POWER | 01/21/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 2:55 | |||
| ROW- PAVER RESTRAINTS | 01/15/2020 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 01/15/2020 | PARTIALLY APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. APPROVED FOR CONCRETE APRON AND OVER THE PIPE. PAVER RESTRAINTS ADDED AND APPROVED. | |||
| U - SEWER TIE IN | 10/30/2019 | APPROVED | MWILLIAMS |
| GRAVITY SEWER TEST | 10/30/2019 | APPROVED | MWILLIAMS |
| INSULATION | 10/07/2019 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 09/30/2019 | APPROVED | MWILLIAMS |
| ALL ROUGH | 09/30/2019 | APPROVED | MWILLIAMS |
| ELECTRIC - EARLY POWER | 09/11/2019 | CANCELLED BY APPLICANT | RMARTIN |
| Note: NEEDED TO BE TUG INSPECTION,ADDED IT ITS OK PASSED | |||
| ELECTRIC-TUG | 09/11/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO FPL RELEASED POWER 3:40 | |||
| ROOF VALLEY & METAL | 08/27/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/12/2019 | APPROVED | MWILLIAMS |
| TIE BEAM / LINTEL | 05/31/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 05/28/2019 | Disapproved -FEE REQUIRED | MWILLIAMS |
| Note: No inspection holes. Continuous down rods not in place. Needs corrective work on block joints. | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/18/2019 | APPROVED | RLEE |
| Note: THIS IS A REINSPECTION | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/09/2019 | CANCELLED BY APPLICANT | JMONTARULI |
| Note: Foundation Survey needs to be brought into the office to be reviewed | |||
| MONOLITHIC SLAB | 03/29/2019 | APPROVED | JHINDMAN |
| ROW- PRE-APRON (PRE-POUR) | 03/28/2019 | Disapproved - NO FEE | RGROSS |
| Note: NOT READY FOR A PRE POUR INSPECTION. POSSIBLY MEANT TO CALL FOR A FOUNDATION INSPECTION PRIOR TO POURING. NO FEE. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/22/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 09/24/2019 | 09/25/2019 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 07/22/2019 | 07/24/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | HOLD | 06/27/2019 | 07/08/2019 |
| Note: Held By: JHINDMAN 1. Provide a digitally signed revision plan Digital signatures must comply with Florida Statues Chapter 481 and Florida Administrative Rule 61G1-16.005 for architects or Florida Statutes Chapter 471 and Florida Administrative Rule 61G15-23.003 for Engineers. The following statement must accompany a digital signature “This item has been electronically signed and sealed by (name) On (date) using a Digital Signature”. Certificate Authority services can be purchased through a third party certification authority to include, but not limited to: Entrust, eTrust, GeoTrust ,GlobalSign, IdenTrust , and Verisign. A digitally created image of the seal must be on the plans for printing purposes. | |||
| BLD | HOLD | 05/24/2019 | 06/03/2019 |
| Note: Held By: JHINDMAN 1. the wood 2x12 header spans exceed the allowable span per 6th ed. FBC Table2308.4.1.1(1). | |||
| SW1 | COMPLETE | 04/15/2019 | 04/18/2019 |
| Note: Released By: RLEE corrected foundation | |||
| SW1 | HOLD | 04/08/2019 | 04/15/2019 |
| Note: Held By: JHINDMAN foundation survey does not show the finish floor elevation | |||
| SW1 | COMPLETE | 02/20/2019 | 02/26/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 02/13/2019 | 02/20/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 02/13/2019 | 02/15/2019 |
| Note: Held By: RLEE Left side lot drainage seems to drain onto neighboring lot according to site plan. Drainage to be maintained on property to positive public outfall. | |||
| SW1 | HOLD | 02/04/2019 | 02/04/2019 |
| Note: Held By: JHINDMAN 1. Provide elevations on adjacent lots to show that the proposed grading will not drin onto them per ULDC Tech manual ch5 300. Provide The elevations on all adjacent properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. (5) The elevations at 20 foot intervals along all property lines. (6) The interior elevations at no greater than a 20 foot grid. | |||
| ZON | COMPLETE | 01/28/2019 | 01/28/2019 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 01/28/2019 | 01/28/2019 |
| Note: Released By: TBAKER | |||
| SW1 | HOLD | 01/28/2019 | 02/01/2019 |
| Note: Held By: RLEE 1. Provide elevations on adjacent lots to show that the proposed grading will not drin onto them per ULDC Tech manual ch5 300. Provide The elevations on all adjacent properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. (5) The elevations at 20 foot intervals along all property lines. (6) The interior elevations at no greater than a 20 foot grid. | |||
| BLD | COMPLETE | 01/28/2019 | 02/04/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 01/28/2019 | 02/04/2019 |
| Note: Held By: JHINDMAN 1. Provide smoke/co detectors outside of the master bedroom per 6th ed. FBC R314 and 315. J. Hindman 986-3784. | |||
| SWALE | COMPLETE | 01/28/2019 | 02/13/2019 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 01/11/2019 | 01/17/2019 |
| Note: Held By: JHINDMAN 1. Provide the roof truss layout and design criteria page from the truss company. 6th ed. FBC 107.3.5. | |||
| ELEC | HOLD | 01/11/2019 | 01/17/2019 |
| Note: Held By: JHINDMAN 1. Provide smoke/co detectors outside of bedrooms per 6th ed. FBC R314 and 315. J. Hindman 986-3784. | |||
| ENGIN1 | HOLD | 01/11/2019 | 01/17/2019 |
| Note: Held By: TBAKER COPC does not accept nail and disc as benchmark. See informational item for more info. | |||
| MECH | COMPLETE | 01/11/2019 | 01/17/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 01/11/2019 | 01/17/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 01/11/2019 | 01/17/2019 |
| Note: Held By: JHINDMAN 1. Provide elevations on adjacent lots to show that the proposed grading will not drin onto them per ULDC Tech manual ch5 300. | |||
| UD1 | COMPLETE | 01/11/2019 | 01/14/2019 |
| Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 01/11/2019 | 01/14/2019 |
| Note: Held By: AMOBLEY Floor plan area calculations do not have the total Survey must show all easements |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/29/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤586.00 | 02/28/2019 |
| SITE PLAN 20 | ¤20.00 | 02/28/2019 |
| SURCHARGE FS 533.721 | ¤14.51 | 02/28/2019 |
| SURCHARGE - FS 468.631 | ¤21.76 | 02/28/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/28/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 02/28/2019 |
| ADMIN FEE | ¤20.00 | 02/28/2019 |
| ELECTRIC FEE | ¤235.80 | 02/28/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 02/28/2019 |
| IMPACT FEE FIRE | ¤223.38 | 02/28/2019 |
| IMPACT FEE PARKS | ¤849.24 | 02/28/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/28/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 02/28/2019 |
| MECHANICAL FEE | ¤235.80 | 02/28/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 02/28/2019 |
| PLAN CHECK FEE | ¤117.20 | 02/28/2019 |
| PLUMBING FEE | ¤235.80 | 02/28/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,830.35 |