Permit #2019050848
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00310-0310 |
| CONDITIONED SPACE: 1983 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 106 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| Total Square Footage: 2653 sqft |
| Block: 00310 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: 407-307-4753 |
| Location Address: 72 RADCLIFFE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/31/2019 |
| NOC: RECORDED |
| Applicant name: SHAWN VIRAG |
| Owner: BRITE PROPERTIES OF FLORIDA |
|
Address 7345 GREENBRIAR PKWY ORLANDO , FL 32819 |
| Lot: 0310 |
| Contracted Stated Job Value: ¤135,076.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SHAWNTELLE CONSULTING AND DESIGN LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
611 LARGOVISTA DR OAKLAND, FL 34787 |
CBC1261160 (Exp: 08/31/2020) | 407-307-4753 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/27/2020 | APPROVED | FWILLIS |
| U -UTILITY RESIDENTIAL FINAL | 02/27/2020 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 02/26/2020 | APPROVED | MMAJEWSKI |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/26/2020 | APPROVED | MMAJEWSKI |
| ROW - STORMWATER FINAL | 02/26/2020 | APPROVED | MMAJEWSKI |
| FINAL SURVEY (OFFICE USE ONLY) | 02/26/2020 | APPROVED | MMAJEWSKI |
| ELECTRIC - EARLY POWER | 02/24/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 9:50 | |||
| ELECTRIC - EARLY POWER | 02/21/2020 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: Not allowed to have power hooked up or on in house before early power inspection | |||
| ROW- PRE-APRON (PRE-POUR) | 01/23/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: IT IS THE BUILDER’S RESPONSIBILITY: TO RECHECK ELEVATIONS AND PIPE SIZE, TO INSURE THAT AN OBSTRUCTION DOES NOT EXIST UPSTREAM AND OR DOWNSTREAM, THAT THE CULVERT PIPE IS SET TO AND OR FOLLOWS THE SWALE PLAN, FORM THE DRIVEWAY TO THE APPROVEDSITE PLAN AND FOLLOW THE APPROVED DRIVEWAY DETAIL SHEET PROVIDED BY THE CITY OF PALM COAST. PRIOR TO PLACEMENT OF CONCRETE MATERIAL NEEDS TO BE COMPACTED | |||
| U - SEWER TIE IN | 01/17/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 01/17/2020 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 12/23/2019 | APPROVED | JDELBONIS |
| PEP TANK INSTALLATION REQUEST | 12/20/2019 | APPROVED | CSTONE |
| ALL ROUGH | 12/17/2019 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 12/17/2019 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 12/16/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: THIS IS A REINSPECTION THE FOLLOWING WAS REQUESTED PRIOR BY INSPECTOR FW AND HAS NOT BEEN RESOLVED Right side of SLIDING GLASS DOOR approved Rated Fire caulk needed. Currently filled with Non-Rated Insulation. ALSO... MISSING NAILS IN 2X12 HEADER REQUESTED AT ROOF SHEATHING BRACES TIES DOWN CELLS HAS NOT BEEN CORRECTED | |||
| ALL ROUGH | 12/16/2019 | Disapproved - NO FEE | WMILLER |
| Note: THIS IS A REINSPECTION THO FOLOWING WAS REQUESTED PRIOR BY INSPECTOR FW, STILL NOT RESOLVED Maintain 5' of Head Pressure as required. | |||
| INSULATION | 12/11/2019 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: THIS IS A REINSPECTION Item still not addressed: Right side of SGD (marked in green) at the top needs approved Fire Rated Caulking not insulation. | |||
| ALL ROUGH | 12/11/2019 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: THIS IS A REINSPECTION Nothing addresed from the previous inspection; Electrical panel needs Phasing Nail Guards missing in Kitchen area Maintain 5' of Head Pressure as required. Everything is marked on the floor in Green. | |||
| ALL ROUGH | 12/09/2019 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: THIS IS A REINSPECTION Nail Guards still missing in Kitchenn area, Wall side and Island side. Protect pipes. Hole in floor needs to be filled in. | |||
| INSULATION | 12/09/2019 | Disapproved - NO FEE | FWILLIS |
| Note: Right side of SGD approved Rated Fire caulk needed. Currently filled with Non-Rated Insulation. | |||
| ALL ROUGH | 12/06/2019 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: Electrical Panel not Phased out. Nail guard missing in kitchen area. Maintain 5' of head pressure as required. | |||
| ROOF VALLEY & METAL | 11/25/2019 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/21/2019 | APPROVED - AS NOTED | FWILLIS |
| Note: Hangers at the 2X12 Header missing nails. Will Inspect at All Rough. | |||
