I want to search for...

Permit #2019030815

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00600-0130
CONDITIONED SPACE: 1875 sqft
GARAGE: 516 sqft
OPENED PORCH (WITH ROOF) : 48 sqft
OPENED PORCH (WITH ROOF) : 213 sqft
Total Square Footage: 2652 sqft
Block: 00600
Subdivision: 2199 - SECTION 28-WYNNFIELD
Job Phone: 407-307-4753
Location Address: 158 POINT PLEASANT DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/10/2019
NOC: RECORDED
Applicant name: SHAWN VIRAG
Owner: BRITE PROPERTIES OF FLORIDA LLC

Address

619 EAST WASHINGTON ST

ORLANDO, FL 32802

Lot: 0130
Contracted Stated Job Value: ¤147,646.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SHAWNTELLE CONSULTING AND DESIGN LLC
Status Location Address State License Number Phone
CANCEL

611 LARGOVISTA DR

OAKLAND, FL 34787

CBC1261160 (Exp: 08/31/2020) 407-307-4753

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/27/2020 FINAL APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
ROW - FINAL APRON (AFTER POUR) 02/26/2020 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION. 6 FOOT OF ROAD DAMAGE JUST OFF DRIVEWAY TO BE REPAIRED ASAP. ON SITE WITH SUPER TRYING TO GET A FINAL.
BLD - BUILDING FINAL 02/26/2020 Disapproved - NO FEE FWILLIS
Note: THIS IS A REINSPECTION Outside Unit is not 3" above the ground as required.
BLD - BUILDING FINAL 02/19/2020 Disapproved -FEE REQUIRED JDELBONIS
Note: door locked number on house wrong missing #8
ROW - FINAL APRON (AFTER POUR) 02/19/2020 Disapproved -FEE REQUIRED KHOWELL
Note: SAW CUT IS REQUIRED TO BE ALL THE WAY ACROSS THE CULVERT PIPE TO MITER OPENING, REMOVE CONCRETE THAT WAS POURED PAST THE END OF THE CULVERT FOOTER INTO THE SWALE AREA
ROW - FINAL INSPECTION 02/19/2020 APPROVED - AS NOTED KHOWELL
Note: THIS WILL BE LOOKED AT AGAIN ONCE THE CONCRETE IS REMOVED AT THE ENDS OF THE FOOTER IN THE SWALE AREA
U -UTILITY RESIDENTIAL FINAL 02/19/2020 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 02/18/2020 APPROVED KHOWELL
FINAL SURVEY (OFFICE USE ONLY) 02/18/2020 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 01/31/2020 Disapproved - NO FEE RGROSS
Note: FINAL SURVEY CANNOT BE SUBMITTED AND APPROVED BEFORE SOD IS PLACED. FINAL SURVEY MEANS FINAL ELEVATIONS.
ROW- PRE-APRON (PRE-POUR) 01/15/2020 APPROVED MMAJEWSKI
U - SEWER TIE IN 01/10/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 01/10/2020 APPROVED JGIBSON
ELECTRIC - EARLY POWER 01/08/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 3:50
PEP TANK INSTALLATION REQUEST 12/09/2019 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 10/30/2019 APPROVED JDELBONIS
INSULATION 10/11/2019 APPROVED FWILLIS
ALL ROUGH 10/08/2019 APPROVED - AS NOTED JDELBONIS
Note: no 5 foot head pressure electric wires need nail plates
ROOF VALLEY & METAL 09/18/2019 APPROVED JDELBONIS
ELECTRIC-TUG 09/13/2019 APPROVED JDELBONIS
Note: TALKED TO SUSAN AT FPL 2:50 9/13/19
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/10/2019 APPROVED JDELBONIS
TIE BEAM / LINTEL 08/09/2019 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 08/08/2019 APPROVED JMUNSON
MONOLITHIC SLAB 07/30/2019 APPROVED JDELBONIS
PLUMBING 1ST ROUGH UNDERGROUND 07/24/2019 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 07/16/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
SW1 COMPLETE 08/07/2019 08/08/2019
Note: Released By: JMUNSON foundation
BLD COMPLETE 04/08/2019 04/15/2019
Note: Released By: JHINDMAN
PLUM COMPLETE 04/08/2019 04/15/2019
Note: Released By: JHINDMAN
BLD HOLD 03/21/2019 03/28/2019
Note: Held By: JHINDMAN 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784.
ELEC COMPLETE 03/21/2019 03/28/2019
Note: Released By: JHINDMAN
ENGIN1 COMPLETE 03/21/2019 03/21/2019
Note: Released By: TBAKER
MECH COMPLETE 03/21/2019 03/28/2019
Note: Released By: JHINDMAN
PLUM HOLD 03/21/2019 03/28/2019
Note: Held By: JHINDMAN 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784.
SW1 COMPLETE 03/21/2019 03/28/2019
Note: Released By: JHINDMAN
UD1 COMPLETE 03/21/2019 03/26/2019
Note: Released By: AHALL PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap
ZON COMPLETE 03/21/2019 03/22/2019
Note: Released By: AMOBLEY
SWALE COMPLETE 03/21/2019 03/27/2019
Note: Released By: TBAKER

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 03/06/2020
REINSPECTION FEE ¤40.00 03/06/2020
NEW RESIDENTIAL INSPECTIONS ¤480.00 06/10/2019
SITE PLAN 20 ¤20.00 06/10/2019
SURCHARGE FS 533.721 ¤12.28 06/10/2019
SURCHARGE - FS 468.631 ¤18.42 06/10/2019
STORM WATER PERMIT FEES ¤80.00 06/10/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 06/10/2019
ADMIN FEE ¤20.00 06/10/2019
ELECTRIC FEE ¤204.00 06/10/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 06/10/2019
IMPACT FEE FIRE ¤223.38 06/10/2019
IMPACT FEE PARKS ¤849.24 06/10/2019
IMPACT FEE SCHOOL ¤3,600.00 06/10/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 06/10/2019
MECHANICAL FEE ¤204.00 06/10/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 06/10/2019
PLAN CHECK FEE ¤96.00 06/10/2019
PLUMBING FEE ¤204.00 06/10/2019
Fees Total Due: ¤0.00 Total Paid: ¤7,642.18