Permit #2019030252
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00420-0020 |
| CONDITIONED SPACE: 1912 sqft |
| GARAGE: 461 sqft |
| OPENED PORCH (WITH ROOF) : 292 sqft |
| OPENED PORCH (WITH ROOF) : 78 sqft |
| Total Square Footage: 2743 sqft |
| Block: 00420 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-447-4151 |
| Location Address: 15 EASTWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/03/2019 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: MASEFIELD DEVELOPMENT LLC |
|
Address 50 LEANNI WAY PALM COAST, FL 32137 |
|
Address SUITE C1 PALM COAST, FL 32137 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
GREGG A MCANALLY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE PALM COAST, FL 32092 |
CAC1815760 (Exp: 08/31/2022) | 904-829-8898 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/21/2020 | FINAL APPROVED | FWILLIS |
| ROW - FINAL APRON (AFTER POUR) | 12/17/2019 | APPROVED | MMAJEWSKI |
| ROW - STORMWATER FINAL | 12/17/2019 | APPROVED | MMAJEWSKI |
| U -UTILITY RESIDENTIAL FINAL | 12/17/2019 | APPROVED | AHALL |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/12/2019 | APPROVED | MMAJEWSKI |
| FINAL SURVEY (OFFICE USE ONLY) | 12/12/2019 | APPROVED | MMAJEWSKI |
| ELECTRIC - EARLY POWER | 11/20/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 9:50 | |||
| ELECTRIC - EARLY POWER | 11/19/2019 | Disapproved - NO FEE | RMARTIN |
| Note: WEATHER PROOF OUTLETS OUTSIDE DO NOT HAVE COVERS | |||
| ROW- PRE-APRON (PRE-POUR) | 10/22/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: THIS IS A REINSPECTION CULVERT INVERT IS RIGHT ON ELEVATION. It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/21/2019 | Disapproved - NO FEE | KHOWELL |
| Note: PAD AREA TO WET FOR INSPECTION, THE ROAD FORM BOARD NEEDS TO LINE UP WITH THE EXISTING EDGE OF PAVEMENT. THE SIDEWALK IS FORMED WIDER THEN THE APPROVED SITE PLAN. PAD AREA NEEDS COMPACTED WHERE SPRINKLER LINES WHERE RUN IN PAD AREA. | |||
| U - SEWER TIE IN | 10/07/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 10/07/2019 | APPROVED | JGIBSON |
| PEP TANK INSTALLATION REQUEST | 09/23/2019 | APPROVED | CSTONE |
| Note: Once you request your pep tank we ask that you keep the site clear until the tank is in. You will have 72 hours after pep tank request has been approved to get the site ready. Site ready means area is clear without driveway, sod, paint, sidewalks, or irrigation in the way. If you have underground power where the pep tank will be located you will need to have that moved. | |||
| LATH/BRICK/ WATER BARRIER | 09/13/2019 | APPROVED | FWILLIS |
| INSULATION | 09/12/2019 | APPROVED | FWILLIS |
| ALL ROUGH | 08/29/2019 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 07/19/2019 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/17/2019 | APPROVED | JDELBONIS |
| ROOF SHEATHING | 07/03/2019 | APPROVED | DROCKWELL |
| TIE BEAM / LINTEL | 06/20/2019 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION RFI in the construction box allowing substitute Lintels. | |||
| TIE BEAM / LINTEL | 06/18/2019 | Disapproved - NO FEE | FWILLIS |
| Note: 1. Rebar outside of wall at 2 locations on garage side. Will not have minimum coverage as per plan. 2. Need approval letter from Engineer for substitute header manufacturer. Sheet 7/8, on approved plans, shows Cast Crete as the manufacturer. | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/10/2019 | APPROVED | JMUNSON |
| MONOLITHIC SLAB | 05/16/2019 | APPROVED | MWILLIAMS |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/08/2019 | APPROVED | JGIBSON |
| ELECTRIC TEMP POLE | 04/11/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 3:20 |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 12/03/2019 | 12/03/2019 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 06/19/2019 | 06/26/2019 |
| Note: Released By: RLEE | |||
| SW1 | COMPLETE | 06/10/2019 | 06/10/2019 |
| Note: Released By: JMUNSON Foundation S | |||
| MECH | COMPLETE | 03/28/2019 | 04/03/2019 |
| Note: Released By: JHINDMAN | |||
| MECH | HOLD | 03/21/2019 | 03/27/2019 |
| Note: Held By: JHINDMAN 1. Provide a heating output for the a/c unit the is larger than the heating load per the Energy calculations R405 | |||
| BLD | COMPLETE | 03/07/2019 | 03/14/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 03/07/2019 | 03/14/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 03/07/2019 | 03/07/2019 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 03/07/2019 | 03/14/2019 |
| Note: Held By: JHINDMAN 1. Provide energy calculations that match the square footage of the conditioned space on the plans. | |||
| PLUM | COMPLETE | 03/07/2019 | 03/14/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 03/07/2019 | 03/14/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 03/07/2019 | 03/12/2019 |
| Note: Released By: AHALL PEP Panel not shown on electrical plans (Builder Electrical Plan see page 2.) PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. | |||
| ZON | COMPLETE | 03/07/2019 | 03/08/2019 |
| Note: Released By: AMOBLEY | |||
| SWALE | COMPLETE | 03/07/2019 | 03/12/2019 |
| Note: Released By: TBAKER | |||
| PLENV | COMPLETE | 03/07/2019 | 03/08/2019 |
| Note: Released By: JMYERS Staff conducted a site visit on 3/8/19 and noted no Gopher Tortoise on the lot, however there are noted Gopher Tortoise in the area that might move into the lot. The lot should be silt fenced off as soon as possible to prevent any Gopher Tortoise from moving into construction areas. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 04/03/2019 |
| ELECTRIC FEE | ¤210.00 | 04/03/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 04/03/2019 |
| IMPACT FEE FIRE | ¤223.38 | 04/03/2019 |
| IMPACT FEE PARKS | ¤849.24 | 04/03/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/03/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 04/03/2019 |
| MECHANICAL FEE | ¤210.00 | 04/03/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 04/03/2019 |
| PLAN CHECK FEE | ¤100.00 | 04/03/2019 |
| PLUMBING FEE | ¤210.00 | 04/03/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤500.00 | 04/03/2019 |
| SITE PLAN 20 | ¤20.00 | 04/03/2019 |
| SURCHARGE FS 533.721 | ¤12.70 | 04/03/2019 |
| SURCHARGE - FS 468.631 | ¤19.05 | 04/03/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/03/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 04/03/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,605.23 |