Permit #2019030919
Permit Details
Status: CANCEL
| Parcel Id: 07-11-31-7027-00490-0160 |
| Block: 00490 |
| Subdivision: 2128 - SECTION 27-WYNNFIELD |
| Job Phone: 386-227-2646 |
| Location Address: 49 WOODBURY DR |
| Type: DR - DRIVEWAY |
| Issue Date: 05/28/2019 |
| NOC: Unknown |
| Applicant name: JUAN P BARTOLOME HERNANDEZ |
| Owner: TRIANA, ANA IVIS CARDENAS & URBANO CARDENAS ARIAS |
|
Address & HILDA TRIANA JTWROS PALM COAST, FL 32164 |
|
Address 49 WOODBURY DRIVE PALM COAST, FL 32164 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤500.00 |
| Job Description: REMOVE CONCRETE DRIVEWAY AND ADD PAVERS DESIGN INTO DRIVEWAY |
| Type: CN |
Contractor
A TOUCH OF SPAIN INC
| Status | Location Address | Phone |
| INACTIVE |
74 SEVEN WONDERS TRAIL , |
386-227-2646 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- PRE-APRON (PRE-POUR) | 07/23/2019 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: WORK HAS BEEN DONE WITH NO INSPECTION, AND THE WAY IT HAS BEEN DONE WATER CAN POSSIBLY WASH OUT AND UNDERMINE THE EXISTING DRIVEWAY | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 04/15/2019 | 04/15/2019 |
| Note: Released By: TDOAK | |||
| ENGIN1 | COMPLETE | 04/15/2019 | 04/15/2019 |
| Note: Released By: TBAKER | |||
| UD1 | COMPLETE | 04/15/2019 | 04/24/2019 |
| Note: Released By: AHALL All Concrete, Driveways, Pavers, Pools / Sidewalks ETC. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind. | |||
| SW1 | COMPLETE | 04/15/2019 | 04/18/2019 |
| Note: Released By: RLEE | |||
| ENGIN1 | COMPLETE | 04/01/2019 | 04/01/2019 |
| Note: Released By: AHALL All Concrete, Driveways, Pavers, Pools / Sidewalks ETC. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind. | |||
| ENGIN1 | HOLD | 03/25/2019 | 03/25/2019 |
| Note: Held By: TBAKER Please provide more information on locations and extent of work. | |||
| SW1 | COMPLETE | 03/25/2019 | 03/28/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 03/25/2019 | 04/01/2019 |
| Note: Released By: AHALL All Concrete, Driveways, Pavers, Pools / Sidewalks ETC. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind. | |||
| ZON | HOLD | 03/25/2019 | 03/26/2019 |
| Note: Held By: AMOBLEY Please be more specific of work being done. Job description says remove concrete and pavers. What work is being done? |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SITE PLAN 20 | ¤20.00 | 05/28/2019 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/28/2019 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/28/2019 |
| STORM WATER PERMIT FEES | ¤40.00 | 05/28/2019 |
| ADMIN FEE | ¤20.00 | 05/28/2019 |
| REINSPECTION FEE | ¤40.00 | |
| Fees | Total Due: ¤40.00 | Total Paid: ¤84.00 |