Permit #2019041096
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7037-00530-0050 |
| Block: 00530 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 386-227-2646 |
| Location Address: 70 LANGDON DR |
| Type: DR - DRIVEWAY |
| Issue Date: 06/18/2019 |
| NOC: Unknown |
| Applicant name: JUAN P BARTOLOME HERNANDEZ |
| Owner: MATOS REYNALDO & GLADYS H&W |
|
Address 70 LANGDON DRIVE PALM COAST, FL 32137 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤500.00 |
| Job Description: DRIVEWAY EXTENSION |
| Type: CN |
Contractor
A TOUCH OF SPAIN INC
| Status | Location Address | Phone |
| INACTIVE |
74 SEVEN WONDERS TRAIL , |
386-227-2646 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 09/18/2020 | FINAL APPROVED | JHARDING |
| ROW - FINAL INSPECTION | 09/01/2020 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 12/06/2019 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 07/23/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 07/01/2019 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: THE PIPE EXTENSIONS HAVE TO BE THE SAME SIZE AS THE EXISTING CULVERT PIPE AND HAVE A GASKET AND PIPE CLAMP. THE PIPE MITER OPENING IS REQUIRED TO BE 3 FEET LONG. THE MITERED ENDS FORMS ARE REQUIRED TO BE 18" FROM THE EDGE OF THE PIPE AT THE TOP AND 9" FROM THE EDGE OF THE PIPE ON THE BOTTOM |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 05/30/2019 | 05/30/2019 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 05/30/2019 | 06/04/2019 |
| Note: Released By: TBAKER | |||
| UD1 | COMPLETE | 05/30/2019 | 06/04/2019 |
| Note: Released By: AHALL | |||
| SW1 | COMPLETE | 05/30/2019 | 05/31/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | HOLD | 05/29/2019 | 05/29/2019 |
| Note: Held By: TDOAK REPEAT COMMENT: Also, plans must state the type of material to be used to extend the driveway. | |||
| ZON | HOLD | 05/28/2019 | 05/29/2019 |
| Note: Held By: TDOAK Also, plans must state the type of material to be used to extend the driveway. | |||
| ENGIN1 | COMPLETE | 04/25/2019 | 04/26/2019 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 04/25/2019 | 04/29/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 04/25/2019 | 04/30/2019 |
| Note: Released By: AHALL All Concrete, Driveways, Pavers, Pools / Sidewalks ETC. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind. | |||
| ZON | HOLD | 04/25/2019 | 04/25/2019 |
| Note: Held By: TDOAK Please clarify scope of work. The application states extend driveway 2' but the site plan looks like there may be 2' added on both sides of existing driveway - totalling 4'. This must be clear. Also, plans must state the type of material to be used to extend the driveway. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/17/2020 |
| SITE PLAN 20 | ¤20.00 | 06/18/2019 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/18/2019 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/18/2019 |
| STORM WATER PERMIT FEES | ¤40.00 | 06/18/2019 |
| ADMIN FEE | ¤20.00 | 06/18/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤124.00 |