I want to search for...
Permit #2019010568
Permit Details
Status: CANCEL
| Parcel Id: 07-11-31-7027-00490-0160 |
| Block: 00490 |
| Subdivision: 2128 - SECTION 27-WYNNFIELD |
| Job Phone: 386-227-2646 |
| Location Address: 49 WOODBURY DR |
| Type: DR - DRIVEWAY |
| Issue Date: 02/07/2019 |
| NOC: Unknown |
| Applicant name: JUAN P BARTOLOME HERNANDEZ |
| Owner: TRIANA, ANA IVIS CARDENAS & URBANO CARDENAS ARIAS |
|
Address & HILDA TRIANA JTWROS PALM COAST, FL 32164 |
|
Address 49 WOODBURY DRIVE PALM COAST, FL 32164 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤1,000.00 |
| Job Description: ADD 16' CONCRETE CIRCULAR TO EXISTING DRIVEWAY |
| Type: CN |
Contractor
A TOUCH OF SPAIN INC
| Status | Location Address | Phone |
| INACTIVE |
74 SEVEN WONDERS TRAIL , |
386-227-2646 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 07/23/2019 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: REMOVE THE CONCRETE THAT WAS POURED INTO THE SWALE AREA PAST THE CULVERT FOOTER AND CLEAN THE DIRT AND CONCRETE OUT OF THE CULVERT PIPE | |||
| ROW - FINAL INSPECTION | 07/23/2019 | Disapproved - NO FEE | KHOWELL |
| Note: THIS INSPECTION CAN NOT BE DONE UNTIL THESE ITEMS HAVE BEEN COMPLETED. REMOVE THE CONCRETE THAT WAS POURED INTO THE SWALE AREA PAST THE CULVERT FOOTER AND CLEAN THE DIRT AND CONCRETE OUT OF THE CULVERT PIPE | |||
| U -UTILITY RESIDENTIAL FINAL | 07/23/2019 | FINAL APPROVED | LFITZGERALD |
| ROW- PRE-APRON (PRE-POUR) | 02/21/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 02/20/2019 | Disapproved -FEE REQUIRED | RGROSS |
| Note: CULVERT OUT OF TOLERANCE. MITERED ENDS NOT FORMED CORRECTLY. MUST BE A MINIMUM OF 18 INCHES FROM SIDE OF THE PIPE TO THE TOP OF THE MITER FORM BOARD. | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL INSPECTION | |||
| Note: THIS IS A REINSPECTION |
Review History
| Department | Status | Date In | Date Out |
| UD1 | COMPLETE | 02/07/2019 | 02/08/2019 |
| Note: Released By: MBACON | |||
| ENGIN1 | COMPLETE | 02/07/2019 | 02/07/2019 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 02/07/2019 | 02/07/2019 |
| Note: Released By: AMOBLEY | |||
| SW1 | COMPLETE | 02/07/2019 | 02/08/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 01/17/2019 | 01/24/2019 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 01/17/2019 | 01/18/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 01/17/2019 | 01/18/2019 |
| Note: Released By: MBACON All Concrete, Driveways, Pavers, Pools / Sidewalks ETC. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA clear zone for a hydrant is 3 feet from both sides and 3 feet behind the hydrant. Front of hydrant shall remain completely clear. | |||
| ZON | COMPLETE | 01/17/2019 | 01/17/2019 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/22/2019 |
| ADMIN FEE | ¤20.00 | 02/07/2019 |
| SITE PLAN 20 | ¤20.00 | 02/07/2019 |
| SURCHARGE FS 533.721 | ¤2.00 | 02/07/2019 |
| SURCHARGE - FS 468.631 | ¤2.00 | 02/07/2019 |
| STORM WATER PERMIT FEES | ¤40.00 | 02/07/2019 |
| REINSPECTION FEE | ¤40.00 | |
| Fees | Total Due: ¤40.00 | Total Paid: ¤124.00 |