Status: COED
| Parcel Id: 07-11-31-7015-00020-0960 |
| CONDITIONED SPACE: 1819 sqft |
| GARAGE: 665 sqft |
| OPENED PORCH (WITH ROOF) : 55 sqft |
| OPENED PORCH (WITH ROOF) : 225 sqft |
| SCREEN PORCH (SOLID ROOF) : 890 sqft |
| Total Square Footage: 3654 sqft |
| Block: 00020 |
| Subdivision: 2194 - SECTION 15-COUNTRY CLUB COVE |
| Job Phone: (386) 446-5850 |
| Location Address: 62 COCHISE CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/05/2019 |
| NOC: RECORDED |
| Applicant name: CHARLES DALLAS RINEK |
| Owner: PADDLEFORD GEORGE S III & LORI FOREMAN H&W |
|
Address 10345 EAST PANTERA AVENUE MESA, AZ 85212 |
| Lot: 0960 |
| Contracted Stated Job Value: ¤231,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
CHARLES RINEK CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 352502 Palm Coast, FL 32137 |
CGC046080 (Exp: 08/31/2026) | (386) 446-5850 | (386)445-9992 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
ERIC FRANCO
| Status | Location Address | State License Number | Phone |
| CANCEL |
840 DELTONA BLVD SUITE F-2 SANFORD, FL 32771 |
CCC1327280 (Exp: 08/31/2022) | 386-575-4007 |
CHARLES K DAVIS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3000 E MOODY BLVD BLDG 2 BUNNELL , FL 32110 |
EC13004270 (Exp: 08/31/2026) | 386-931-6614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/27/2020 | FINAL APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION need fall protecion around wall out back | |||
| BLD - BUILDING FINAL | 03/20/2020 | Disapproved - NO FEE | JDELBONIS |
| Note: need fall protecion around wall out back | |||
| ROW - FINAL APRON (AFTER POUR) | 03/19/2020 | APPROVED | RGROSS |
| ROW - DRAINAGE | 03/19/2020 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 03/19/2020 | APPROVED - AS NOTED | RGROSS |
| Note: ON SITE WITH SUB CONTRACTOR IN THE PROCESS OF BUILDING A BURME ALONG THE RIGHT SIDE PROPERTY LINE TO PREVENT STORM WATER FROM FLOWING ONTO THE ADJACENT LOT. ALSO PLACING SOD ACROSS THE STREET IN THE ROW WHERE CONTRACOTR TRUCKS WERE PARKING. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/19/2020 | APPROVED | AHALL |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/17/2020 | APPROVED - AS NOTED | RGROSS |
| Note: DRAINAGE ALONG THE LEFT SIDE PROPERTY LINE WILL NEED SWALED TO AVOID STORMWATER FLOWING ONTO THE ADJACENT PROPERTY BEFORE THE FINAL STORMWATER CAN BE APPROVED. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/17/2020 | CANCELLED BY APPLICANT | RGROSS |
| Note: Note: This inspection was accidently cancelled by the inspector. Sent to permit technician to have it rescheduled the same day. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 03/17/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 02/20/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION APPROVED FOR BRICK PAVERS MATERIAL MUST BE COMPACTED | |||
| ROW- PAVER RESTRAINTS | 02/14/2020 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 02/14/2020 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR CONCRETE OVER CULVERT, APRON AND PAVER RESTRAINTS. | |||
| FOOTER | 02/11/2020 | APPROVED | JDELBONIS |
| RETAINING WALL | 01/27/2020 | APPROVED | JDELBONIS |
| RETAINING WALL FOUNDATION | 01/13/2020 | APPROVED | JDELBONIS |
| U - SEWER TIE IN | 12/05/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 12/05/2019 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 09/30/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 3:30 | |||
| LATH/BRICK/ WATER BARRIER | 08/19/2019 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 08/19/2019 | APPROVED | MWILLIAMS |
| INSULATION | 08/08/2019 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 08/01/2019 | Disapproved - NO FEE | WMILLER |
| Note: STILL MISSING ENTRY DOOR FROM GARAGE INTO HOME (REQUESTED AT ALL-ROUGH ENERGY CALCS CALL FOR R-20 INSULATION AT ROOF DECK... R-38 BATTS WERE INSTALLED AT CEILING... NEED REVISION | |||
| ALL ROUGH | 07/24/2019 | APPROVED - AS NOTED | WMILLER |
