Permit #2019020206
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00050-0200 |
| CONDITIONED SPACE: 2614 sqft |
| GARAGE: 705 sqft |
| OPENED PORCH (WITH ROOF) : 153 sqft |
| OPENED PORCH (WITH ROOF) : 108 sqft |
| Total Square Footage: 3580 sqft |
| Block: 00050 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 863-420-2100 |
| Location Address: 49 NEW WATER OAK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/25/2019 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤225,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| TUB SET | 09/13/2019 | APPROVED | JGIBSON |
| BLD - BUILDING FINAL | 09/13/2019 | APPROVED | MWILLIAMS |
| ROW - FINAL APRON (AFTER POUR) | 08/29/2019 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 08/29/2019 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 08/28/2019 | APPROVED | KHOWELL |
| U-CROSS CONNECTION | 08/28/2019 | APPROVED | LFITZGERALD |
| FINAL SURVEY (OFFICE USE ONLY) | 08/21/2019 | APPROVED | KHOWELL |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/21/2019 | APPROVED | KHOWELL |
| ELECTRIC - EARLY POWER | 08/15/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 3:45 | |||
| ROW- PRE-APRON (PRE-POUR) | 07/30/2019 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW- PAVER RESTRAINTS | 07/25/2019 | APPROVED | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 07/25/2019 | PARTIALLY APPROVED | KHOWELL |
| Note: SIDEWALK AND APRON POUR PAVER UPPER | |||
| GRAVITY SEWER TEST | 07/17/2019 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 07/17/2019 | APPROVED | JGIBSON |
| INSULATION | 06/11/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 06/10/2019 | APPROVED | MWILLIAMS |
| INSULATION | 06/06/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: the following was requested on 5-31-19 with no remidy.... (SECOND REQUEST) 1. nail paltes low voltage throughout 2. protection of wire out of wall in garage 3. fireblocking throughout 4. nail plates plumbing master bath 5. missing support in master for fceiling fan ALSO... ADD TUB WHEN GARDEN TUB IS SET | |||
| ALL ROUGH | 05/31/2019 | APPROVED - AS NOTED | WMILLER |
| Note: NEED THE FOLLOWING BY INSULATION 1. nail paltes low voltage throughout 2. protection of wire out of wall in garage 3. fireblocking throughout 4. nail plates plumbing master bath 5. missing support in master for fceiling fan ALSO... ADD TUB WHEN GARDEN TUB IS SET | |||
| ALL ROUGH | 05/29/2019 | CANCELLED BY APPLICANT | WEB |
| ROOF VALLEY & METAL | 05/24/2019 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/21/2019 | APPROVED - AS NOTED | DROCKWELL |
| Note: THIS IS A REINSPECTIONTruss repair detail provided per last request/Repair complete | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/10/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS IS A REINSPECTION STILL need approved angineering for repairs of two trusses (A13, and A14) SECOND REQUEST | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/06/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS IS A REINSPECTION 1. REMOVE DEBRIS AND MATERIALS FROM JOBSITE, FBC, R, 318.6.3 2. need approved angineering for repairs of two trusses (A13, and A14) | |||
| ROOF VALLEY & METAL | 05/06/2019 | Disapproved - NO FEE | WMILLER |
| Note: REMOVE DEBRIS AND MATERIALS FROM JOBSITE, FBC, R, 318.6.3 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/03/2019 | CANCELLED BY APPLICANT | WMILLER |
| Note: THIS IS A REINSPECTION cancelled per Josh | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/02/2019 | CANCELLED BY APPLICANT | WMILLER |
| Note: THIS IS A REINSPECTION cancelled per Josh | |||
| ROOF SHEATHING | 04/30/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/29/2019 | Disapproved - NO FEE | MWILLIAMS |
| Note: THIS IS A REINSPECTION Call in for roof sheathing only not ready for braces and ties | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/26/2019 | CANCELLED BY APPLICANT | WMILLER |
| Note: cancelled per Josh | |||
| ELECTRIC-TUG | 04/26/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 2:45 | |||
| TIE BEAM / LINTEL | 04/16/2019 | APPROVED - AS NOTED | WMILLER |
| Note: THIS IS A REINSPECTION DEFICIENCIES NOTED BY INSPECTOR DR PRIOR RESOLVED | |||
| TIE BEAM / LINTEL | 04/15/2019 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Missing dowes...see orange paint | |||
| TIE BEAM / LINTEL | 04/12/2019 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 04/03/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 04/02/2019 | APPROVED | MWILLIAMS |
| MONOLITHIC SLAB | 03/29/2019 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: not ready floor outlet not installed | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/26/2019 | APPROVED | JGIBSON |
| FOOTER | 03/08/2019 | APPROVED | MWILLIAMS |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/13/2019 | 05/20/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 03/29/2019 | 04/03/2019 |
| Note: Released By: JHINDMAN Foundation Survey | |||
| ZON | COMPLETE | 02/25/2019 | 02/25/2019 |
| Note: Released By: AMOBLEY | |||
| ZON | HOLD | 02/15/2019 | 02/19/2019 |
| Note: Held By: AMOBLEY Please show concrete sidewalk on survey that will be installed in the right of way connecting to the existing neighbors sidewalk | |||
| ELEC | COMPLETE | 02/15/2019 | 02/22/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 02/06/2019 | 02/13/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 02/06/2019 | 02/13/2019 |
| Note: Held By: JHINDMAN 1. Provide electrical load calculations per 2014 NEC art.220. | |||
| ENGIN1 | COMPLETE | 02/06/2019 | 02/07/2019 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 02/06/2019 | 02/13/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 02/06/2019 | 02/12/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 02/06/2019 | 02/12/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 02/06/2019 | 02/07/2019 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind | |||
| ZON | HOLD | 02/06/2019 | 02/07/2019 |
| Note: Held By: AMOBLEY Please show concrete sidewalk on survey that will be installed in the right of way connecting to the existing neighbors sidewalk |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/10/2019 |
| REINSPECTION FEE | ¤40.00 | 09/10/2019 |
| REINSPECTION FEE | ¤40.00 | 09/10/2019 |
| REINSPECTION FEE | ¤40.00 | 09/10/2019 |
| REINSPECTION FEE | ¤40.00 | 09/10/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤658.00 | 02/25/2019 |
| SITE PLAN 20 | ¤20.00 | 02/25/2019 |
| SURCHARGE FS 533.721 | ¤16.02 | 02/25/2019 |
| SURCHARGE - FS 468.631 | ¤24.03 | 02/25/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/25/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 02/25/2019 |
| ADMIN FEE | ¤20.00 | 02/25/2019 |
| ELECTRIC FEE | ¤257.40 | 02/25/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 02/25/2019 |
| IMPACT FEE FIRE | ¤223.38 | 02/25/2019 |
| IMPACT FEE PARKS | ¤849.24 | 02/25/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/25/2019 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 02/25/2019 |
| MECHANICAL FEE | ¤257.40 | 02/25/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 02/25/2019 |
| PLAN CHECK FEE | ¤131.60 | 02/25/2019 |
| PLUMBING FEE | ¤257.40 | 02/25/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,453.86 |