Permit #2019040185
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-0620 |
| CONDITIONED SPACE: 3289 sqft |
| GARAGE: 950 sqft |
| OPENED PORCH (WITH ROOF) : 672 sqft |
| OPENED PORCH (WITH ROOF) : 106 sqft |
| Total Square Footage: 5017 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: (386)445-2012 |
| Location Address: 45 SCARLET OAK CIR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/19/2019 |
| NOC: RECORDED |
| Applicant name: JOHN DONALD GORDON |
| Owner: SMITH DAVID H & SUSAN F H&W |
|
Address 744 PONUS RIDGE RD NEW CANAAN, CT 06840 |
| Lot: 0620 |
| Contracted Stated Job Value: ¤416,597.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. Box 354786 Palm Coast, FL 32137 |
CGC062646 (Exp: 08/31/2020) | (386)445-2012 | (386)446-7928 |
Sub Contractors
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
GEORGE F AYLSWORTH JR
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
2680 S US HIGHWAY 17 CRESCENT CITY, FL 32112 |
00714 (Exp: 08/31/2021) | 386-698-1033 | 386-698-1077 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/26/2020 | FINAL APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 02/25/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: THIS IS A REINSPECTION lock out braker on wall ovens GFCI braker in bathrooms 210.8 A | |||
| ROW - FINAL APRON (AFTER POUR) | 02/24/2020 | APPROVED | RGROSS |
| BLD - BUILDING FINAL | 02/24/2020 | CANCELLED BY APPLICANT | JDELBONIS |
| GAS ROUGH | 02/24/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| GAS FINAL | 02/24/2020 | APPROVED | JGIBSON |
| ROW - STORMWATER FINAL | 02/24/2020 | APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 02/24/2020 | FINAL APPROVED | LFITZGERALD |
| FINAL SURVEY (OFFICE USE ONLY) | 02/21/2020 | Disapproved - NO FEE | RGROSS |
| Note: THIS IS A REINSPECTION. SEE ATTACHMENT FIELD SURVEY MARK-UP. LANDSCAPING IN THE EASEMENT ON THE RIGHT SIDE PROPERTY LINE MUST BE REMOVED. ALSO GRADE ELEVATIONS NEEDED ALONG THE RIGHT SIDE 10 FT FROM OFF BUILDING FOUNDATION ELEVATIONS. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/21/2020 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION. FINAL SURVEY DID HAVE THE ELEVATIONS ALONG THE LEFT PROPERTY LINE, NOT ORIGINALLY SEEN BY INSPECTOR. THIS SUB-DIVISION DOES NOT HAVE AN EASEMENT PER SUB PLAT. NO LANDSCAPING NEEDS REMOVED. THUS APPROVED AS-NOTED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/21/2020 | Disapproved - NO FEE | RGROSS |
| Note: SEE FIELD SURVEY MARK-UP | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/21/2020 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION. INSPECTOR LOOKED AT THE WRONG SURVEY WITH MISSING GRADE ELEVATIONS. THIS SUB-DIVISION HAS NO EASEMENTS PER PLAT. | |||
| U-CROSS CONNECTION | 02/20/2020 | APPROVED | LFITZGERALD |
| FINAL SURVEY (OFFICE USE ONLY) | 02/19/2020 | Disapproved - NO FEE | MMAJEWSKI |
| Note: ELEVATIONS ALONG FOUNDATION NEED TO BE A MINIMUM OF 4 INCHES BELOW F/F | |||
| U-CROSS CONNECTION | 02/06/2020 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 01/09/2020 | APPROVED - AS NOTED | RGROSS |
| Note: SECOND PART OF A PRE POUR. PAVERS AND BASE ON SITE. | |||
| GAS ROUGH | 01/09/2020 | PARTIALLY APPROVED | JGIBSON |
| Note: this was a partial inspection on gas line ran from tank to house, another gas rough and gas final can be scheduled at same time for next time | |||
| ROW- PRE-APRON (PRE-POUR) | 01/08/2020 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION | |||
| GAS ROUGH | 12/30/2019 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NO PLANS OR PAPER WORK POSTED AT TIME OF INSPECTION 1: 54, NO TEST ON GAS LINE. | |||
| ROW- PAVER RESTRAINTS | 12/06/2019 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 12/06/2019 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR CONCRETE APRON PLUS 30 FT. UPPER PART OF DRIVEWAY ARE PAVERS. PAVER RESTRAINTS APPROVED. | |||
| U - SEWER TIE IN | 11/06/2019 | APPROVED | MWILLIAMS |
| GRAVITY SEWER TEST | 11/06/2019 | APPROVED | MWILLIAMS |
| ELECTRIC - EARLY POWER | 10/09/2019 | APPROVED - AS NOTED | RMARTIN |
| GAS ROUGH | 09/11/2019 | APPROVED | JGIBSON |
| INSULATION | 08/27/2019 | APPROVED | MWILLIAMS |
| LATH/BRICK/ WATER BARRIER | 08/21/2019 | APPROVED | MWILLIAMS |
| ALL ROUGH | 08/15/2019 | APPROVED | DROCKWELL |
| ROOF VALLEY & METAL | 07/25/2019 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/18/2019 | APPROVED - AS NOTED | MWILLIAMS |
| Note: also checked sliding door for fastening at request of Builder. | |||
| WINDOW NAILING | 07/17/2019 | CANCELLED BY INSPECTOR | MWILLIAMS |
