Permit #2019030834

Permit Details

Status: COED

Parcel Id: 07-11-31-7025-00080-0140
CONDITIONED SPACE: 1875 sqft
GARAGE: 516 sqft
OPENED PORCH (WITH ROOF) : 48 sqft
OPENED PORCH (WITH ROOF) : 213 sqft
Total Square Footage: 2652 sqft
Block: 00080
Subdivision: 2189 - SECTION 25-PINE GROVE
Job Phone: 407-807-0656
Location Address: 247 PARKVIEW DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/18/2019
NOC: RECORDED
Applicant name: NAVIN SUGRIM
Owner: DLP BRITE HOMES LLC

Address

605 PALENCIA CLUB DRIVE

ST AUGUSTINE, FL 32095

Lot: 0140
Contracted Stated Job Value: ¤147,646.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

DLP BUILDERS LLC
Status Location Address State License Number Phone
CANCEL

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

CBC1263567 (Exp: 08/31/2022) 407-807-0656

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853
THOMAS WALTER ALBANO
Status Location Address State License Number Phone Fax
INACTIVE

P. O. BOX 352075

Palm Coast, FL 32135

CFC045991 (Exp: 08/31/2024) 386-437-2795 (386)437-2781

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 05/28/2020 FINAL APPROVED KHOWELL
BLD - BUILDING FINAL 02/11/2020 FINAL APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 02/06/2020 Disapproved -FEE REQUIRED JDELBONIS
Note: THIS IS A REINSPECTION insulation cert garage has trash all over no hot water from any faucet
BLD - BUILDING FINAL 01/30/2020 Disapproved - NO FEE JCOLASANTI
Note: THIS IS A REINSPECTION need to secure laundry tub...light in master closet does not shut off
BLD - BUILDING FINAL 01/29/2020 Disapproved - NO FEE FWILLIS
Note: House locked. No access.
U -UTILITY RESIDENTIAL FINAL 01/29/2020 FINAL APPROVED MBACON
ROW - FINAL APRON (AFTER POUR) 01/29/2020 APPROVED MMAJEWSKI
ROW FIELD SURVEY /GRADING CERTIFICATION 01/22/2020 APPROVED MMAJEWSKI
FINAL SURVEY (OFFICE USE ONLY) 01/22/2020 APPROVED MMAJEWSKI
ROW- PRE-APRON (PRE-POUR) 01/03/2020 APPROVED - AS NOTED MMAJEWSKI
Note: THIS IS A REINSPECTION. ADJUSTMENTS WERE MADE ONSITE TO THE SIDEWALK, TO ALLOW THE PROPERTY TO DRAIN AND KEEP A SAFE SLOPE TO THE SIDEWALK.
ROW- PRE-APRON (PRE-POUR) 01/02/2020 Disapproved - NO FEE MMAJEWSKI
Note: DRIVE NOT FORMED UP
ELECTRIC - EARLY POWER 10/29/2019 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:00
GRAVITY SEWER TEST 09/23/2019 APPROVED - AS NOTED JGIBSON
Note: THIS WAS DONE ON 9/20/19
U - SEWER TIE IN 09/23/2019 APPROVED - AS NOTED JGIBSON
Note: THIS WAS DONE ON 9/20/19
ELECTRIC-TUG 08/29/2019 APPROVED WMILLER
Note: talked to Susan at fpl
LATH/BRICK/ WATER BARRIER 08/28/2019 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION
LATH/BRICK/ WATER BARRIER 08/23/2019 Disapproved - NO FEE JCOLASANTI
Note: need to protect wood with lath above entrance door
INSULATION 08/20/2019 APPROVED JDELBONIS
ALL ROUGH 08/14/2019 APPROVED - AS NOTED JDELBONIS
Note: CHECK 5 FOOT HEAD PRESHURE AT INSULATION
ROOF VALLEY & METAL 08/01/2019 APPROVED JDELBONIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/31/2019 APPROVED JDELBONIS
TIE BEAM / LINTEL 07/15/2019 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Dowels installed as requested by previous inspector.
TIE BEAM / LINTEL 07/08/2019 Disapproved -FEE REQUIRED JCOLASANTI
Note: need dowel and down rod front entrance header, need two dowel and down rod at front column..need clearance antn rear door (all marked on plans)
FOUND SURVEY APPROVED (OFFICE) 07/03/2019 APPROVED JMUNSON
MONOLITHIC SLAB 06/24/2019 APPROVED MWILLIAMS
PLUMBING 1ST ROUGH UNDERGROUND 06/17/2019 APPROVED JGIBSON

Review History

Department Status Date In Date Out
SW1 COMPLETE 07/03/2019 07/03/2019
Note: Released By: JMUNSON
BLD COMPLETE 04/08/2019 04/15/2019
Note: Released By: JHINDMAN
PLUM COMPLETE 04/08/2019 04/15/2019
Note: Released By: JHINDMAN
SWALE COMPLETE 03/25/2019 04/01/2019
Note: Released By: TBAKER
BLD HOLD 03/22/2019 03/28/2019
Note: 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784.
ELEC COMPLETE 03/22/2019 03/28/2019
Note: Released By: JHINDMAN
ENGIN1 COMPLETE 03/22/2019 03/25/2019
Note: Released By: TBAKER
MECH COMPLETE 03/22/2019 03/28/2019
Note: Released By: JHINDMAN
PLUM HOLD 03/22/2019 03/28/2019
Note: Held By: JHINDMAN 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784.
SW1 COMPLETE 03/22/2019 03/28/2019
Note: Released By: JHINDMAN
UD1 COMPLETE 03/22/2019 03/27/2019
Note: Released By: AHALL PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap
ZON COMPLETE 03/22/2019 03/25/2019
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 06/16/2020
REINSPECTION FEE ¤40.00 03/20/2020
CONTRACTOR CHANGE ¤40.00 08/13/2019
REINSPECTION FEE ¤40.00 08/13/2019
ADMIN FEE ¤20.00 04/18/2019
NEW RESIDENTIAL INSPECTIONS ¤480.00 04/18/2019
SITE PLAN 20 ¤20.00 04/18/2019
SURCHARGE FS 533.721 ¤12.28 04/18/2019
SURCHARGE - FS 468.631 ¤18.42 04/18/2019
STORM WATER PERMIT FEES ¤80.00 04/18/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 04/18/2019
ELECTRIC FEE ¤204.00 04/18/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 04/18/2019
IMPACT FEE FIRE ¤223.38 04/18/2019
IMPACT FEE PARKS ¤849.24 04/18/2019
IMPACT FEE SCHOOL ¤3,600.00 04/18/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 04/18/2019
MECHANICAL FEE ¤204.00 04/18/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 04/18/2019
PLAN CHECK FEE ¤96.00 04/18/2019
PLUMBING FEE ¤204.00 04/18/2019
Fees Total Due: ¤0.00 Total Paid: ¤7,722.18