I want to search for...

Permit #2019020835

Permit Details

Status: COED

Parcel Id: 07-11-31-7035-00670-0120
CONDITIONED SPACE: 2919 sqft
GARAGE: 716 sqft
OPENED PORCH (WITH ROOF) : 57 sqft
OPENED PORCH (WITH ROOF) : 250 sqft
Total Square Footage: 3942 sqft
Block: 00670
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: 386-627-8993
Location Address: 34 BURBANK DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/02/2019
NOC: RECORDED
Applicant name: WILLIAM PIERCE STOUGHTON
Owner: RICE ANDREW EVERETT

Address

31 BARKWOOD LANE

PALM COAST, FL 32137

Lot: 0120
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

STOUGHTON & DURAN CUSTOM HOMES LLC
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1478

BUNNELL, FL 32110

CGC047560 (Exp: 08/31/2026) 386-627-8993 866-576-9888

Sub Contractors

PETER JOSEPH LYDEN
Status Location Address State License Number Phone
CANCEL

17 UNIMAY CT

BUNNELL, FL 32110

EC0002436 (Exp: 08/31/2022) 386-931-2568
RICHARD LEE VONBROCKEN
Status Location Address State License Number Phone Fax
INACTIVE

1738 STATE AVE

HOLLY HILL, FL 32117

CAC035516 (Exp: 08/31/2026) (386)672-1950 (386)672-1952
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
BRIAN CHRISTOPHER MULLEN
Status Location Address State License Number Phone
INACTIVE

