I want to search for...
Permit #2019020339
Permit Details
Status: COED
| Parcel Id: 16-11-31-1260-00000-0530 |
| CONDITIONED SPACE: 2689 sqft |
| OPENED PORCH (WITH ROOF) : 72 sqft |
| OPENED PORCH (WITH ROOF) : 388 sqft |
| GARAGE: 1086 sqft |
| Total Square Footage: 4235 sqft |
| Block: 00000 |
| Subdivision: 2081 - Creekside Village at Grand Haven |
| Job Phone: (386)445-2012 |
| Location Address: 4 MIDDEN LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/19/2019 |
| NOC: RECORDED |
| Applicant name: JOHN DONALD GORDON |
| Owner: NITOPI DANIEL & CAROL H&W |
|
Address 254 TERRACE AVENUE HASBROUCK HEIGHT, NJ 07604 |
| Lot: 0530 |
| Contracted Stated Job Value: ¤438,600.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. Box 354786 Palm Coast, FL 32137 |
CGC062646 (Exp: 08/31/2020) | (386)445-2012 | (386)446-7928 |
Sub Contractors
JOSEPH JOHN VERRECHIO
| Status | Location Address | State License Number | Phone |
| CANCEL |
1325 WEST STATE RD. 100 BUNNELL, FL 32110 |
EC13004254 (Exp: 08/31/2024) | 386-447-9644 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/14/2020 | FINAL APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 01/13/2020 | Disapproved - NO FEE | JDELBONIS |
| Note: GFCI in both garages landry room and wall behind kitchen sink | |||
| ROW - FINAL APRON (AFTER POUR) | 01/10/2020 | APPROVED | RGROSS |
| ROW - STORMWATER FINAL | 01/10/2020 | APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 01/10/2020 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/08/2020 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 01/08/2020 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 12/20/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. READY TO POUR | |||
| ROW- PAVER RESTRAINTS | 11/07/2019 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 10/25/2019 | PARTIALLY APPROVED | MMAJEWSKI |
| Note: PAVER DRIVEWAY. 2ND PART OF PRE POUR NEEDED BEFORE PAVERS PLACED. | |||
| U - SEWER TIE IN | 10/16/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 10/16/2019 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 08/27/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 3:00 | |||
| ELECTRIC - EARLY POWER | 08/26/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: HOUSE IS LOCKED, NEED ACCESS FOR INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 06/25/2019 | APPROVED | MWILLIAMS |
| INSULATION | 06/20/2019 | APPROVED | MWILLIAMS |
| ALL ROUGH | 06/14/2019 | APPROVED | MWILLIAMS |
| ROOF VALLEY & METAL | 05/24/2019 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 05/23/2019 | CANCELLED BY APPLICANT | WMILLER |
| Note: THIS IS A REINSPECTION cancelled per jc | |||
| ROOF VALLEY & METAL | 05/22/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: FASTENERS FOR UNDERLAYMENT AS REQUIRED, R905.1.1, AND TABLE 905.1.1 (1 -3) AND R905.1.1 EXEPTION, (SYNTHETIC UNDERLAMENT) (FASTENED WITH TWO STAGGERED ROWS IN THE FIELD WITH A MAXIMUM FASTENER SPACING OF 12 inches, AND ONE ROW AT THE OVERLAPS FASTENED 6 inches OC, LAPS OFFSET BY 6 feet, AND WITH THE MANUFACTURER SPECS) | |||
| ELECTRIC-TUG | 05/20/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 3:45 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/10/2019 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| WINDOW NAILING | 05/10/2019 | APPROVED - AS NOTED | WMILLER |
| Note: THIS WAS FOR SLIDER TRACK ONLY | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/08/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. WOOD BEARING WALL DETAIL CALLS FOR KING STUD, JACK, AND HEADER PER HEADER SCHEDULE (NO HEADER SCHEDULE IN DOCS, NEED HEADER SCHEDULE PER PLANS) 2. MISSING STRAPS AT WOOD BEARING WALLS PER DETAIL 3. UNCOVER ALL CONNECTIONS HIDDEN BY SIDING | |||
| TIE BEAM / LINTEL | 04/23/2019 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 04/22/2019 | Disapproved - NO FEE | WMILLER |
| Note: soil and or debris in cells (marked on plans | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/18/2019 | APPROVED | RLEE |
| MONOLITHIC SLAB | 04/02/2019 | APPROVED | MWILLIAMS |
| MONOLITHIC SLAB | 03/27/2019 | Disapproved - NO FEE | MWILLIAMS |
| Note: Discussed with JC Still needs proper footer depth to achieve 12" below grade as noted in prior inspection. | |||
| MONOLITHIC SLAB | 03/26/2019 | Disapproved -FEE REQUIRED | MWILLIAMS |
| Note: Improper footer depth per plan and code. Must have a minimum of 12" of footer below compacted grade. 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE… R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE (NEED ADDITIONAL COMPACTION REPORT FOR AREAS OUTSIDE OF FOOTINGS AFTER ADDING REQUIRED MINIMUM DEPTH) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/25/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/16/2019 | 04/18/2019 |
| Note: Released By: RLEE foundation | |||
| BLD | COMPLETE | 02/11/2019 | 02/15/2019 |
| Note: Released By: RLEE | |||
| ELEC | COMPLETE | 02/11/2019 | 02/15/2019 |
| Note: Released By: RLEE | |||
| ENGIN1 | COMPLETE | 02/11/2019 | 02/11/2019 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 02/11/2019 | 02/15/2019 |
| Note: Released By: RLEE | |||
| PLUM | COMPLETE | 02/11/2019 | 02/15/2019 |
| Note: Released By: RLEE | |||
| SW1 | COMPLETE | 02/11/2019 | 02/15/2019 |
| Note: Released By: RLEE | |||
| UD1 | COMPLETE | 02/11/2019 | 02/18/2019 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind | |||
| ZON | COMPLETE | 02/11/2019 | 02/11/2019 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/14/2020 |
| REINSPECTION FEE | ¤40.00 | 01/14/2020 |
| REINSPECTION FEE | ¤40.00 | 01/14/2020 |
| REINSPECTION FEE | ¤40.00 | 01/14/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤878.00 | 02/19/2019 |
| SITE PLAN 20 | ¤20.00 | 02/19/2019 |
| SURCHARGE FS 533.721 | ¤20.64 | 02/19/2019 |
| SURCHARGE - FS 468.631 | ¤30.96 | 02/19/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/19/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 02/19/2019 |
| ADMIN FEE | ¤20.00 | 02/19/2019 |
| ELECTRIC FEE | ¤323.40 | 02/19/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 02/19/2019 |
| IMPACT FEE FIRE | ¤223.38 | 02/19/2019 |
| IMPACT FEE PARKS | ¤849.24 | 02/19/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/19/2019 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 02/19/2019 |
| MECHANICAL FEE | ¤323.40 | 02/19/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 02/19/2019 |
| PLAN CHECK FEE | ¤175.60 | 02/19/2019 |
| PLUMBING FEE | ¤323.40 | 02/19/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,887.41 |