| ELECTRIC-TUG | 11/21/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: MAILED FPL RELEASED POWER 5:15 | |||
| ELECTRIC-TUG | 11/15/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: PVC NOT CONNECTED TO MA. AT SERVICE NEC 2014 ART 352.48 STILL SAME AS LAST INSPECTION | |||
| ELECTRIC-TUG | 11/08/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: PVC NOT CONNECTED TO MA. NEC 2014 ART 352.48 | |||
| TIE BEAM / LINTEL | 11/07/2019 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 11/05/2019 | APPROVED | JMUNSON |
| MONOLITHIC SLAB | 10/11/2019 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 10/09/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: sides washed in covering rebar need to clean out and get 12 inches compated soil 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE… R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE… R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/07/2019 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 08/28/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 11/05/2019 | 11/05/2019 |
| Note: Released By: JMUNSON Foundation Survey | |||
| SWALE | COMPLETE | 06/12/2019 | 07/11/2019 |
| Note: Released By: TBAKER | |||
| ENGIN1 | COMPLETE | 06/10/2019 | 06/12/2019 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 06/10/2019 | 06/11/2019 |
| Note: Released By: AMOBLEY | |||
| PLUM | COMPLETE | 06/10/2019 | 06/17/2019 |
| Note: Released By: RLEE | |||
| BLD | COMPLETE | 05/20/2019 | 05/28/2019 |
| Note: Released By: JHINDMAN | |||
| CUSVC | COMPLETE | 05/20/2019 | 05/20/2019 |
| Note: Released By: AROSCOE | |||
| ELEC | COMPLETE | 05/20/2019 | 05/28/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | HOLD | 05/20/2019 | 05/20/2019 |
| Note: Held By: TBAKER BENCHMARK ELEVATION NOT SHOWN ON SURVEY | |||
| LOCATE | COMPLETE | 05/20/2019 | 05/20/2019 |
| Note: Released By: TCHURCHILL | |||
| MECH | COMPLETE | 05/20/2019 | 05/24/2019 |
| Note: Released By: RLEE | |||
| PLUM | HOLD | 05/20/2019 | 05/28/2019 |
| Note: Held By: JHINDMAN 1. Provide a plumbing riser signed by the plumbing contractor with their license number. 6th ed. FBC 107.1. | |||
| SW1 | COMPLETE | 05/20/2019 | 05/28/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 05/20/2019 | 05/23/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 05/20/2019 | 05/21/2019 |
| Note: Held By: ELENS 1. Correct address/street name on the site plan to Radcliffe Drive (not Lane) 2. AC unit is to be screened with 7 gallon shrubs. (Correct legend on the landscape plan) 3. Show the driveway width and material on the site plan. 4. Provide a color chip for "Sacred Spring 0510", including the LRV, to demonstrate that the color meets the definition of earth tone. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/20/2020 |
| REINSPECTION FEE | ¤40.00 | 02/18/2020 |
| REINSPECTION FEE | ¤40.00 | 02/18/2020 |
| REINSPECTION FEE | ¤40.00 | 02/18/2020 |
| REINSPECTION FEE | ¤40.00 | 02/18/2020 |
| REINSPECTION FEE | ¤40.00 | 02/18/2020 |
| REINSPECTION FEE | ¤40.00 | 12/05/2019 |
| REINSPECTION FEE | ¤40.00 | 12/05/2019 |
| REINSPECTION FEE | ¤40.00 | 12/05/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤494.00 | 07/31/2019 |
| SITE PLAN 20 | ¤20.00 | 07/31/2019 |
| SURCHARGE FS 533.721 | ¤11.59 | 07/31/2019 |
| SURCHARGE - FS 468.631 | ¤17.38 | 07/31/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/31/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 07/31/2019 |
| SEWER CREDIT | (¤1,146.46) | 07/31/2019 |
| SEWER INSPECTION | ¤25.00 | 07/31/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 07/31/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 07/31/2019 |
| METER - DEPOSIT | ¤60.00 | 07/31/2019 |
| WATER- TURN ON | ¤25.00 | 07/31/2019 |
| ADMIN FEE | ¤20.00 | 07/31/2019 |
| CONNECTION FEES | ¤985.25 | 07/31/2019 |
| ELECTRIC FEE | ¤208.20 | 07/31/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 07/31/2019 |
| IMPACT FEE FIRE | ¤223.38 | 07/31/2019 |
| IMPACT FEE PARKS | ¤849.24 | 07/31/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/31/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 07/31/2019 |
| MECHANICAL FEE | ¤208.20 | 07/31/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/31/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 07/31/2019 |
| PLAN CHECK FEE | ¤98.80 | 07/31/2019 |
| PLUMBING FEE | ¤208.20 | 07/31/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,753.73 |