Permit #2019050448
Permit Details
Status: COED
| Parcel Id: 06-12-31-5825-00000-0220 |
| Total Square Footage: 113873 sqft |
| Block: 00000 |
| Subdivision: 2304 - CENTRAL LANDINGS APARTMENTS AT TOWN CENTER |
| Location Address: 7000 COASTAL TRCE BLDG 5 |
| Type: BM - BUILDING MULTI - APARTMENT |
| Issue Date: 08/20/2019 |
| NOC: RECORDED |
| Applicant name: WILLIAM SCOTT CULP |
| Owner: CENTRAL LANDINGS PARTNERS LTD & CENTRAL LANDINGS 8 |
|
Address 335 N KNOWLES AVE STE 101 WINTER PARK, FL 32789 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤7,898,507.00 |
| Job Description: BLDG #5 - 83 UNIT MULTIFAMILY APARTMENT - CENTRAL LANDINGS |
| Type: CN |
Contractor
WPGC CONSTRUCTIONI, LLC
| Status | Location Address | Mailing Address | State License Number |
| CANCEL |
200 EAST CANTON AVE , |
STE 102 WINTER PARK, FL 32789 |
CGC1524369 (Exp: 08/31/2022) |
Sub Contractors
RANCE F BORDERICK
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
430 WEST DRIVE ALTAMONTE SPRINGS, FL 32714 |
EC0000981 (Exp: 08/31/2026) | (407)788-3500 | 407-788-2007 |
DAVID A CROSON
| Status | Location Address | State License Number | Phone |
| CANCEL |
31550 COUNTY ROAD 437 SORRENTO, FL 32776 |
CFC1426109 (Exp: 08/31/2022) | 352-729-7100 |
JOHN MAXEN BARTKOVICH
| Status | Location Address | State License Number | Phone |
| ACTIVE |
818 SHADOWMOSS DR WINTERGARDEN, FL 32787 |
CAC1815793 (Exp: 08/31/2026) | 407-886-3729 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
Inspection History
| Type | Request Date | Result | Inspector |
| BUILDING FINAL | 04/20/2020 | Approval - Private Provider | PPROVIDER |
| Note: Sections A and B | |||
| FIRE FINAL | 04/20/2020 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Building #5 7000 Coastal Trace • The clubhouse is address 7106 • The unit addresses are o First floor units: 7107 – 7112 o Second floor units: 7213 – 7224 o Third floor units: 7313 – 7324 o Fourth floor units: 7413 - 7424 Need exit signs as discussed and clubhouse not ready. Must make alarm and life safety ready prior as discussed. Sections above only 4/15/2020 remaining corridoors checked (still need to patch holes in cielings and walls in units and garages, need to remove paint protectors from sprink;lers) (Elevator must be approved and in service prior to fire final) (need to remove combustibles from Balconies, Porches, and Aprons) | |||
| FIRE FINAL | 04/15/2020 | PARTIALLY APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Building #5 7000 Coastal Trace • The clubhouse is address 7106 • The unit addresses are o First floor units: 7107 – 7112 o Second floor units: 7213 – 7224 o Third floor units: 7313 – 7324 o Fourth floor units: 7413 - 7424 Need exit signs as discussed and clubhouse not ready. Must make alarm and life safety ready prior as discussed. Sections above only 4/15/2020 remaining corridoors checked (still need to patch holes in cielings and walls in units and garages, need to remove paint protectors from sprink;lers) (Elevator must be approved and in service prior to fire final) (need to remove combustibles from Balconies, Porches, and Aprons) | |||
| U - UTILITY COMMERCIAL FINAL | 04/14/2020 | APPROVED | AHALL |
| Note: THIS IS A REINSPECTION stage 2 bldgs 5 and 11 Building #5 7000 Coastal Trace • The clubhouse is address 7106 • The unit addresses are o First floor units: 7107 – 7112 o Second floor units: 7213 – 7224 o Third floor units: 7313 – 7324 o Fourth floor units: 7413 - 7424 | |||
| PLUMBING FINAL | 04/13/2020 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 04/13/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 04/09/2020 | Approval - Private Provider | PPROVIDER |
