I want to search for...
Permit #2019030820
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00380-0110 |
| CONDITIONED SPACE: 1683 sqft |
| OPENED PORCH (WITH ROOF) : 214 sqft |
| OPENED PORCH (WITH ROOF) : 40 sqft |
| GARAGE: 558 sqft |
| Total Square Footage: 2495 sqft |
| Block: 00380 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: 407-307-4753 |
| Location Address: 2 PRESTON LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/11/2019 |
| NOC: RECORDED |
| Applicant name: SHAWN VIRAG |
| Owner: BRITE PROPERTIES OF FLORIDA LLC |
|
Address 619 EAST WASHINGTON STREET ORLANDO, FL 32802 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤140,878.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SHAWNTELLE CONSULTING AND DESIGN LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
611 LARGOVISTA DR OAKLAND, FL 34787 |
CBC1261160 (Exp: 08/31/2020) | 407-307-4753 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/17/2019 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 12/17/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW - STORMWATER FINAL | 12/17/2019 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION. SEWER TIE-IN DAMAGE REPAIRED. | |||
| BLD - BUILDING FINAL | 12/10/2019 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: THIS IS A REINSPECTION doors locked ), ACCESS NEEDED FOR INSPECTION. (still locked_) | |||
| BLD - BUILDING FINAL | 11/21/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: doors locked ), ACCESS NEEDED FOR INSPECTION. | |||
| ROW - FINAL APRON (AFTER POUR) | 11/21/2019 | Disapproved -FEE REQUIRED | MMAJEWSKI |
| Note: NEED JOINT CUT DOWN CENTER OF CULVERT PIPE | |||
| U -UTILITY RESIDENTIAL FINAL | 11/21/2019 | APPROVED - AS NOTED | LFITZGERALD |
| Note: as discussed and agreed with Tom-Brite Homes, the sewer clean out will be relocated to 2 Preston Property line and tap area will be restored back to existing. | |||
| ROW - STORMWATER FINAL | 11/21/2019 | Disapproved - NO FEE | MMAJEWSKI |
| Note: HOUSE NUMBER 68 HAS YARD DAMAGE FROM SEWER TIE IN THAT NEEDS TO BE GRADED AND SODDED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/19/2019 | APPROVED | MMAJEWSKI |
| FINAL SURVEY (OFFICE USE ONLY) | 11/19/2019 | APPROVED | MMAJEWSKI |
| ROW- PRE-APRON (PRE-POUR) | 10/25/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: THIS IS A REINSPECTION MOVE LEFT SIDE OF THE ROAD FORM BOARD MARKED WITH BLACK LINE. CHECK UPPER LEFT SIDE FORM LOOKS LIKE IT IS SLOPING TOWARDS GARAGE FLOOR. It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/17/2019 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: 2" OF CONCRETE REQUIRED ABOVE THE OPENING OF THE CULVERT. CULVERT FOOTERS ARE REQUIRED TO BE A MINIMUM OF 6" DEEP. REMOVE HIGH AREAS IN ROW PAD AREA TO MINIMUM 5" THICK CONCRETE REQUIRED. CULVERT PIPE OUT OF TOLERANCE. RAISE ROAD FORM BOARD MAXIMUM OF 3/4" ABOVE EDGE OF PAVEMENT. REPAIR FORM AT GARAGE ON THE LEFT SIDE SO IT DOES NOT SLOPE TOWARDS THE GARAGE FLOOR | |||
| U - SEWER TIE IN | 09/27/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS APPROVED ON 9/26/19 | |||
| GRAVITY SEWER TEST | 09/27/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS APPROVED ON 9/26/19 | |||
| ELECTRIC - EARLY POWER | 09/27/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 10:20 | |||
| LATH/BRICK/ WATER BARRIER | 08/05/2019 | APPROVED | JDELBONIS |
| INSULATION | 08/01/2019 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 07/31/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: not finished | |||
| ALL ROUGH | 07/23/2019 | APPROVED | JCOLASANTI |
| ROOF VALLEY & METAL | 07/17/2019 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 07/10/2019 | Disapproved - NO FEE | JCOLASANTI |
| Note: shingles place on roof, could not chck underlayment or valley placement, need approval from office for approval of this inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/25/2019 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/24/2019 | Disapproved -FEE REQUIRED | MWILLIAMS |
| Note: not ready | |||
| ELECTRIC-TUG | 06/19/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED POWER 3:30 | |||
| TIE BEAM / LINTEL | 06/12/2019 | APPROVED | WMILLER |
| Note: APPROVED | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/06/2019 | APPROVED | JMUNSON |
| MONOLITHIC SLAB | 05/30/2019 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/24/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 06/05/2019 | 06/06/2019 |
| Note: Released By: JMUNSON foundation | |||
| BLD | COMPLETE | 04/04/2019 | 04/10/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 04/04/2019 | 04/10/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | HOLD | 03/21/2019 | 03/28/2019 |
| Note: Held By: JHINDMAN 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784. | |||
| ELEC | COMPLETE | 03/21/2019 | 03/28/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 03/21/2019 | 03/21/2019 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 03/21/2019 | 03/28/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | HOLD | 03/21/2019 | 03/28/2019 |
| Note: Held By: JHINDMAN 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784. | |||
| SW1 | COMPLETE | 03/21/2019 | 03/28/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 03/21/2019 | 03/26/2019 |
| Note: Released By: AHALL PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap | |||
| ZON | COMPLETE | 03/21/2019 | 03/25/2019 |
| Note: Released By: AMOBLEY | |||
| SWALE | COMPLETE | 03/21/2019 | 03/27/2019 |
| Note: Released By: TBAKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/08/2020 |
| REINSPECTION FEE | ¤40.00 | 12/05/2019 |
| REINSPECTION FEE | ¤40.00 | 12/05/2019 |
| REINSPECTION FEE | ¤40.00 | 12/05/2019 |
| CONTRACTOR CHANGE | ¤40.00 | 12/05/2019 |
| REINSPECTION FEE | ¤40.00 | 08/12/2019 |
| REINSPECTION FEE | ¤40.00 | 08/12/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤440.00 | 04/11/2019 |
| SITE PLAN 20 | ¤20.00 | 04/11/2019 |
| SURCHARGE FS 533.721 | ¤11.44 | 04/11/2019 |
| SURCHARGE - FS 468.631 | ¤17.16 | 04/11/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/11/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 04/11/2019 |
| ELECTRIC FEE | ¤192.00 | 04/11/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 04/11/2019 |
| IMPACT FEE FIRE | ¤223.38 | 04/11/2019 |
| IMPACT FEE PARKS | ¤849.24 | 04/11/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/11/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 04/11/2019 |
| MECHANICAL FEE | ¤192.00 | 04/11/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 04/11/2019 |
| PLAN CHECK FEE | ¤88.00 | 04/11/2019 |
| PLUMBING FEE | ¤192.00 | 04/11/2019 |
| ADMIN FEE | ¤20.00 | 04/11/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,756.08 |