I want to search for...

Permit #2019050848

Permit Details

Status: COED

Parcel Id: 07-11-31-7030-00310-0310
CONDITIONED SPACE: 1983 sqft
GARAGE: 516 sqft
OPENED PORCH (WITH ROOF) : 106 sqft
OPENED PORCH (WITH ROOF) : 48 sqft
Total Square Footage: 2653 sqft
Block: 00310
Subdivision: 2154 - SECTION 30-ROYAL PALMS
Job Phone: 407-307-4753
Location Address: 72 RADCLIFFE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/31/2019
NOC: RECORDED
Applicant name: SHAWN VIRAG
Owner: BRITE PROPERTIES OF FLORIDA

Address

7345 GREENBRIAR PKWY

ORLANDO , FL 32819

Lot: 0310
Contracted Stated Job Value: ¤135,076.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SHAWNTELLE CONSULTING AND DESIGN LLC
Status Location Address State License Number Phone
CANCEL

611 LARGOVISTA DR

OAKLAND, FL 34787

CBC1261160 (Exp: 08/31/2020) 407-307-4753

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/27/2020 APPROVED FWILLIS
U -UTILITY RESIDENTIAL FINAL 02/27/2020 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 02/26/2020 APPROVED MMAJEWSKI
ROW FIELD SURVEY /GRADING CERTIFICATION 02/26/2020 APPROVED MMAJEWSKI
ROW - STORMWATER FINAL 02/26/2020 APPROVED MMAJEWSKI
FINAL SURVEY (OFFICE USE ONLY) 02/26/2020 APPROVED MMAJEWSKI
ELECTRIC - EARLY POWER 02/24/2020 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 9:50
ELECTRIC - EARLY POWER 02/21/2020 Disapproved -FEE REQUIRED JMUNSON
Note: Not allowed to have power hooked up or on in house before early power inspection
ROW- PRE-APRON (PRE-POUR) 01/23/2020 APPROVED - AS NOTED MMAJEWSKI
Note: IT IS THE BUILDER’S RESPONSIBILITY: TO RECHECK ELEVATIONS AND PIPE SIZE, TO INSURE THAT AN OBSTRUCTION DOES NOT EXIST UPSTREAM AND OR DOWNSTREAM, THAT THE CULVERT PIPE IS SET TO AND OR FOLLOWS THE SWALE PLAN, FORM THE DRIVEWAY TO THE APPROVEDSITE PLAN AND FOLLOW THE APPROVED DRIVEWAY DETAIL SHEET PROVIDED BY THE CITY OF PALM COAST. PRIOR TO PLACEMENT OF CONCRETE MATERIAL NEEDS TO BE COMPACTED
U - SEWER TIE IN 01/17/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 01/17/2020 APPROVED JGIBSON
LATH/BRICK/ WATER BARRIER 12/23/2019 APPROVED JDELBONIS
PEP TANK INSTALLATION REQUEST 12/20/2019 APPROVED CSTONE
ALL ROUGH 12/17/2019 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION
INSULATION 12/17/2019 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION
INSULATION 12/16/2019 Disapproved -FEE REQUIRED WMILLER
Note: THIS IS A REINSPECTION THE FOLLOWING WAS REQUESTED PRIOR BY INSPECTOR FW AND HAS NOT BEEN RESOLVED Right side of SLIDING GLASS DOOR approved Rated Fire caulk needed. Currently filled with Non-Rated Insulation. ALSO... MISSING NAILS IN 2X12 HEADER REQUESTED AT ROOF SHEATHING BRACES TIES DOWN CELLS HAS NOT BEEN CORRECTED
ALL ROUGH 12/16/2019 Disapproved - NO FEE WMILLER
Note: THIS IS A REINSPECTION THO FOLOWING WAS REQUESTED PRIOR BY INSPECTOR FW, STILL NOT RESOLVED Maintain 5' of Head Pressure as required.
INSULATION 12/11/2019 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION Item still not addressed: Right side of SGD (marked in green) at the top needs approved Fire Rated Caulking not insulation.
ALL ROUGH 12/11/2019 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION Nothing addresed from the previous inspection; Electrical panel needs Phasing Nail Guards missing in Kitchen area Maintain 5' of Head Pressure as required. Everything is marked on the floor in Green.
ALL ROUGH 12/09/2019 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION Nail Guards still missing in Kitchenn area, Wall side and Island side. Protect pipes. Hole in floor needs to be filled in.
INSULATION 12/09/2019 Disapproved - NO FEE FWILLIS
Note: Right side of SGD approved Rated Fire caulk needed. Currently filled with Non-Rated Insulation.
ALL ROUGH 12/06/2019 Disapproved -FEE REQUIRED FWILLIS
Note: Electrical Panel not Phased out. Nail guard missing in kitchen area. Maintain 5' of head pressure as required.
ROOF VALLEY & METAL 11/25/2019 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/21/2019 APPROVED - AS NOTED FWILLIS
