I want to search for...

Permit #2019030900

Permit Details

Status: COED

Parcel Id: 07-11-31-7029-00760-0180
CONDITIONED SPACE: 1875 sqft
GARAGE: 516 sqft
OPENED PORCH (WITH ROOF) : 48 sqft
OPENED PORCH (WITH ROOF) : 213 sqft
Total Square Footage: 2652 sqft
Block: 00760
Subdivision: 2209 - SECTION 29-ROYAL PALMS
Job Phone: 407-307-4753
Location Address: 28 RYMSHAW DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/16/2019
NOC: RECORDED
Applicant name: SHAWN VIRAG
Owner: BRITE PROPERTIES OF FLORIDA LLC

Address

619 EAST WASHINGTON STREET

ORLANDO, FL 32802

Lot: 0180
Contracted Stated Job Value: ¤147,646.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SHAWNTELLE CONSULTING AND DESIGN LLC
Status Location Address State License Number Phone
CANCEL

611 LARGOVISTA DR

OAKLAND, FL 34787

CBC1261160 (Exp: 08/31/2020) 407-307-4753

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 12/10/2019 APPROVED - AS NOTED MMAJEWSKI
Note: THIS IS A REINSPECTION. DUMPSTER ACROSS THE STREET IS FOR NEW JOB STARTING IN A WEEK.
U -UTILITY RESIDENTIAL FINAL 12/09/2019 FINAL APPROVED LFITZGERALD
ROW - FINAL INSPECTION 12/09/2019 Disapproved - NO FEE MMAJEWSKI
Note: DUMPSTER ACROSS THE STREET NEEDS TO BE REMOVED AND ANY DAMAGE TO THE SWALE WILL NEED TO BE FIXED
BLD - BUILDING FINAL 12/09/2019 APPROVED JDELBONIS
ROW - FINAL APRON (AFTER POUR) 12/09/2019 APPROVED MMAJEWSKI
ROW FIELD SURVEY /GRADING CERTIFICATION 12/06/2019 APPROVED MMAJEWSKI
FINAL SURVEY (OFFICE USE ONLY) 12/06/2019 APPROVED MMAJEWSKI
ROW- PRE-APRON (PRE-POUR) 11/13/2019 APPROVED - AS NOTED KHOWELL
Note: MOVE THE ROAD FORM BOARD SO THE INSIDE LINES UP WITH THE EXISTING EDGE OF PAVEMENT It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ELECTRIC-TUG 11/12/2019 APPROVED - AS NOTED RMARTIN
Note: ALREADY CALLED THIS INSPECTION IN
ELECTRIC - EARLY POWER 11/01/2019 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 11:15
GRAVITY SEWER TEST 10/25/2019 APPROVED JDELBONIS
U - SEWER TIE IN 10/25/2019 APPROVED JDELBONIS
LATH/BRICK/ WATER BARRIER 10/01/2019 APPROVED JDELBONIS
PEP TANK INSTALLATION REQUEST 09/27/2019 APPROVED CSTONE
Note: Once you request your pep tank we ask that you keep the site clear until the tank is in. You will have 72 hours after pep tank request has been approved to get the site ready. Site ready means area is clear without driveway, sod, paint, sidewalks, or irrigation in the way. If you have underground power where the pep tank will be located you will need to have that moved.
INSULATION 09/23/2019 APPROVED DROCKWELL
ALL ROUGH 09/19/2019 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
ALL ROUGH 09/18/2019 Disapproved -FEE REQUIRED DROCKWELL
Note: Outlets on plan in garage are filled with foam...remove foam and wire/UFER must be readily available...remove concrete around clamp
ROOF VALLEY & METAL 09/06/2019 APPROVED FWILLIS
ELECTRIC-TUG 08/28/2019 APPROVED - AS NOTED RMARTIN
Note: CALLED FPL AT 11:30 RELEASED POWER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/23/2019 APPROVED - AS NOTED JDELBONIS
Note: truses R21and R05 neet straps to tie down to wall and rear pear holding up headders needs repair and to be filled solid
ELECTRIC-TUG 07/19/2019 Disapproved -FEE REQUIRED JDELBONIS
Note: UFER CONNECTION NEEDS TO BE ACCESSABLE NEC 250.68(A)
TIE BEAM / LINTEL 07/15/2019 APPROVED DROCKWELL
FOUND SURVEY APPROVED (OFFICE) 07/11/2019 APPROVED JMUNSON
MONOLITHIC SLAB 07/09/2019 APPROVED FWILLIS
Note: THIS IS A REINSPECTION Lanai footer has been cleared with 3" coverage as requested by previous inspector. Because of rains be mindful of other areas before you pour.
MONOLITHIC SLAB 07/08/2019 Disapproved -FEE REQUIRED DROCKWELL
Note: Clean footer back lanai..steel under dirt
PLUMBING 1ST ROUGH UNDERGROUND 06/28/2019 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 06/12/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
SW1 COMPLETE 07/11/2019 07/11/2019
Note: Released By: JMUNSON
ZON COMPLETE 04/17/2019 04/17/2019
Note: Released By: AMOBLEY
ZON HOLD 04/10/2019 04/10/2019
Note: Held By: AMOBLEY No new landscape plan submitted
BLD COMPLETE 04/10/2019 04/17/2019
Note: Released By: JHINDMAN
PLUM COMPLETE 04/10/2019 04/17/2019
Note: Released By: JHINDMAN
BLD HOLD 03/25/2019 04/01/2019
Note: Held By: JHINDMAN 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784.
ELEC COMPLETE 03/25/2019 04/01/2019
Note: Released By: JHINDMAN
ENGIN1 COMPLETE 03/25/2019 03/25/2019
Note: Released By: TBAKER
MECH COMPLETE 03/25/2019 03/28/2019
Note: Released By: RLEE
PLUM HOLD 03/25/2019 04/01/2019
Note: Held By: JHINDMAN 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784.
SW1 COMPLETE 03/25/2019 03/28/2019
Note: Released By: RLEE
UD1 COMPLETE 03/25/2019 03/27/2019
Note: Released By: AHALL PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap
ZON HOLD 03/25/2019 03/26/2019
Note: Held By: AMOBLEY Additional shrubs required in the back of home because it backs up to a right of way
SWALE COMPLETE 03/25/2019 03/28/2019
Note: Released By: TBAKER

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/05/2019
REINSPECTION FEE ¤40.00 08/13/2019
REINSPECTION FEE ¤40.00 08/13/2019
NEW RESIDENTIAL INSPECTIONS ¤480.00 05/16/2019
SITE PLAN 20 ¤20.00 05/16/2019
SURCHARGE FS 533.721 ¤12.28 05/16/2019
SURCHARGE - FS 468.631 ¤18.42 05/16/2019
STORM WATER PERMIT FEES ¤80.00 05/16/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 05/16/2019
ADMIN FEE ¤20.00 05/16/2019
ELECTRIC FEE ¤204.00 05/16/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 05/16/2019
IMPACT FEE FIRE ¤223.38 05/16/2019
IMPACT FEE PARKS ¤849.24 05/16/2019
IMPACT FEE SCHOOL ¤3,600.00 05/16/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 05/16/2019
MECHANICAL FEE ¤204.00 05/16/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 05/16/2019
PLAN CHECK FEE ¤96.00 05/16/2019
PLUMBING FEE ¤204.00 05/16/2019
Fees Total Due: ¤0.00 Total Paid: ¤7,682.18