| Note: Building 5 Section B electric finals | |||
| HVAC FINAL | 04/08/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING FINAL | 04/08/2020 | Approval - Private Provider | PPROVIDER |
| FIRE FINAL | 04/01/2020 | PARTIALLY APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION Building #5 7000 Coastal Trace • The clubhouse is address 7106 • The unit addresses are o First floor units: 7107 – 7112 o Second floor units: 7213 – 7224 o Third floor units: 7313 – 7324 o Fourth floor units: 7413 - 7424 Need exit signs as discussed and clubhouse not ready. Must make alarm and life safety ready prior as discussed. Sections above only | |||
| BUILDING FINAL | 04/01/2020 | Approval - Private Provider | PPROVIDER |
| Note: Buildiing 5 - Section B & C - all units. | |||
| FIRE FINAL | 03/31/2020 | Disapproved - NO FEE | WMILLER |
| Note: Building #5 7000 Coastal Trace • The clubhouse is address 7106 • The unit addresses are o First floor units: 7107 – 7112 o Second floor units: 7213 – 7224 o Third floor units: 7313 – 7324 o Fourth floor units: 7413 - 7424 Need exit signs as discussed and clubhouse not ready. Must make alarm and life safety ready prior as discussed. | |||
| U - UTILITY COMMERCIAL FINAL | 03/31/2020 | PARTIALLY APPROVED | AHALL |
| Note: stage 2 bldgs 5 and 11 Building #5 7000 Coastal Trace • The clubhouse is address 7106 • The unit addresses are o First floor units: 7107 – 7112 o Second floor units: 7213 – 7224 o Third floor units: 7313 – 7324 o Fourth floor units: 7413 - 7424 | |||
| BUILDING FINAL | 03/31/2020 | Approval - Private Provider | PPROVIDER |
| Note: Units 1st floor - 7101 - 7112 2nd floor - 7213 - 7224 3rd floor - 7313 - 7324 4th floor - 7413 - 7424 | |||
| FINAL SURVEY (COMM - OFFICE USE ONLY) | 03/31/2020 | APPROVED | BBEMBRY |
| FLOOR/WALL PENETRATION | 03/30/2020 | Approval - Private Provider | PPROVIDER |
| FIREWALL FINAL | 03/26/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 1ST ROUGH | 03/23/2020 | Approval - Private Provider | PPROVIDER |
| Note: THIS IS A REINSPECTION ADDED ON 3/19/2020 3:37:30 PM | |||
| ELECTRIC 1ST ROUGH | 03/19/2020 | Disapproved- Private Provider | PPROVIDER |
| ELECTRIC FINAL | 03/19/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 03/19/2020 | Approval - Private Provider | PPROVIDER |
| INSULATION | 03/19/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 03/18/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 2ND ROUGH | 03/18/2020 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 03/18/2020 | Approval - Private Provider | PPROVIDER |
| HVAC ROUGH | 03/18/2020 | Approval - Private Provider | PPROVIDER |
| HVAC ROUGH | 03/18/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING 2ND ROUGH | 03/18/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING FINAL | 03/18/2020 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 03/16/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 03/16/2020 | Approval - Private Provider | PPROVIDER |
| Note: building 5 - fooors 2 - 4 elec final | |||
| ELECTRIC - EARLY POWER | 03/11/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 03/11/2020 | Approval - Private Provider | PPROVIDER |
| Note: Building 5 - A section 7000 Coastal Trace 7 101 - 7 104 7 201 - 7 208 7 301 - 7 308 7 401 - 7 408 | |||
| ELECTRIC - EARLY POWER | 03/06/2020 | Approval - Private Provider | PPROVIDER |
| Note: 7000 Coastal Trace 7-105 7-106 7-107 7-108 7-209 7-210 7-211 7-212 7-213 7-214 7-215 7-216 7-309 7-310 7-311 7-312 7-313 7-314 7-315 7-316 7-409 7-410 7-411 7-412 7-413 7-414 7-415 7-416 | |||