PO BOX 351158

PALM COAST, FL 0

CCC1330417 (Exp: 08/31/2026) 386-385-8504

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/03/2020 FINAL APPROVED MMESSER
Note: THIS IS A REINSPECTION ADDRESS NUMBERS, SITE ADDRESS NUMBERS FBC R319.1 4 INCH MINIMUM WITH .5 INCH STROKE WIDTH WINDOW SILLS IN 2 FRONT BEDROOMS MISSING. PROOF OF TERMITE INSPECTION NEEDS TO BE POSTED ON ELECTRICAL PANEL. INSULATION CALCULATION MISSING. INSPECTION STOPPED!
BLD - BUILDING FINAL 11/30/2020 Disapproved -FEE REQUIRED FWILLIS
Note: ADDRESS NUMBERS, SITE ADDRESS NUMBERS FBC R319.1 4 INCH MINIMUM WITH .5 INCH STROKE WIDTH WINDOW SILLS IN 2 FRONT BEDROOMS MISSING. PROOF OF TERMITE INSPECTION NEEDS TO BE POSTED ON ELECTRICAL PANEL. INSULATION CALCULATION MISSING. INSPECTION STOPPED!
BLD - BUILDING FINAL 11/19/2020 CANCELLED BY APPLICANT WEB
U -UTILITY RESIDENTIAL FINAL 11/16/2020 FINAL APPROVED DHANEY
Note: THIS IS A REINSPECTION
ROW - STORMWATER FINAL 11/12/2020 APPROVED RGROSS
U -UTILITY RESIDENTIAL FINAL 11/12/2020 CANCELLED BY APPLICANT JHARDING
ROW - FINAL APRON (AFTER POUR) 11/12/2020 APPROVED RGROSS
ELECTRIC - EARLY POWER 11/12/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 9:00
FINAL SURVEY (OFFICE USE ONLY) 09/14/2020 APPROVED RGROSS
ROW FIELD SURVEY /GRADING CERTIFICATION 09/14/2020 APPROVED RGROSS
ALL ROUGH 08/04/2020 APPROVED JCOLASANTI
Note: Schedule rough inspection for studio.
FRAMING 06/25/2020 APPROVED JCOLASANTI
INSULATION 05/27/2020 APPROVED JCOLASANTI
Note: insulation for sound room
U - SEWER TIE IN 05/22/2020 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 05/22/2020 APPROVED RGROSS
Note: READY FOR PAVERS
GRAVITY SEWER TEST 05/22/2020 APPROVED JGIBSON
PROJECT STATUS (OFFICE USE) 05/21/2020 APPROVED JCOLASANTI
Note: will need insulation, framing and all rough inspection for sond room
ROW- PAVER RESTRAINTS 05/13/2020 APPROVED RGROSS
ROW- PRE-APRON (PRE-POUR) 05/13/2020 PARTIALLY APPROVED RGROSS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION ADDED ON 3/19/2020 3:35:24 PM NOT FORMED CORRECTLY IN THE ROW. SEE CITY WEB SITE SEARCH "RESIDENTIAL CULVERT DETAIL" PDF FOR CITY CODE FOR DRIVEWAY CULVERTS. APPROVED FOR THE APRON AND PAVER RESTRAINTS ONLY. UPPER PAVER DRIVEWAY BASE STILL NEEDS CHECKED ON THE 2ND PART OF THE PRE POUR. ON SITE WITH SUPER.
ROW- PRE-APRON (PRE-POUR) 03/23/2020 Disapproved - NO FEE RGROSS
Note: THIS IS A REINSPECTION ADDED ON 3/19/2020 3:35:24 PM NOT FORMED CORRECTLY IN THE ROW. SEE CITY WEB SITE SEARCH "RESIDENTIAL CULVERT DETAIL" PDF FOR CITY CODE FOR DRIVEWAY CULVERTS. PHOTO'S ATTACHED.
ROW- PRE-APRON (PRE-POUR) 03/20/2020 CANCELLED BY APPLICANT JMONTARULI
ROW- PROJECT STATUS 03/12/2020 Disapproved - NO FEE CTROHA
Note: A resident reported the builder had removed vegetation and trees from city property along the canal at this location. After and inspection of the property I found evidence of the removal and sent this to code enforcement.
PEP TANK INSTALLATION REQUEST 03/09/2020 APPROVED CSTONE
ELECTRIC-TUG 01/22/2020 APPROVED - AS NOTED RMARTIN
Note: NEED REVISION IF NOT ON PLAN OF SUB PANEL IN GARAGE BY FINAL, NEED APPROVED PLANS ON SITE FOR INSPECTIONS, EMAILED FPL RELEASED TUG 1:50
INSULATION 12/16/2019 APPROVED JDELBONIS
ALL ROUGH 12/09/2019 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
ALL ROUGH 10/25/2019 Disapproved -FEE REQUIRED WMILLER
Note: THIS IS A REINSPECTION 1. need revision for changes in electric thoughout (not as proposed) 2. need revision for ductwork (not as proposed) 3. 5ft HEAD OF WATER, 6TH EDITION FBC CHAPTER 25 SECTION P2503.5.1 (1) 4. NAIL PLATES ON ELECTRIC FBC E3802.1 (table), AND 3802.3.2 OR NEC 334.15 b. (RESPECTIVELY) protection from physical damage. (top of panel and at bottom plate in kitchen pantry) 5. double walls not installed at studio 6. electric out of wall at kitchen pantry bottom plate 6. exhaust ducts within 3 feet of windows 7. Need to complete work and obtain revision for studio
ALL ROUGH 09/30/2019 Disapproved - NO FEE JCOLASANTI
Note: need revision for sub panel in garage.....need to attach duct to ceiling and run electrical per plan in sound room
LATH/BRICK/ WATER BARRIER 09/30/2019 APPROVED JCOLASANTI
ROOF VALLEY & METAL 08/01/2019 APPROVED - AS NOTED JCOLASANTI
Note: need revision for garage door into sound room by all rough inspection
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/26/2019 APPROVED - AS NOTED JCOLASANTI
Note: THIS IS A REINSPECTION need to nail and add straps front entrance area check at all rough Elizabeth called to schedule this inspection
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/24/2019 CANCELLED BY APPLICANT JDELBONIS
TIE BEAM / LINTEL 06/12/2019 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 06/12/2019 APPROVED STHOMAS
MONOLITHIC SLAB 05/15/2019 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION per contractor
MONOLITHIC SLAB 05/13/2019 CANCELLED BY APPLICANT WMILLER
Note: per contractor cancelled per contractor due to weather
PLUMBING 1ST ROUGH UNDERGROUND 05/07/2019 APPROVED JGIBSON

