I want to search for...
Permit #2019030815
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00600-0130 |
| CONDITIONED SPACE: 1875 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| OPENED PORCH (WITH ROOF) : 213 sqft |
| Total Square Footage: 2652 sqft |
| Block: 00600 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 407-307-4753 |
| Location Address: 158 POINT PLEASANT DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/10/2019 |
| NOC: RECORDED |
| Applicant name: SHAWN VIRAG |
| Owner: BRITE PROPERTIES OF FLORIDA LLC |
|
Address 619 EAST WASHINGTON ST ORLANDO, FL 32802 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤147,646.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SHAWNTELLE CONSULTING AND DESIGN LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
611 LARGOVISTA DR OAKLAND, FL 34787 |
CBC1261160 (Exp: 08/31/2020) | 407-307-4753 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/27/2020 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 02/26/2020 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION. 6 FOOT OF ROAD DAMAGE JUST OFF DRIVEWAY TO BE REPAIRED ASAP. ON SITE WITH SUPER TRYING TO GET A FINAL. | |||
| BLD - BUILDING FINAL | 02/26/2020 | Disapproved - NO FEE | FWILLIS |
| Note: THIS IS A REINSPECTION Outside Unit is not 3" above the ground as required. | |||
| BLD - BUILDING FINAL | 02/19/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: door locked number on house wrong missing #8 | |||
| ROW - FINAL APRON (AFTER POUR) | 02/19/2020 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: SAW CUT IS REQUIRED TO BE ALL THE WAY ACROSS THE CULVERT PIPE TO MITER OPENING, REMOVE CONCRETE THAT WAS POURED PAST THE END OF THE CULVERT FOOTER INTO THE SWALE AREA | |||
| ROW - FINAL INSPECTION | 02/19/2020 | APPROVED - AS NOTED | KHOWELL |
| Note: THIS WILL BE LOOKED AT AGAIN ONCE THE CONCRETE IS REMOVED AT THE ENDS OF THE FOOTER IN THE SWALE AREA | |||
| U -UTILITY RESIDENTIAL FINAL | 02/19/2020 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/18/2020 | APPROVED | KHOWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 02/18/2020 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/31/2020 | Disapproved - NO FEE | RGROSS |
| Note: FINAL SURVEY CANNOT BE SUBMITTED AND APPROVED BEFORE SOD IS PLACED. FINAL SURVEY MEANS FINAL ELEVATIONS. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/15/2020 | APPROVED | MMAJEWSKI |
| U - SEWER TIE IN | 01/10/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 01/10/2020 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 01/08/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 3:50 | |||
| PEP TANK INSTALLATION REQUEST | 12/09/2019 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 10/30/2019 | APPROVED | JDELBONIS |
| INSULATION | 10/11/2019 | APPROVED | FWILLIS |
| ALL ROUGH | 10/08/2019 | APPROVED - AS NOTED | JDELBONIS |
| Note: no 5 foot head pressure electric wires need nail plates | |||
| ROOF VALLEY & METAL | 09/18/2019 | APPROVED | JDELBONIS |
| ELECTRIC-TUG | 09/13/2019 | APPROVED | JDELBONIS |
| Note: TALKED TO SUSAN AT FPL 2:50 9/13/19 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/10/2019 | APPROVED | JDELBONIS |
| TIE BEAM / LINTEL | 08/09/2019 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 08/08/2019 | APPROVED | JMUNSON |
| MONOLITHIC SLAB | 07/30/2019 | APPROVED | JDELBONIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/24/2019 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 07/16/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 08/07/2019 | 08/08/2019 |
| Note: Released By: JMUNSON foundation | |||
| BLD | COMPLETE | 04/08/2019 | 04/15/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 04/08/2019 | 04/15/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | HOLD | 03/21/2019 | 03/28/2019 |
| Note: Held By: JHINDMAN 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784. | |||
| ELEC | COMPLETE | 03/21/2019 | 03/28/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 03/21/2019 | 03/21/2019 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 03/21/2019 | 03/28/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | HOLD | 03/21/2019 | 03/28/2019 |
| Note: Held By: JHINDMAN 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784. | |||
| SW1 | COMPLETE | 03/21/2019 | 03/28/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 03/21/2019 | 03/26/2019 |
| Note: Released By: AHALL PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap | |||
| ZON | COMPLETE | 03/21/2019 | 03/22/2019 |
| Note: Released By: AMOBLEY | |||
| SWALE | COMPLETE | 03/21/2019 | 03/27/2019 |
| Note: Released By: TBAKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/06/2020 |
| REINSPECTION FEE | ¤40.00 | 03/06/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤480.00 | 06/10/2019 |
| SITE PLAN 20 | ¤20.00 | 06/10/2019 |
| SURCHARGE FS 533.721 | ¤12.28 | 06/10/2019 |
| SURCHARGE - FS 468.631 | ¤18.42 | 06/10/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/10/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 06/10/2019 |
| ADMIN FEE | ¤20.00 | 06/10/2019 |
| ELECTRIC FEE | ¤204.00 | 06/10/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 06/10/2019 |
| IMPACT FEE FIRE | ¤223.38 | 06/10/2019 |
| IMPACT FEE PARKS | ¤849.24 | 06/10/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/10/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 06/10/2019 |
| MECHANICAL FEE | ¤204.00 | 06/10/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 06/10/2019 |
| PLAN CHECK FEE | ¤96.00 | 06/10/2019 |
| PLUMBING FEE | ¤204.00 | 06/10/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,642.18 |