| FIREWALL | 02/24/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 02/19/2020 | Approval - Private Provider | PPROVIDER |
| INSULATION | 02/19/2020 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 02/19/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 02/18/2020 | Approval - Private Provider | PPROVIDER |
| Note: Section C - prepower | |||
| ELECTRIC 2ND ROUGH | 02/18/2020 | Disapproved- Private Provider | PPROVIDER |
| ELECTRIC 2ND ROUGH | 02/18/2020 | Approval - Private Provider | PPROVIDER |
| Note: Section A - 1st floor | |||
| ELECTRIC 2ND ROUGH | 02/17/2020 | Approval - Private Provider | PPROVIDER |
| Note: THIS IS A REINSPECTION | |||
| HVAC ROUGH | 02/17/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING 2ND ROUGH | 02/17/2020 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 02/17/2020 | Approval - Private Provider | PPROVIDER |
| INSULATION | 02/17/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 02/17/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 02/14/2020 | Approval - Private Provider | PPROVIDER |
| ABOVE CEILING | 02/14/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING 2ND ROUGH | 02/14/2020 | Approval - Private Provider | PPROVIDER |
| HVAC ROUGH | 02/14/2020 | Approval - Private Provider | PPROVIDER |
| HVAC ROUGH | 02/12/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING 2ND ROUGH | 02/12/2020 | Approval - Private Provider | PPROVIDER |
| ABOVE CEILING | 02/12/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 02/12/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 2ND ROUGH | 02/11/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC TEMP POLE | 02/10/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC TEMP POLE | 02/10/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 2ND ROUGH | 02/10/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING 2ND ROUGH | 02/10/2020 | Approval - Private Provider | PPROVIDER |
| HVAC ROUGH | 02/10/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 02/10/2020 | Approval - Private Provider | PPROVIDER |
| ABOVE CEILING | 02/10/2020 | Approval - Private Provider | PPROVIDER |
| ABOVE CEILING | 02/06/2020 | Approval - Private Provider | PPROVIDER |
| Note: building 5, section A 4th floor | |||
| SHEARWALL | 02/06/2020 | Approval - Private Provider | PPROVIDER |
| Note: Section B - 1st floor (excludes clubhouse and adjacent garage) Section C elevator RC channell Inspection | |||
| FRAMING | 02/06/2020 | Approval - Private Provider | PPROVIDER |
| Note: Section A 4th floor | |||
| HVAC ROUGH | 02/06/2020 | Approval - Private Provider | PPROVIDER |
| Note: Section A - 4th floor | |||
| PLUMBING 2ND ROUGH | 02/06/2020 | Approval - Private Provider | PPROVIDER |
| Note: Section A 4th floor | |||
| ELECTRIC 2ND ROUGH | 02/06/2020 | Approval - Private Provider | PPROVIDER |
| Note: sectino A - 4th floor 2nd rough elec | |||
| ELECTRIC 2ND ROUGH | 02/03/2020 | Approval - Private Provider | PPROVIDER |
| Note: bldg 5 section b 1st floor 2nd rough elec | |||
| ELECTRIC 2ND ROUGH | 02/03/2020 | Approval - Private Provider | PPROVIDER |
| Note: section b 1st floor 2nd rough elec | |||
| FRAMING | 02/03/2020 | Approval - Private Provider | PPROVIDER |
| Note: building 5, section b 2nd floor | |||
| FRAMING | 02/03/2020 | Approval - Private Provider | PPROVIDER |
| Note: Building 5, section B 1st floor RC and insulation 2nd floor drywall screw | |||
| SHEARWALL | 02/03/2020 | Approval - Private Provider | PPROVIDER |
