I want to search for...
Permit #2019030834
Permit Details
Status: COED
| Parcel Id: 07-11-31-7025-00080-0140 |
| CONDITIONED SPACE: 1875 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| OPENED PORCH (WITH ROOF) : 213 sqft |
| Total Square Footage: 2652 sqft |
| Block: 00080 |
| Subdivision: 2189 - SECTION 25-PINE GROVE |
| Job Phone: 407-807-0656 |
| Location Address: 247 PARKVIEW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/18/2019 |
| NOC: RECORDED |
| Applicant name: NAVIN SUGRIM |
| Owner: DLP BRITE HOMES LLC |
|
Address 605 PALENCIA CLUB DRIVE ST AUGUSTINE, FL 32095 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤147,646.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DLP BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
CBC1263567 (Exp: 08/31/2022) | 407-807-0656 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 05/28/2020 | FINAL APPROVED | KHOWELL |
| BLD - BUILDING FINAL | 02/11/2020 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 02/06/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: THIS IS A REINSPECTION insulation cert garage has trash all over no hot water from any faucet | |||
| BLD - BUILDING FINAL | 01/30/2020 | Disapproved - NO FEE | JCOLASANTI |
| Note: THIS IS A REINSPECTION need to secure laundry tub...light in master closet does not shut off | |||
| BLD - BUILDING FINAL | 01/29/2020 | Disapproved - NO FEE | FWILLIS |
| Note: House locked. No access. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/29/2020 | FINAL APPROVED | MBACON |
| ROW - FINAL APRON (AFTER POUR) | 01/29/2020 | APPROVED | MMAJEWSKI |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/22/2020 | APPROVED | MMAJEWSKI |
| FINAL SURVEY (OFFICE USE ONLY) | 01/22/2020 | APPROVED | MMAJEWSKI |
| ROW- PRE-APRON (PRE-POUR) | 01/03/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION. ADJUSTMENTS WERE MADE ONSITE TO THE SIDEWALK, TO ALLOW THE PROPERTY TO DRAIN AND KEEP A SAFE SLOPE TO THE SIDEWALK. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/02/2020 | Disapproved - NO FEE | MMAJEWSKI |
| Note: DRIVE NOT FORMED UP | |||
| ELECTRIC - EARLY POWER | 10/29/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:00 | |||
| GRAVITY SEWER TEST | 09/23/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS DONE ON 9/20/19 | |||
| U - SEWER TIE IN | 09/23/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS DONE ON 9/20/19 | |||
| ELECTRIC-TUG | 08/29/2019 | APPROVED | WMILLER |
| Note: talked to Susan at fpl | |||
| LATH/BRICK/ WATER BARRIER | 08/28/2019 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 08/23/2019 | Disapproved - NO FEE | JCOLASANTI |
| Note: need to protect wood with lath above entrance door | |||
| INSULATION | 08/20/2019 | APPROVED | JDELBONIS |
| ALL ROUGH | 08/14/2019 | APPROVED - AS NOTED | JDELBONIS |
| Note: CHECK 5 FOOT HEAD PRESHURE AT INSULATION | |||
| ROOF VALLEY & METAL | 08/01/2019 | APPROVED | JDELBONIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/31/2019 | APPROVED | JDELBONIS |
| TIE BEAM / LINTEL | 07/15/2019 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Dowels installed as requested by previous inspector. | |||
| TIE BEAM / LINTEL | 07/08/2019 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: need dowel and down rod front entrance header, need two dowel and down rod at front column..need clearance antn rear door (all marked on plans) | |||
| FOUND SURVEY APPROVED (OFFICE) | 07/03/2019 | APPROVED | JMUNSON |
| MONOLITHIC SLAB | 06/24/2019 | APPROVED | MWILLIAMS |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/17/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 07/03/2019 | 07/03/2019 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 04/08/2019 | 04/15/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 04/08/2019 | 04/15/2019 |
| Note: Released By: JHINDMAN | |||
| SWALE | COMPLETE | 03/25/2019 | 04/01/2019 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 03/22/2019 | 03/28/2019 |
| Note: 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784. | |||
| ELEC | COMPLETE | 03/22/2019 | 03/28/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 03/22/2019 | 03/25/2019 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 03/22/2019 | 03/28/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | HOLD | 03/22/2019 | 03/28/2019 |
| Note: Held By: JHINDMAN 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784. | |||
| SW1 | COMPLETE | 03/22/2019 | 03/28/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 03/22/2019 | 03/27/2019 |
| Note: Released By: AHALL PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap | |||
| ZON | COMPLETE | 03/22/2019 | 03/25/2019 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 06/16/2020 |
| REINSPECTION FEE | ¤40.00 | 03/20/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| ADMIN FEE | ¤20.00 | 04/18/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤480.00 | 04/18/2019 |
| SITE PLAN 20 | ¤20.00 | 04/18/2019 |
| SURCHARGE FS 533.721 | ¤12.28 | 04/18/2019 |
| SURCHARGE - FS 468.631 | ¤18.42 | 04/18/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/18/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 04/18/2019 |
| ELECTRIC FEE | ¤204.00 | 04/18/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 04/18/2019 |
| IMPACT FEE FIRE | ¤223.38 | 04/18/2019 |
| IMPACT FEE PARKS | ¤849.24 | 04/18/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/18/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 04/18/2019 |
| MECHANICAL FEE | ¤204.00 | 04/18/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 04/18/2019 |
| PLAN CHECK FEE | ¤96.00 | 04/18/2019 |
| PLUMBING FEE | ¤204.00 | 04/18/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,722.18 |