I want to search for...

Permit #2019030184

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7063-00620-0100
Block: 00620
Subdivision: -
Job Phone: 386-852-7663
Location Address: 44 ZEPHYR LILY TR
Type: DR - DRIVEWAY
Issue Date: 03/27/2019
NOC: Unknown
Applicant name: CHAD OREN LORD
Owner: RASSANO LYNNE L & MARK L RASSANO JTWROS

Address

44 ZEPHR LILY TRAIL

PALM COAST, FL 32164

Lot: 0100
Contracted Stated Job Value: ¤2,500.00
Job Description: WIDENING DRIVEWAY, REF#2017080428, REF#2018050974
Type: CN

Contractor

LORD'S ROOFING
Status Location Address State License Number Phone Fax
HOLD

133 CIMMARON DR

PALM COAST, FL 32137

CGC1514583 (Exp: 08/30/2020) 386-852-7663 866-525-7673

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 04/05/2019 FINAL APPROVED KHOWELL
ROW - FINAL APRON (AFTER POUR) 04/03/2019 APPROVED - AS NOTED KHOWELL
Note: THIS IS A REINSPECTION SOD NEEDS TO BE PALCED AT THE CULVERT ENDS PRIOR TO CALLING IN FINAL R.O.W. INSPECTION
U -UTILITY RESIDENTIAL FINAL 04/03/2019 FINAL APPROVED AHALL
ROW - FINAL APRON (AFTER POUR) 03/28/2019 Disapproved - NO FEE KHOWELL
Note: CLEAN THE CONCRETE AND DIRT OUT OF THE CULVERT PIPE
U -UTILITY RESIDENTIAL FINAL 03/28/2019 FINAL APPROVED AHALL

Review History

Department Status Date In Date Out
ZON COMPLETE 03/19/2019 03/19/2019
Note: Released By: AMOBLEY
URB COMPLETE 03/06/2019 03/07/2019
Note: Released By: JBEAUDET
ENGIN1 COMPLETE 03/05/2019 03/07/2019
Note: Released By: TBAKER
SW1 COMPLETE 03/05/2019 03/06/2019
Note: Released By: JHINDMAN
UD1 COMPLETE 03/05/2019 03/11/2019
Note: Released By: AHALL All Concrete, Driveways, Pavers, Pools / Sidewalks ETC. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind.
ZON HOLD 03/05/2019 03/06/2019
Note: Held By: TDOAK Scope of work unclear. Site plan submitted does not demonstrate the existing vs the proposed widening of the driveway. The maximum width of a driveway with an one car garage is 20'. Also, if driveway is being widened to front entry concrete pad, you must demonstrate there is a minimum of 8 foundation plantings in the front of the home and a separation between the front porch and the driveway with sod/foundation plantings. Google Earth shows that there is a specimen tree in the area where the driveway is shown. Urban forestry department will be added as reviewer on this permit.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN FEE ¤20.00 03/27/2019
CONTRACTOR CHANGE ¤40.00 03/27/2019
SURCHARGE FS 533.721 ¤2.00 03/27/2019
SURCHARGE - FS 468.631 ¤2.00 03/27/2019
STORM WATER PERMIT FEES ¤40.00 03/27/2019
Fees Total Due: ¤0.00 Total Paid: ¤104.00