Note: Hangers at the 2X12 Header missing nails. Will Inspect at All Rough.
ELECTRIC-TUG 11/21/2019 APPROVED - AS NOTED RMARTIN
Note: MAILED FPL RELEASED POWER 5:15
ELECTRIC-TUG 11/15/2019 Disapproved -FEE REQUIRED RMARTIN
Note: PVC NOT CONNECTED TO MA. AT SERVICE NEC 2014 ART 352.48 STILL SAME AS LAST INSPECTION
ELECTRIC-TUG 11/08/2019 Disapproved -FEE REQUIRED RMARTIN
Note: PVC NOT CONNECTED TO MA. NEC 2014 ART 352.48
TIE BEAM / LINTEL 11/07/2019 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 11/05/2019 APPROVED JMUNSON
MONOLITHIC SLAB 10/11/2019 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 10/09/2019 Disapproved -FEE REQUIRED JDELBONIS
Note: sides washed in covering rebar need to clean out and get 12 inches compated soil 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE… R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE… R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE
PLUMBING 1ST ROUGH UNDERGROUND 10/07/2019 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 08/28/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
SW1 COMPLETE 11/05/2019 11/05/2019
Note: Released By: JMUNSON Foundation Survey
SWALE COMPLETE 06/12/2019 07/11/2019
Note: Released By: TBAKER
ENGIN1 COMPLETE 06/10/2019 06/12/2019
Note: Released By: TBAKER
ZON COMPLETE 06/10/2019 06/11/2019
Note: Released By: AMOBLEY
PLUM COMPLETE 06/10/2019 06/17/2019
Note: Released By: RLEE
BLD COMPLETE 05/20/2019 05/28/2019
Note: Released By: JHINDMAN
CUSVC COMPLETE 05/20/2019 05/20/2019
Note: Released By: AROSCOE
ELEC COMPLETE 05/20/2019 05/28/2019
Note: Released By: JHINDMAN
ENGIN1 HOLD 05/20/2019 05/20/2019
Note: Held By: TBAKER BENCHMARK ELEVATION NOT SHOWN ON SURVEY
LOCATE COMPLETE 05/20/2019 05/20/2019
Note: Released By: TCHURCHILL
MECH COMPLETE 05/20/2019 05/24/2019
Note: Released By: RLEE
PLUM HOLD 05/20/2019 05/28/2019
Note: Held By: JHINDMAN 1. Provide a plumbing riser signed by the plumbing contractor with their license number. 6th ed. FBC 107.1.
SW1 COMPLETE 05/20/2019 05/28/2019
Note: Released By: JHINDMAN
UD1 COMPLETE 05/20/2019 05/23/2019
Note: Released By: AHALL
ZON HOLD 05/20/2019 05/21/2019
Note: Held By: ELENS 1. Correct address/street name on the site plan to Radcliffe Drive (not Lane) 2. AC unit is to be screened with 7 gallon shrubs. (Correct legend on the landscape plan) 3. Show the driveway width and material on the site plan. 4. Provide a color chip for "Sacred Spring 0510", including the LRV, to demonstrate that the color meets the definition of earth tone.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 03/20/2020
REINSPECTION FEE ¤40.00 02/18/2020
REINSPECTION FEE ¤40.00 02/18/2020
REINSPECTION FEE ¤40.00 02/18/2020
REINSPECTION FEE ¤40.00 02/18/2020
REINSPECTION FEE ¤40.00 02/18/2020
REINSPECTION FEE ¤40.00 12/05/2019
REINSPECTION FEE ¤40.00 12/05/2019
REINSPECTION FEE ¤40.00 12/05/2019
NEW RESIDENTIAL INSPECTIONS ¤494.00 07/31/2019
SITE PLAN 20 ¤20.00 07/31/2019
SURCHARGE FS 533.721 ¤11.59 07/31/2019
SURCHARGE - FS 468.631 ¤17.38 07/31/2019
STORM WATER PERMIT FEES ¤80.00 07/31/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 07/31/2019
SEWER CREDIT (¤1,146.46) 07/31/2019
SEWER INSPECTION ¤25.00 07/31/2019
SEWER CAPITAL FACILITY ¤4,515.25 07/31/2019
WATER CAPITAL FACILITY FEE ¤3,314.84 07/31/2019
METER - DEPOSIT ¤60.00 07/31/2019
WATER- TURN ON ¤25.00 07/31/2019
ADMIN FEE ¤20.00 07/31/2019
CONNECTION FEES ¤985.25 07/31/2019
ELECTRIC FEE ¤208.20 07/31/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 07/31/2019
IMPACT FEE FIRE ¤223.38 07/31/2019
IMPACT FEE PARKS ¤849.24 07/31/2019
IMPACT FEE SCHOOL ¤3,600.00 07/31/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 07/31/2019
MECHANICAL FEE ¤208.20 07/31/2019
WATER -IRRIGATION INSPECTION ¤25.00 07/31/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 07/31/2019
PLAN CHECK FEE ¤98.80 07/31/2019
PLUMBING FEE ¤208.20 07/31/2019
Fees Total Due: ¤0.00 Total Paid: ¤15,753.73