| Note: NEED THE FOLLOWING BY INSULATION... 1. NEED ENTRY DOORS INSTALLED 2. TIGHTEN GROUND LUG ON METAL BOX AT LOW VOLTAGE CONSOLE ALL METAL BOXES SHALL BE GROUNDED R,E 3905.2 AND NEC.314.4 3. NAIL PLATES FBC… R, M1308.2 PROTECTION FROM PHYSICAL DAMAGE… IF PIPE IS LESS THAN 1.5” FROM EDGE IT MUST BE PROTECTED WITH A MINIMUM OF 16 GAGE STEEL PLATE AND PLATE MUST EXTEND A MINIMUM OF 2” ABOVE THE SOLE PLATES AND BELOW THE TOP PLATES (LIQUID LI)NES AT BOTTOM PLATE IN GARAGE 4. NEED TO BOX OUT AROUND DRYER EXHAUST (OUT OF WALL) 5. 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1) 6. MISSING FASTENERS AT SLIDER TRACK AND WINDOWS (CHECK ALL) 7. CHECK INSULATION ON HOT SUPPLY IN ATTIC SPACE (SOME IS FALLING OFF) | |||
| ROOF VALLEY & METAL | 07/17/2019 | APPROVED | WMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/04/2019 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/03/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS IS A REINSPECTION 1. MISSING FASTENERS AT HTU26 BUCKETS 2. UNDER DRIVEN FASTENERS AT HTU26 BUCKETS 3. MISSING HETA20 STRAPPS PER PLAN 4. CONTINUOUS LOAD PATH… R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH (ROOF SHEATHING PASSED) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/29/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. MISSING HTU 26 BUCKETS PER PLAN 2. MISSING FASTENERS AT HTU26 BUCKETS 3. UNDER DRIVEN FASTENERS AT HTU26 BUCKETS 4. MISSING HETA20 STRAPPS PER PLAN 5. CONTINUOUS LOAD PATH… R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH 6. 6X6 POSTS NOT SET PER PLANS AT DETAIL -A 7. 6X6 POST HARDWARE/STRAPS MISSING PER PLANS AT DETAIL -A | |||
| TIE BEAM / LINTEL | 05/02/2019 | APPROVED | WMILLER |
| Note: THIS WAS APPROVED PRIOR ON 4-26-2017 BY INSPECTOR LM | |||
| ELECTRIC-TUG | 05/02/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 3:00 | |||
| TIE BEAM / LINTEL | 04/26/2019 | APPROVED | WMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 04/25/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 04/03/2019 | APPROVED | WMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/29/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 03/16/2020 | 03/16/2020 |
| Note: Released By: JMYERS Elevation certificates are not required. | |||
| ENGIN1 | COMPLETE | 02/10/2020 | 02/11/2020 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 02/10/2020 | 02/13/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 02/10/2020 | 02/10/2020 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 02/10/2020 | 02/11/2020 |
| Note: Released By: AMOBLEY | |||
| ZON | COMPLETE | 02/04/2020 | 02/04/2020 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 02/04/2020 | 02/10/2020 |
| Note: Released By: PBUCKLEY | |||
| ZON | COMPLETE | 02/04/2020 | 02/05/2020 |
| Note: Released By: ELENS Please check to verify if any changes were made that may affect zoning regs. | |||
| ZON | COMPLETE | 12/06/2019 | 12/09/2019 |
| Note: Released By: ELENS | |||
| BLD | COMPLETE | 11/11/2019 | 11/18/2019 |
| Note: Released By: PBUCKLEY | |||
| ZON | HOLD | 11/11/2019 | 11/12/2019 |
| Note: Held By: TDOAK Provide dimensions of all proposed walkways not on original approved site plan. Note that walkways cannot exceed 6' wide. Provide material to be used for all proposed walkways not on original approved site plan. Demonstrate that proposed walkway on left side of home does not encroach into 5' utility easement by providing setback. Provide the setback of the proposed paver patio which is rearmost of the property to the rear property line to demonstrate that it does not encroach into the setback. Plans for the retaining wall must state that the wall will be finished to match the home. | |||
| SW1 | COMPLETE | 11/11/2019 | 11/12/2019 |
| Note: Released By: CTROHA | |||
| ZON | COMPLETE | 10/02/2019 | 10/02/2019 |
| Note: Released By: AMOBLEY | |||
| MECH | COMPLETE | 08/02/2019 | 08/07/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 07/16/2019 | 07/19/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 04/24/2019 | 04/25/2019 |
| Note: Released By: JHINDMAN Foundation S | |||
