I want to search for...
Permit #2019030838
Permit Details
Status: COED
| Parcel Id: 07-11-31-7025-00160-0380 |
| CONDITIONED SPACE: 1875 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| OPENED PORCH (WITH ROOF) : 213 sqft |
| Total Square Footage: 2652 sqft |
| Block: 00160 |
| Subdivision: 2189 - SECTION 25-PINE GROVE |
| Job Phone: 407-307-4753 |
| Location Address: 48 PERSIMMON DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/17/2019 |
| NOC: RECORDED |
| Applicant name: SHAWN VIRAG |
| Owner: BRITE PROPERTIES OF FLORIDA LLC |
|
Address 619 EAST WASHINGTON STREET ORLANDO, FL 32802 |
| Lot: 0380 |
| Contracted Stated Job Value: ¤147,646.00 |
| Job Description: SINGLE FAMILY RESEDENCE |
| Type: CN |
Contractor
SHAWNTELLE CONSULTING AND DESIGN LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
611 LARGOVISTA DR OAKLAND, FL 34787 |
CBC1261160 (Exp: 08/31/2020) | 407-307-4753 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL INSPECTION | 02/26/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 02/19/2020 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 02/19/2020 | FINAL APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL INSPECTION | 02/19/2020 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: THIS IS A REINSPECTION SAW CUT IS REQUIRED TO BE ALL THE WAY ACROSS THE CULVERT PIPE TO MITER OPENING, REMOVE CONCRETE THAT WAS POURED PAST THE END OF THE CULVERT FOOTER INTO THE SWALE AREA. CLEAN THE CONCRETE OUT OF THE CULVERT PIPE. | |||
| ROW - FINAL INSPECTION | 02/06/2020 | Disapproved -FEE REQUIRED | RGROSS |
| Note: PALLETS LEFT ON THE CORNER OF PERSIMMON AND PERCH LEFT BY THE SOD CREW NEED REMOVED. WATER LEAK FILLING THE SWALE NEEDS TO BE FOUND AND REPAIRED. PHOTO'S ATTACHED. | |||
| ROW - FINAL APRON (AFTER POUR) | 02/06/2020 | APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 02/06/2020 | Disapproved - NO FEE | MBACON |
| Note: Please cut sewer clean out to grade and install cap! Also as a courtesy i shutoff water meter as you have a leak in the pvc pipe on your side of the meter. | |||
| BLD - BUILDING FINAL | 02/06/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: doors locked | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/31/2020 | APPROVED - AS NOTED | RGROSS |
| Note: PALLATS LEFT BY SOD CREWS ON THE CORNER LOT/ VACANT AT PERCH PL WILL NEED TO BE REMOVED BEFORE FINAL STORMWATER WILL BE APPROVED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/31/2020 | APPROVED - AS NOTED | RGROSS |
| Note: PALLATS LEFT BY SOD CREWS ON THE CORNER LOT/ VACANT AT PERCH PL WILL NEED TO BE REMOVED BEFORE FINAL STORMWATER WILL BE APPROVED. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/15/2020 | APPROVED | MMAJEWSKI |
| U - SEWER TIE IN | 01/08/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 01/08/2020 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 11/25/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: POWER SHOULD NOT BE ON HOME PRIOR TO EARLY POWER INSPECTION, EMAILED FPL RELEASED POWER 9:20 | |||
| ELECTRIC-TUG | 09/24/2019 | APPROVED - AS NOTED | RMARTIN |
| LATH/BRICK/ WATER BARRIER | 09/24/2019 | APPROVED | FWILLIS |
| INSULATION | 09/23/2019 | APPROVED | JDELBONIS |
| ALL ROUGH | 09/18/2019 | APPROVED | JDELBONIS |
| ROOF VALLEY & METAL | 09/16/2019 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 08/29/2019 | Disapproved - NO FEE | WMILLER |
| Note: FLASHING, BASE AND COUNTER FLASHING, R905.2.8.1 (1 – 3), 4in X 4in L-FLASHING AT WALL ROOF INTERSECTIONS MUST BE SET IN APPROVED FLASHING CEMENT AND SET FLUSH TO THE BASE OF THE WALL AND OVER THE UNDERLAYMENT. BOTH HORIZONTAL AND VERTICLE METAL FLANGES SHALL BE FASTENED 6in OC WITH APPROVED FASTENERS. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/22/2019 | APPROVED | JDELBONIS |
| TIE BEAM / LINTEL | 08/02/2019 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 07/31/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: steal down rod on side of entry door is not pined in or tied | |||
| FOUND SURVEY APPROVED (OFFICE) | 07/30/2019 | APPROVED | JMUNSON |
| MONOLITHIC SLAB | 07/22/2019 | APPROVED | JDELBONIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/17/2019 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 07/02/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 07/24/2019 | 07/24/2019 |
| Note: Released By: JMUNSON foundation | |||
| BLD | COMPLETE | 05/31/2019 | 06/07/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 05/31/2019 | 06/07/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 05/31/2019 | 06/07/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 05/31/2019 | 06/04/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 04/08/2019 | 04/15/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 04/08/2019 | 04/15/2019 |
| Note: Released By: JHINDMAN | |||
| SWALE | COMPLETE | 03/25/2019 | 04/01/2019 |
| Note: Released By: TBAKER | |||
| BLD | HOLD | 03/22/2019 | 03/28/2019 |
| Note: Held By: JHINDMAN 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784. | |||
| ELEC | COMPLETE | 03/22/2019 | 03/28/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 03/22/2019 | 03/25/2019 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 03/22/2019 | 03/28/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | HOLD | 03/22/2019 | 03/28/2019 |
| Note: Held By: JHINDMAN 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784. | |||
| SW1 | COMPLETE | 03/22/2019 | 03/28/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 03/22/2019 | 03/27/2019 |
| Note: Released By: AHALL PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap | |||
| ZON | COMPLETE | 03/22/2019 | 03/25/2019 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/06/2020 |
| REINSPECTION FEE | ¤40.00 | 03/06/2020 |
| REINSPECTION FEE | ¤40.00 | 03/06/2020 |
| REINSPECTION FEE | ¤40.00 | 12/05/2019 |
| CONTRACTOR CHANGE | ¤40.00 | 08/12/2019 |
| ELECTRIC FEE | ¤204.00 | 05/17/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 05/17/2019 |
| IMPACT FEE FIRE | ¤223.38 | 05/17/2019 |
| IMPACT FEE PARKS | ¤849.24 | 05/17/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/17/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 05/17/2019 |
| MECHANICAL FEE | ¤204.00 | 05/17/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 05/17/2019 |
| PLAN CHECK FEE | ¤96.00 | 05/17/2019 |
| PLUMBING FEE | ¤204.00 | 05/17/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤480.00 | 05/17/2019 |
| SITE PLAN 20 | ¤20.00 | 05/17/2019 |
| SURCHARGE FS 533.721 | ¤12.28 | 05/17/2019 |
| SURCHARGE - FS 468.631 | ¤18.42 | 05/17/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/17/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 05/17/2019 |
| ADMIN FEE | ¤20.00 | 05/17/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,762.18 |