| Note: This inspection not required . Windows installed in CMU walls Windows are inspected at the all rough | |||
| ELECTRIC-TUG | 06/24/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: spoke to susan fpl released power 3:40 | |||
| TIE BEAM / LINTEL | 06/07/2019 | APPROVED | WMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 06/04/2019 | APPROVED | JMUNSON |
| ELEV CERT-FOUNDATION APPROVAL | 05/31/2019 | APPROVED | JMYERS |
| MONOLITHIC SLAB | 05/17/2019 | APPROVED | WMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/15/2019 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 02/20/2020 | 02/20/2020 |
| Note: Released By: JMYERS Final elevation certificate has been accepted | |||
| PLFM | COMPLETE | 02/18/2020 | 02/18/2020 |
| Note: Released By: JMYERS Final elevation certificate has been accepted | |||
| SW1 | COMPLETE | 05/31/2019 | 06/04/2019 |
| Note: Released By: JMUNSON Foundation S | |||
| PLFM | COMPLETE | 05/31/2019 | 05/31/2019 |
| Note: Released By: JMYERS The Building elevation certificate has been accepted. Please provide Final prior to receiving CO. | |||
| ZON | COMPLETE | 04/18/2019 | 04/18/2019 |
| Note: Released By: AMOBLEY | |||
| PLFM | COMPLETE | 04/15/2019 | 04/15/2019 |
| Note: Released By: JMYERS The Construction elevation certificate has been accepted, however future elevation certificates will need to be sealed with a Raised seal as well as signed and dated on top of the seal. Informational: the phone number listed on the elevation certificate is incorrect. | |||
| ZON | HOLD | 04/10/2019 | 04/10/2019 |
| Note: Held By: AMOBLEY Flood number not filled in on survey Please correct survey not site plan | |||
| PLFM | HOLD | 04/10/2019 | 04/11/2019 |
| Note: Held By: JMYERS Please turn a hard copy of the elevation certificate with the previous hold comments corrected. | |||
| MECH | COMPLETE | 04/10/2019 | 04/17/2019 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 04/10/2019 | 04/16/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 04/10/2019 | 04/16/2019 |
| Note: Released By: JHINDMAN | |||
| PLFM | HOLD | 04/04/2019 | 04/04/2019 |
| Note: Elevation certificates cannot be submitted electronically. A hard copy of the Construction, Building, and Final must be turned in. In Section A8. A, b, and c must have N/A you cannot leave them blank. A8. D must be check with yes or no. In Section A9. B and c must have N/A you cannot leave them blank or have a 0. B9 must read 8.0’ The hard copies must be signed and sealed with a raised seal. | |||
| BLD | HOLD | 04/03/2019 | 04/09/2019 |
| Note: Held By: JHINDMAN 1. Identify the lintel sizes and types on the floorplan 6th ed. FBC 107.3.5. | |||
| ELEC | HOLD | 04/03/2019 | 04/09/2019 |
| Note: Held By: JHINDMAN 1. provide electrical load calculationssigned by the electrical contractor with their license number. 6th ed. FBC 107.1. | |||
| ENGIN1 | COMPLETE | 04/03/2019 | 04/04/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 04/03/2019 | 04/03/2019 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 04/03/2019 | 04/09/2019 |
| Note: Held By: JHINDMAN 1. provide energy calculations per 6th ed. FBC EC R405. file marked energy has an elevation cert. | |||
| PLUM | COMPLETE | 04/03/2019 | 04/09/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 04/03/2019 | 04/09/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 04/03/2019 | 04/09/2019 |
| Note: Released By: AHALL Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 3.0’ on both sides and 4’ behind. | |||
| ZON | HOLD | 04/03/2019 | 04/04/2019 |
| Note: Held By: AMOBLEY Flood number not on survey Please correct survey |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 02/26/2020 |
| REINSPECTION FEE | ¤40.00 | 02/26/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤872.00 | 04/19/2019 |
| SITE PLAN 20 | ¤20.00 | 04/19/2019 |
| SURCHARGE FS 533.721 | ¤20.51 | 04/19/2019 |
| SURCHARGE - FS 468.631 | ¤30.77 | 04/19/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 04/19/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 04/19/2019 |
| ADMIN FEE | ¤20.00 | 04/19/2019 |
| ELECTRIC FEE | ¤321.60 | 04/19/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 04/19/2019 |
| IMPACT FEE FIRE | ¤223.38 | 04/19/2019 |
| IMPACT FEE PARKS | ¤849.24 | 04/19/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 04/19/2019 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 04/19/2019 |
| MECHANICAL FEE | ¤321.60 | 04/19/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 04/19/2019 |
| PLAN CHECK FEE | ¤174.40 | 04/19/2019 |
| PLUMBING FEE | ¤321.60 | 04/19/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,794.49 |