| Note: Building 5, section B 1st floor RC and insulation 2nd floor drywall screw | |||
| INSULATION | 02/03/2020 | Approval - Private Provider | PPROVIDER |
| Note: Building 5, section B 1st floor RC and insulation 2nd floor drywall screw | |||
| INSULATION | 01/30/2020 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 01/30/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 01/30/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 2ND ROUGH | 01/30/2020 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER | 01/30/2020 | APPROVED | JGIBSON |
| BLD - SEWER TIE IN | 01/30/2020 | APPROVED | JGIBSON |
| PLUMBING 2ND ROUGH | 01/29/2020 | Approval - Private Provider | PPROVIDER |
| HVAC FINAL | 01/29/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 1ST ROUGH | 01/29/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 01/29/2020 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 01/29/2020 | Approval - Private Provider | PPROVIDER |
| INSULATION | 01/29/2020 | Approval - Private Provider | PPROVIDER |
| ABOVE CEILING | 01/29/2020 | Approval - Private Provider | PPROVIDER |
| ABOVE CEILING | 01/29/2020 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 01/27/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 1ST ROUGH | 01/27/2020 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 2ND ROUGH | 01/24/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING 2ND ROUGH | 01/24/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH | 01/24/2020 | Approval - Private Provider | JMONTARULI |
| HVAC ROUGH | 01/24/2020 | Approval - Private Provider | JMONTARULI |
| HVAC ROUGH | 01/24/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 01/24/2020 | Approval - Private Provider | JMONTARULI |
| FRAMING | 01/24/2020 | Approval - Private Provider | JMONTARULI |
| FRAMING | 01/24/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 01/24/2020 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 01/24/2020 | Approval - Private Provider | JMONTARULI |
| SHEARWALL | 01/24/2020 | Approval - Private Provider | PPROVIDER |
| FLOOR/WALL PENETRATION | 01/24/2020 | Approval - Private Provider | PPROVIDER |
| INSULATION | 01/24/2020 | Approval - Private Provider | JMONTARULI |
| INSULATION | 01/24/2020 | Approval - Private Provider | PPROVIDER |
| INSULATION | 01/24/2020 | Approval - Private Provider | PPROVIDER |
| ABOVE CEILING | 01/24/2020 | Approval - Private Provider | JMONTARULI |
| ABOVE CEILING | 01/24/2020 | Approval - Private Provider | PPROVIDER |
| INSULATION | 01/16/2020 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 01/16/2020 | Approval - Private Provider | PPROVIDER |
| Note: Section A - pre rock screw Section C 1st floor drywall screw | |||
| FRAMING | 01/16/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 01/16/2020 | Approval - Private Provider | PPROVIDER |
| HVAC ROUGH | 01/16/2020 | Approval - Private Provider | PPROVIDER |
| Note: Section A AHU and Damper | |||
| PLUMBING 2ND ROUGH | 01/16/2020 | Approval - Private Provider | PPROVIDER |
| Note: building 5 section B 2nd rough 3rd and 4th floor | |||
| SHEARWALL | 01/15/2020 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 01/13/2020 | AUDIT - PRIVATE PROVIDER INSPECTION | PPROVIDER |
| SHEARWALL | 01/13/2020 | Approval - Private Provider | PPROVIDER |
| INSULATION | 01/13/2020 | Approval - Private Provider | PPROVIDER |
| INSULATION | 01/13/2020 | Approval - Private Provider | PPROVIDER |
| INSULATION | 01/13/2020 | Approval - Private Provider | PPROVIDER |
