I want to search for...
Permit #2019030911
Permit Details
Status: CANCEL
| Parcel Id: 07-11-31-7032-00040-0060 |
| Block: 00040 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 386-227-2646 |
| Location Address: 9 ROUND THORN DR |
| Type: DR - DRIVEWAY |
| Issue Date: 04/01/2019 |
| NOC: Unknown |
| Applicant name: JUAN P BARTOLOME HERNANDEZ |
| Owner: POTTER RICHARD & DIANE H&W TRUSTEES |
|
Address 9 ROUND THORN DR PALM COAST, FL 32164 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤1,000.00 |
| Job Description: REPLACE DRIVEWAY CONCRETE |
Contractor
A TOUCH OF SPAIN INC
| Status | Location Address | Phone |
| INACTIVE |
74 SEVEN WONDERS TRAIL , |
386-227-2646 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 05/14/2019 | Disapproved - NO FEE | KHOWELL |
| Note: CLEAN THE CONCRETE OUT OF THE CULVERT PIPE, THE ASPHALT PATCH NEEDS TO BE THE SAME HEIGHT AS THE CONCRETE DRIVEWAY ALONG THE EDGE OF PAVEMENT | |||
| ROW- PRE-APRON (PRE-POUR) | 05/06/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: THIS IS A REINSPECTION It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/25/2019 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: CULVERT PIPE OUT OF TOLERANCE AND SLOPED WRONG DIRECTION. FOOTERS NEED TO BE A MINIMUM OF 6" DEEP, 5" MINIMUM THICK CONCRETE REQUIRED IN THE R.O.W. AND 4" MINIMUM THICK CONCRETE REQUIRED PAST THE R.O.W. | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/25/2019 | 03/28/2019 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 03/25/2019 | 03/28/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 03/25/2019 | 03/28/2019 |
| Note: Released By: AHALL All Concrete, Driveways, Pavers, Pools / Sidewalks ETC. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind. | |||
| ZON | COMPLETE | 03/25/2019 | 03/25/2019 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SITE PLAN 20 | ¤20.00 | 04/01/2019 |
| SURCHARGE FS 533.721 | ¤2.00 | 04/01/2019 |
| SURCHARGE - FS 468.631 | ¤2.00 | 04/01/2019 |
| STORM WATER PERMIT FEES | ¤40.00 | 04/01/2019 |
| ADMIN FEE | ¤20.00 | 04/01/2019 |
| REINSPECTION FEE | ¤40.00 | |
| Fees | Total Due: ¤40.00 | Total Paid: ¤84.00 |