Review History

Department Status Date In Date Out
ZON COMPLETE 04/30/2020 04/30/2020
Note: Released By: ELENS
ZON HOLD 04/13/2020 04/14/2020
Note: Held By: ELENS Revised landscape plan does not contain a legend showing the types and sizes of plantings. The proposed plan does not show required number and placement of foundation plantings, and trees.
MECH COMPLETE 12/02/2019 12/03/2019
Note: Released By: CPISCITELLI
ELEC COMPLETE 12/02/2019 12/02/2019
Note: Released By: JMUNSON
MECH COMPLETE 09/19/2019 09/26/2019
Note: Released By: MGARRETT
BLD COMPLETE 09/13/2019 09/20/2019
Note: Released By: MGARRETT
MECH HOLD 07/08/2019 07/09/2019
Note: Held By: JHINDMAN 1. Revised energy calculations are not signed by the contractor on page 1 and the EPL card.
SW1 COMPLETE 06/11/2019 06/11/2019
Note: Released By: JMUNSON
SW1 HOLD 05/06/2019 05/07/2019
Note: Held By: JHINDMAN foundation survey is for wrong address
ZON COMPLETE 03/26/2019 03/27/2019
Note: Released By: AMOBLEY
UD1 COMPLETE 03/26/2019 03/29/2019
Note: Released By: AHALL PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap
MECH COMPLETE 03/26/2019 04/01/2019
Note: Released By: JHINDMAN
PLUM COMPLETE 03/26/2019 04/01/2019
Note: Released By: JHINDMAN
ELEC COMPLETE 03/26/2019 04/01/2019
Note: Released By: JHINDMAN
SWALE COMPLETE 02/25/2019 03/01/2019
Note: Released By: TBAKER
BLD COMPLETE 02/25/2019 03/04/2019
Note: Released By: JHINDMAN
ELEC HOLD 02/25/2019 03/04/2019
Note: Held By: JHINDMAN 1. Provide electrical load calculations signed by the electrical contractor with their license number 2014 necart.220.
ENGIN1 COMPLETE 02/25/2019 02/25/2019
Note: Released By: TBAKER
MECH HOLD 02/25/2019 03/04/2019
Note: Held By: JHINDMAN 1. Provide contractors signature on energy calculation page r405 and epl card.
PLUM HOLD 02/25/2019 03/04/2019
Note: Held By: JHINDMAN 1. Provide a signed and sealed plumbing riser diagram or a riser signed by the plumbing contractor with their license number 6th ed. FBC 107.
SW1 COMPLETE 02/25/2019 03/04/2019
Note: Released By: JHINDMAN
UD1 HOLD 02/25/2019 02/26/2019
Note: Held By: LFITZGERALD PEP Panel not shown on electrical plans (Builder Electrical Plan PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan
ZON HOLD 02/25/2019 02/25/2019
Note: Held By: AMOBLEY Please provide name of the sherwin williams body color with the LRV Please specify the gallon size of all shrubs on landscape plan (Shrubs around AC Pad must be 7 gallon)

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/11/2020
REINSPECTION FEE ¤40.00 12/11/2020
NEW RESIDENTIAL INSPECTIONS ¤730.00 04/02/2019
SITE PLAN 20 ¤20.00 04/02/2019
SURCHARGE FS 533.721 ¤17.53 04/02/2019
SURCHARGE - FS 468.631 ¤26.30 04/02/2019
STORM WATER PERMIT FEES ¤80.00 04/02/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 04/02/2019
ADMIN FEE ¤20.00 04/02/2019
ELECTRIC FEE ¤279.00 04/02/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 04/02/2019
IMPACT FEE FIRE ¤223.38 04/02/2019
IMPACT FEE PARKS ¤849.24 04/02/2019
IMPACT FEE SCHOOL ¤3,600.00 04/02/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 04/02/2019
MECHANICAL FEE ¤279.00 04/02/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 04/02/2019
PLAN CHECK FEE ¤146.00 04/02/2019
PLUMBING FEE ¤279.00 04/02/2019
Fees Total Due: ¤0.00 Total Paid: ¤8,180.31