| ABOVE CEILING | 01/13/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING 2ND ROUGH | 01/13/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING 2ND ROUGH | 01/13/2020 | Approval - Private Provider | PPROVIDER |
| HVAC ROUGH | 01/13/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 01/13/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 01/13/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 01/08/2020 | Approval - Private Provider | PPROVIDER |
| HVAC ROUGH | 01/08/2020 | Approval - Private Provider | PPROVIDER |
| PLUMBING 2ND ROUGH | 01/08/2020 | Approval - Private Provider | PPROVIDER |
| INSULATION | 01/08/2020 | Approval - Private Provider | PPROVIDER |
| ABOVE CEILING | 01/06/2020 | Approval - Private Provider | PPROVIDER |
| ABOVE CEILING | 01/06/2020 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACE / TIE DOWN | 01/06/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 01/06/2020 | Approval - Private Provider | PPROVIDER |
| FRAMING | 01/06/2020 | Approval - Private Provider | PPROVIDER |
| Note: 3rd flooring | |||
| ELECTRIC 1ST ROUGH | 01/02/2020 | Approval - Private Provider | PPROVIDER |
| EXTERIOR WALL SHEATHING / SHEARWALL | 12/31/2019 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 12/31/2019 | Approval - Private Provider | PPROVIDER |
| ABOVE CEILING | 12/30/2019 | Approval - Private Provider | PPROVIDER |
| HVAC ROUGH | 12/27/2019 | Approval - Private Provider | PPROVIDER |
| FRAMING | 12/27/2019 | Approval - Private Provider | PPROVIDER |
| FRAMING | 12/26/2019 | Approval - Private Provider | PPROVIDER |
| HVAC ROUGH | 12/26/2019 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 12/23/2019 | Approval - Private Provider | PPROVIDER |
| EXTERIOR STRAP/CLIP | 12/20/2019 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 1ST ROUGH | 12/20/2019 | Approval - Private Provider | PPROVIDER |
| FRAMING | 12/20/2019 | Approval - Private Provider | PPROVIDER |
| COLUMN | 12/19/2019 | Approval - Private Provider | PPROVIDER |
| INSULATION | 12/19/2019 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACE / TIE DOWN | 12/18/2019 | Approval - Private Provider | PPROVIDER |
| COLUMN | 12/18/2019 | Approval - Private Provider | PPROVIDER |
| FRAMING | 12/16/2019 | Approval - Private Provider | PPROVIDER |
| FRAMING | 12/16/2019 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 12/16/2019 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 12/16/2019 | Approval - Private Provider | PPROVIDER |
| EXTERIOR STRAP/CLIP | 12/16/2019 | Approval - Private Provider | PPROVIDER |
| FRAMING | 12/12/2019 | Approval - Private Provider | PPROVIDER |
| FRAMING | 12/12/2019 | Approval - Private Provider | PPROVIDER |
| HVAC ROUGH | 12/12/2019 | Approval - Private Provider | PPROVIDER |
| FRAMING | 12/11/2019 | Approval - Private Provider | PPROVIDER |
| COLUMN | 12/11/2019 | Approval - Private Provider | PPROVIDER |
| FRAMING | 12/09/2019 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 12/09/2019 | Approval - Private Provider | PPROVIDER |
| EXTERIOR STRAP/CLIP | 12/09/2019 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 12/09/2019 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACE / TIE DOWN | 12/09/2019 | Approval - Private Provider | PPROVIDER |
| EXTERIOR WALL SHEATHING / SHEARWALL | 12/09/2019 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 12/02/2019 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 11/25/2019 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 11/25/2019 | Approval - Private Provider | PPROVIDER |
| SECOND FLOOR SLAB | 11/13/2019 | Approval - Private Provider | MATT |
| SECOND FLOOR SLAB | 11/06/2019 | Approval - Private Provider | PPROVIDER |
