I want to search for...
Permit #2019030900
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00760-0180 |
| CONDITIONED SPACE: 1875 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| OPENED PORCH (WITH ROOF) : 213 sqft |
| Total Square Footage: 2652 sqft |
| Block: 00760 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: 407-307-4753 |
| Location Address: 28 RYMSHAW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/16/2019 |
| NOC: RECORDED |
| Applicant name: SHAWN VIRAG |
| Owner: BRITE PROPERTIES OF FLORIDA LLC |
|
Address 619 EAST WASHINGTON STREET ORLANDO, FL 32802 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤147,646.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SHAWNTELLE CONSULTING AND DESIGN LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
611 LARGOVISTA DR OAKLAND, FL 34787 |
CBC1261160 (Exp: 08/31/2020) | 407-307-4753 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL INSPECTION | 12/10/2019 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION. DUMPSTER ACROSS THE STREET IS FOR NEW JOB STARTING IN A WEEK. | |||
| U -UTILITY RESIDENTIAL FINAL | 12/09/2019 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 12/09/2019 | Disapproved - NO FEE | MMAJEWSKI |
| Note: DUMPSTER ACROSS THE STREET NEEDS TO BE REMOVED AND ANY DAMAGE TO THE SWALE WILL NEED TO BE FIXED | |||
| BLD - BUILDING FINAL | 12/09/2019 | APPROVED | JDELBONIS |
| ROW - FINAL APRON (AFTER POUR) | 12/09/2019 | APPROVED | MMAJEWSKI |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/06/2019 | APPROVED | MMAJEWSKI |
| FINAL SURVEY (OFFICE USE ONLY) | 12/06/2019 | APPROVED | MMAJEWSKI |
| ROW- PRE-APRON (PRE-POUR) | 11/13/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: MOVE THE ROAD FORM BOARD SO THE INSIDE LINES UP WITH THE EXISTING EDGE OF PAVEMENT It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ELECTRIC-TUG | 11/12/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: ALREADY CALLED THIS INSPECTION IN | |||
| ELECTRIC - EARLY POWER | 11/01/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:15 | |||
| GRAVITY SEWER TEST | 10/25/2019 | APPROVED | JDELBONIS |
| U - SEWER TIE IN | 10/25/2019 | APPROVED | JDELBONIS |
| LATH/BRICK/ WATER BARRIER | 10/01/2019 | APPROVED | JDELBONIS |
| PEP TANK INSTALLATION REQUEST | 09/27/2019 | APPROVED | CSTONE |
| Note: Once you request your pep tank we ask that you keep the site clear until the tank is in. You will have 72 hours after pep tank request has been approved to get the site ready. Site ready means area is clear without driveway, sod, paint, sidewalks, or irrigation in the way. If you have underground power where the pep tank will be located you will need to have that moved. | |||
| INSULATION | 09/23/2019 | APPROVED | DROCKWELL |
| ALL ROUGH | 09/19/2019 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 09/18/2019 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Outlets on plan in garage are filled with foam...remove foam and wire/UFER must be readily available...remove concrete around clamp | |||
| ROOF VALLEY & METAL | 09/06/2019 | APPROVED | FWILLIS |
| ELECTRIC-TUG | 08/28/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: CALLED FPL AT 11:30 RELEASED POWER | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/23/2019 | APPROVED - AS NOTED | JDELBONIS |
| Note: truses R21and R05 neet straps to tie down to wall and rear pear holding up headders needs repair and to be filled solid | |||
| ELECTRIC-TUG | 07/19/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: UFER CONNECTION NEEDS TO BE ACCESSABLE NEC 250.68(A) | |||
| TIE BEAM / LINTEL | 07/15/2019 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 07/11/2019 | APPROVED | JMUNSON |
| MONOLITHIC SLAB | 07/09/2019 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION Lanai footer has been cleared with 3" coverage as requested by previous inspector. Because of rains be mindful of other areas before you pour. | |||
| MONOLITHIC SLAB | 07/08/2019 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Clean footer back lanai..steel under dirt | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/28/2019 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 06/12/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 07/11/2019 | 07/11/2019 |
| Note: Released By: JMUNSON | |||
| ZON | COMPLETE | 04/17/2019 | 04/17/2019 |
| Note: Released By: AMOBLEY | |||
| ZON | HOLD | 04/10/2019 | 04/10/2019 |
| Note: Held By: AMOBLEY No new landscape plan submitted | |||
| BLD | COMPLETE | 04/10/2019 | 04/17/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 04/10/2019 | 04/17/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | HOLD | 03/25/2019 | 04/01/2019 |
| Note: Held By: JHINDMAN 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784. | |||
| ELEC | COMPLETE | 03/25/2019 | 04/01/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 03/25/2019 | 03/25/2019 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 03/25/2019 | 03/28/2019 |
| Note: Released By: RLEE | |||
| PLUM | HOLD | 03/25/2019 | 04/01/2019 |
| Note: Held By: JHINDMAN 1. Provide a digital signature with cwertification that can be validatedon the plan without going to a 3rd party website. Florida Aministrative Code 61g-15-23. J. Hindman 986-3784. | |||
| SW1 | COMPLETE | 03/25/2019 | 03/28/2019 |
| Note: Released By: RLEE | |||
| UD1 | COMPLETE | 03/25/2019 | 03/27/2019 |
| Note: Released By: AHALL PEP Tank areas new home This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap | |||
| ZON | HOLD | 03/25/2019 | 03/26/2019 |
| Note: Held By: AMOBLEY Additional shrubs required in the back of home because it backs up to a right of way | |||
| SWALE | COMPLETE | 03/25/2019 | 03/28/2019 |
| Note: Released By: TBAKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 12/05/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| REINSPECTION FEE | ¤40.00 | 08/13/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤480.00 | 05/16/2019 |
| SITE PLAN 20 | ¤20.00 | 05/16/2019 |
| SURCHARGE FS 533.721 | ¤12.28 | 05/16/2019 |
| SURCHARGE - FS 468.631 | ¤18.42 | 05/16/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/16/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 05/16/2019 |
| ADMIN FEE | ¤20.00 | 05/16/2019 |
| ELECTRIC FEE | ¤204.00 | 05/16/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 05/16/2019 |
| IMPACT FEE FIRE | ¤223.38 | 05/16/2019 |
| IMPACT FEE PARKS | ¤849.24 | 05/16/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/16/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 05/16/2019 |
| MECHANICAL FEE | ¤204.00 | 05/16/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 05/16/2019 |
| PLAN CHECK FEE | ¤96.00 | 05/16/2019 |
| PLUMBING FEE | ¤204.00 | 05/16/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,682.18 |