| BLD | COMPLETE | 03/29/2019 | 04/05/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 02/22/2019 | 02/25/2019 |
| Note: Released By: AMOBLEY | |||
| PLFM | COMPLETE | 02/22/2019 | 02/22/2019 |
| Note: Released By: JMYERS Based on the Site Plan submitted 2/22/19 the structure is outside of the Special Flood Hazard Area. No elevation certificates will be required. | |||
| ENGIN1 | COMPLETE | 02/22/2019 | 02/25/2019 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 02/22/2019 | 03/01/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 02/22/2019 | 03/01/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 02/22/2019 | 03/01/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | HOLD | 02/13/2019 | 02/13/2019 |
| Note: Held By: TBAKER Elevations on survey differ from COPC GPS by .4' | |||
| PLFM | HOLD | 02/08/2019 | 02/08/2019 |
| Note: Held By: JMYERS According to City of Palm Coast mapping resources, the subject property has an “AE” zone which is a Special Flood Hazard Area (SFHA) located on it. Please provide an updated Site Plan that shows the extent of the Flood Zone. Should the structure fall inside the Flood Zone, elevation certificates will be required at Construction Drawings, Foundation, and Final. | |||
| SWALE | COMPLETE | 02/08/2019 | 02/28/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 02/07/2019 | 02/14/2019 |
| Note: Released By: RLEE | |||
| ELEC | HOLD | 02/07/2019 | 02/14/2019 |
| Note: Held By: JHINDMAN 1. Provide electrical load calculations per 2014 NEc art.220.2. Provide a service riser with conductors sized for a 300 amp service. 2014 NEC Table 310 15B16. | |||
| ENGIN1 | COMPLETE | 02/07/2019 | 02/08/2019 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 02/07/2019 | 02/14/2019 |
| Note: Released By: RLEE | |||
| PLUM | HOLD | 02/07/2019 | 02/14/2019 |
| Note: Held By: JHINDMAN 1. Provide a plumbing riser diagram signed and sealed or signed by the plumbing contractor with theitr signature | |||
| SW1 | HOLD | 02/07/2019 | 02/14/2019 |
| Note: Held By: RLEE Proposed drainage at side lots seems to drain onto adjacent properties. Positive outfall to be maintained on property. | |||
| UD1 | COMPLETE | 02/07/2019 | 02/08/2019 |
| Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 02/07/2019 | 02/08/2019 |
| Note: Held By: AMOBLEY 1. Elevations labeled incorrectly on page A6 2. Garages can not exceed the maximum depth of 30' 3. Please remove all the accessory work at the rear of property on Survey/Site plan as this permit is for the house only 4. Survey/Site plan should have total lot square footage 5. Survey/Site plan has the incorrect section in the description 6. Please show total driveway and walkway width on the Survey/Site plan | |||
| ZON | HOLD | 02/03/2019 | 02/04/2020 |
| Note: Held By: ELENS Please provide original Right of Way Utilization Agreement for recording. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 02/10/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 02/10/2020 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 02/10/2020 |
| REINSPECTION FEE | ¤40.00 | 02/10/2020 |
| REINSPECTION FEE | ¤40.00 | 02/10/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤482.00 | 03/05/2019 |
| SITE PLAN 20 | ¤20.00 | 03/05/2019 |
| SURCHARGE FS 533.721 | ¤12.32 | 03/05/2019 |
| SURCHARGE - FS 468.631 | ¤18.48 | 03/05/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/05/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 03/05/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 03/05/2019 |
| MECHANICAL FEE | ¤204.60 | 03/05/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 03/05/2019 |
| PLAN CHECK FEE | ¤96.40 | 03/05/2019 |
| PLUMBING FEE | ¤204.60 | 03/05/2019 |
| ELECTRIC FEE | ¤204.60 | 03/05/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 03/05/2019 |
| IMPACT FEE FIRE | ¤223.38 | 03/05/2019 |
| IMPACT FEE PARKS | ¤849.24 | 03/05/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/05/2019 |
| ADMIN FEE | ¤20.00 | 03/05/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,770.48 |