| FOOTER | 11/06/2019 | Approval - Private Provider | PPROVIDER |
| LINTEL | 11/06/2019 | Approval - Private Provider | PPROVIDER |
| FOUNDATION SURVEY - OFFICE USE ONLY | 11/06/2019 | APPROVED | JMUNSON |
| SHEARWALL | 11/06/2019 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 10/31/2019 | Approval - Private Provider | PPROVIDER |
| LINTEL | 10/31/2019 | Approval - Private Provider | PPROVIDER |
| COLUMN | 10/30/2019 | Approval - Private Provider | PPROVIDER |
| LINTEL | 10/30/2019 | Approval - Private Provider | PPROVIDER |
| SHEARWALL | 10/30/2019 | Approval - Private Provider | PPROVIDER |
| LINTEL | 10/25/2019 | Approval - Private Provider | MDEFREITAS |
| COLUMN | 10/25/2019 | Approval - Private Provider | MDEFREITAS |
| COLUMN | 10/24/2019 | Approval - Private Provider | MDEFREITAS |
| MONOLITHIC SLAB | 10/24/2019 | Approval - Private Provider | MDEFREITAS |
| EXTERIOR WALL SHEATHING / SHEARWALL | 10/24/2019 | Approval - Private Provider | MDEFREITAS |
| MONOLITHIC SLAB | 10/23/2019 | Approval - Private Provider | PPROVIDER |
| Note: Building 5 Section A - mono slab approved | |||
| MONOLITHIC SLAB | 10/23/2019 | Approval - Private Provider | PPROVIDER |
| Note: bulding 5 section b2 | |||
| ELECTRIC 1ST ROUGH | 10/23/2019 | Approval - Private Provider | PPROVIDER |
| Note: building 5 section b2 | |||
| ELECTRIC 1ST ROUGH | 10/23/2019 | Approval - Private Provider | PPROVIDER |
| Note: Building 5 Section A | |||
| MONOLITHIC SLAB | 10/15/2019 | APPROVED | PPROVIDER |
| MONOLITHIC SLAB | 10/09/2019 | Approval - Private Provider | PPROVIDER |
| ELECTRIC 1ST ROUGH | 10/09/2019 | APPROVED | PPROVIDER |
| PLUMBING 1ST ROUGH | 10/09/2019 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH | 10/07/2019 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH | 10/03/2019 | Approval - Private Provider | PPROVIDER |
| Note: Building 5 Section C - underground plumbing | |||
| LINTEL | 10/02/2019 | Approval - Private Provider | PPROVIDER |
| Note: partial lintel down cell | |||
| LINTEL | 10/01/2019 | Approval - Private Provider | PPROVIDER |
| Note: lintel down cell top passed - built to detail 5 & 6 A1.4 | |||
| LINTEL | 09/27/2019 | Approval - Private Provider | PPROVIDER |
| Note: Section A - 3rd lift elevator | |||
| LINTEL | 09/26/2019 | Approval - Private Provider | PPROVIDER |
| Note: Building 5 section A | |||
| LINTEL | 09/26/2019 | Approval - Private Provider | PPROVIDER |
| Note: Building 5 elevator top out C , stairs top out B | |||
| LINTEL | 09/25/2019 | Approval - Private Provider | PPROVIDER |
| Note: building 5 Section A - 3rd lift stair tower rebar and masonrr | |||
| ELECTRIC 1ST ROUGH | 09/25/2019 | Approval - Private Provider | PPROVIDER |
| Note: West entrance crossing underground electric across road inspection | |||
| LINTEL | 09/20/2019 | Approval - Private Provider | PPROVIDER |
| LINTEL | 09/19/2019 | Approval - Private Provider | PPROVIDER |
| LINTEL | 09/18/2019 | Approval - Private Provider | PPROVIDER |
| LINTEL | 09/18/2019 | Approval - Private Provider | PPROVIDER |
| FOOTER | 09/11/2019 | Approval - Private Provider | PPROVIDER |
| Note: Building 5, east and west stair enclosures, grade to 2nd floor - rebar okay - passed. Elevator enclosure grade to 2nd floor okay - passed. | |||
| FOOTER | 09/11/2019 | Approval - Private Provider | PPROVIDER |
| Note: Building 5 - stair tower/ CMU inspection passed. | |||
| FOOTER | 09/11/2019 | Approval - Private Provider | PPROVIDER |
| Note: building 5 - elevator pit wall steel and forms inspection passed. | |||
