Permit #2019041117
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7008-00090-0480 |
| Block: 00090 |
| Subdivision: 2204 - SECTION 8-COUNTRY CLUB COVE |
| Job Phone: 386-586-8265 |
| Location Address: 40 COURTNEY PL |
| Type: DR - DRIVEWAY |
| Issue Date: 05/14/2019 |
| NOC: Unknown |
| Applicant name: PATRICIA BARTON |
| Owner: KALABOKES STEVEN & JOANNE H&W |
|
Address 40 COURTNEY PL PALM COAST, FL 32137 |
| Lot: 0480 |
| Contracted Stated Job Value: ¤2,485.00 |
| Job Description: REMOVE AND REPLACE CONCRETE DRIVEWAY W/3'X16' EXTENSION |
| Type: CN |
Contractor
PRECISION CONCRETE OF PALM COAST INC
| Status | Location Address | Phone | Fax |
| INACTIVE |
PO BOX 351897 PALM COAST, FL 32137 |
386-586-8265 | 386-262-1245 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL INSPECTION | 07/23/2019 | APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 07/23/2019 | FINAL APPROVED | JNICHOLS |
| ROW - FINAL APRON (AFTER POUR) | 07/22/2019 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 05/30/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/25/2019 | 04/29/2019 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 04/25/2019 | 04/25/2019 |
| Note: Released By: RLEE | |||
| UD1 | COMPLETE | 04/25/2019 | 05/01/2019 |
| Note: Released By: AHALL All Concrete, Driveways, Pavers, Pools / Sidewalks ETC. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind. | |||
| ZON | COMPLETE | 04/25/2019 | 04/26/2019 |
| Note: Released By: TDOAK |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMIN FEE | ¤20.00 | 05/14/2019 |
| SITE PLAN 20 | ¤20.00 | 05/14/2019 |
| SURCHARGE FS 533.721 | ¤2.00 | 05/14/2019 |
| SURCHARGE - FS 468.631 | ¤2.00 | 05/14/2019 |
| STORM WATER PERMIT FEES | ¤40.00 | 05/14/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤84.00 |