| FOOTER | 08/26/2019 | Approval - Private Provider | PPROVIDER |
| Note: Stair tower stem wall and elevator pit footing steel inspection |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/26/2020 | 03/31/2020 |
| Note: Released By: PBUCKLEY | |||
| ENGIN1 | COMPLETE | 03/26/2020 | 03/31/2020 |
| Note: Released By: CMORALES | |||
| SW1 | COMPLETE | 11/04/2019 | 11/06/2019 |
| Note: Released By: JMUNSON | |||
| BLD | COMPLETE | 08/01/2019 | 08/02/2019 |
| Note: Released By: JHINDMAN | |||
| DSD | COMPLETE | 07/16/2019 | 07/16/2019 |
| Note: Released By: JGONZALEZ | |||
| ARCHR | COMPLETE | 07/16/2019 | 07/22/2019 |
| Note: Released By: BDAWSON | |||
| UD1 | COMPLETE | 07/16/2019 | 07/17/2019 |
| Note: Released By: CJOHNSON | |||
| MECH | COMPLETE | 07/16/2019 | 07/23/2019 |
| Note: Released By: MGARRETT | |||
| PLUM | COMPLETE | 07/16/2019 | 07/30/2019 |
| Note: Released By: MGARRETT | |||
| BLD | HOLD | 07/16/2019 | 07/29/2019 |
| Note: Held By: JHINDMAN On page S5.1 Identify the anchorage for the truss to wall connectors as plans do not specify the uplift at the truss locations per 6th ed. FBC 2303.4.4. 2. page 3/s8.2 identify the truss to header anchor. | |||
| ARCHR | HOLD | 05/09/2019 | 05/10/2019 |
| Note: Held By: BDAWSON Provide exterior elevations with colors called out. | |||
| BLD | HOLD | 05/09/2019 | 05/23/2019 |
| Note: Held By: JHINDMAN On page S5.1 Identify the anchorage for the truss to wall connectors as plans do not specify the uplift at the truss locations per 6th ed. FBC 2303.4.4. 2. page 3/s8.2 identify the truss to header anchor. | |||
| DSD | HOLD | 05/09/2019 | 05/10/2019 |
| Note: Held By: DRAMIREZ 1. Development Order for the site must be issued prior to issuance of permit. 2. Addresses must be established and all permits must reflect the new address prior to issuance of permit. 3. Amendment to the Innovation District incentives must be approved so they can be applied to the permit prior to issuance. 4. Site Development permit must be ready for issuance prior to issuance of the Commercial Building permit. | |||
| ELEC | COMPLETE | 05/09/2019 | 05/23/2019 |
| Note: Released By: JHINDMAN | |||
| FI1 | COMPLETE | 05/09/2019 | 05/23/2019 |
| Note: Released By: JHINDMAN | |||
| MECH | HOLD | 05/09/2019 | 05/23/2019 |
| Note: Held By: RLEE Provide rated dampers at exhaust in exterior rated walls. | |||
| PLUM | HOLD | 05/09/2019 | 05/23/2019 |
| Note: Held By: RLEE Provide plumbing risers for all four floors | |||
| UD1 | HOLD | 05/09/2019 | 05/22/2019 |
| Note: Held By: CJOHNSON Show dimensions on the meter room. Show room dimensions, height the meters will be off floor, spacing between meters. Refer to City of Palm Coast meter room detail W-15A for required items to include. Installation will require external antenna. Sensus may be able to help with required accessories. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 02/05/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 02/05/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤556.22) | 08/20/2019 |
| IMPACT FEE FIRE | ¤18,540.54 | 08/20/2019 |
| IMPACT FEE PARKS | ¤70,486.92 | 08/20/2019 |
| IMPACT FEE TRANSPORTATION | ¤142,594.00 | 08/20/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤2,114.61) | 08/20/2019 |
| PLAN CHECK FEE | ¤9,083.29 | 08/20/2019 |
| SURCHARGE FS 533.721 | ¤578.99 | 08/20/2019 |
| SURCHARGE - FS 468.631 | ¤868.49 | 08/20/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤4,277.82) | 08/20/2019 |
| ADMIN COMMERCIAL | ¤60.00 | 08/20/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤235,343.58 |