Permit #2019050850

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-00280-0120
CONDITIONED SPACE: 1883 sqft
GARAGE: 518 sqft
OPENED PORCH (WITH ROOF) : 160 sqft
OPENED PORCH (WITH ROOF) : 288 sqft
Total Square Footage: 2849 sqft
Block: 00280
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 386-313-6922
Location Address: 45 LARAMIE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/15/2019
NOC: RECORDED
Applicant name: FRANK JOSEPH WHALEN
Owner: EAST COAST BUILDING CORP

Address

321 BRIARWOOD DRIVE

BUNNELL, FL 32110

Lot: 0120
Contracted Stated Job Value: ¤200,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

EAST COAST BUILDING CORP
Status Location Address State License Number Phone Fax
ACTIVE

321 BRIARWOOD DRIVE

BUNNELL, FL 32110

CGC057860 (Exp: 08/31/2026) 386-313-6922 386-313-6922

Sub Contractors

JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/13/2020 FINAL APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION
BLD - BUILDING FINAL 04/23/2020 CANCELLED BY APPLICANT JCOLASANTI
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 04/15/2020 CANCELLED BY APPLICANT JCOLASANTI
U -UTILITY RESIDENTIAL FINAL 04/15/2020 APPROVED AHALL
ROW FIELD SURVEY /GRADING CERTIFICATION 04/09/2020 APPROVED RGROSS
FINAL SURVEY (OFFICE USE ONLY) 04/09/2020 APPROVED RGROSS
ROW - STORMWATER FINAL 03/31/2020 APPROVED RGROSS
ROW - FINAL APRON (AFTER POUR) 03/31/2020 APPROVED RGROSS
ROW- PRE-APRON (PRE-POUR) 03/11/2020 APPROVED RGROSS
Note: THIS IS A REINSPECTION NEW BUILDER LEARNING CURVE. NOT 8 FT FROM ROAD EDGE. NOT FORMED TO ORIGINAL BUILDING PLANS OF 16 FT. NO REBAR. READY TO POUR
ROW- PRE-APRON (PRE-POUR) 03/10/2020 Disapproved - NO FEE RGROSS
Note: NEW BUILDER LEARNING CURVE. NOT 8 FT FROM ROAD EDGE. NOT FORMED TO ORIGINAL BUILDING PLANS OF 16 FT. NO REBAR. ON SITE WITH SUPER.
U - SEWER TIE IN 03/04/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 03/04/2020 APPROVED JGIBSON
ELECTRIC - EARLY POWER 03/04/2020 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION CONDUCTORS/JOUNTS NEED BOXES NEC 314 AND 310 ALSO FOUND FIXTURE BRACKET ON COUNTER, WHAT FIXTURE DOES IT GO TO? NEED ELECTRICIAN TO MEET ON SITE ON RE-INSPECTION ITEMS WERE FIXED, EMAILED FPL RELEASED POWER 9:40
ELECTRIC - EARLY POWER 03/02/2020 Disapproved - NO FEE RMARTIN
Note: CONDUCTORS/JOUNTS NEED BOXES NEC 314 AND 310 ALSO FOUND FIXTURE BRACKET ON COUNTER, WHAT FIXTURE DOES IT GO TO? NEED ELECTRICIAN TO MEET ON SITE ON RE-INSPECTION
PEP TANK INSTALLATION REQUEST 02/18/2020 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 12/31/2019 APPROVED JCOLASANTI
LATH/BRICK/ WATER BARRIER 12/27/2019 CANCELLED BY APPLICANT WEB
INSULATION 11/19/2019 APPROVED JCOLASANTI
ALL ROUGH 11/14/2019 APPROVED - AS NOTED JCOLASANTI
Note: need to strap conduit from meter box to service mast
ROOF VALLEY & METAL 11/07/2019 APPROVED JCOLASANTI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/22/2019 APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/21/2019 Disapproved - NO FEE JCOLASANTI
Note: THIS IS A REINSPECTION need truss engineering on site to complete inspection
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/27/2019 PARTIALLY APPROVED JCOLASANTI
Note: inspected wall sheathing ok to tyvek walls....need to call when engineering and braces and tie downs are complete
FOUND SURVEY APPROVED (OFFICE) 09/26/2019 APPROVED JMUNSON
MONOLITHIC SLAB 08/22/2019 APPROVED - AS NOTED JCOLASANTI
Note: need compaction test on site by next inspection
PLUMBING 1ST ROUGH UNDERGROUND 08/21/2019 APPROVED - AS NOTED JGIBSON
Note: THIS WAS APPROVED ON 8/20/19
WATER METER INSTALLATION REQUEST 07/24/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 10/02/2023 10/02/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM the written in parts are not legible.
BLD COMPLETE 11/06/2019 11/12/2019
Note: Released By: PBUCKLEY
SW1 COMPLETE 09/24/2019 09/25/2019
Note: Released By: JMUNSON
ZON COMPLETE 06/18/2019 06/18/2019
Note: Released By: TDOAK
ZON HOLD 06/10/2019 06/10/2019
Note: Held By: AMOBLEY Circular drive must have a minimum 5ft setback at arc to property line
PLUM COMPLETE 06/10/2019 06/17/2019
Note: Released By: RLEE
ELEC COMPLETE 06/10/2019 06/17/2019
Note: Released By: RLEE
SWALE COMPLETE 05/28/2019 06/03/2019
Note: Released By: TBAKER
BLD COMPLETE 05/21/2019 05/24/2019
Note: Released By: RLEE
CUSVC COMPLETE 05/21/2019 05/22/2019
Note: Released By: AROSCOE
ELEC HOLD 05/21/2019 05/24/2019
Note: Held By: RLEE electrical riser diagram and load calculations with contractors name and license number
ENGIN1 COMPLETE 05/21/2019 05/28/2019
Note: Released By: TBAKER
LOCATE COMPLETE 05/21/2019 05/23/2019
Note: Released By: CSTONE
MECH COMPLETE 05/21/2019 05/24/2019
Note: Released By: RLEE
PLUM HOLD 05/21/2019 05/24/2019
Note: Held By: RLEE Plumbing riser diagram with contractors name and license
SW1 COMPLETE 05/21/2019 05/24/2019
Note: Released By: RLEE
UD1 COMPLETE 05/21/2019 05/28/2019
Note: Released By: LFITZGERALD
ZON HOLD 05/21/2019 05/23/2019
Note: Held By: AMOBLEY Circular drive must have a minimum 5ft setback at arc to property line Documents and color sheet state shingle roof. Blueprints show metal roof Left and right elevation appear to be labeled incorrectly on elevation pages

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 07/08/2020
CONTRACTOR CHANGE ¤40.00 07/08/2020
ELECTRIC FEE ¤209.40 07/15/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 07/15/2019
IMPACT FEE FIRE ¤223.38 07/15/2019
IMPACT FEE PARKS ¤849.24 07/15/2019
IMPACT FEE SCHOOL ¤3,600.00 07/15/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 07/15/2019
MECHANICAL FEE ¤209.40 07/15/2019
WATER -IRRIGATION INSPECTION ¤25.00 07/15/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 07/15/2019
PLAN CHECK FEE ¤99.60 07/15/2019
PLUMBING FEE ¤209.40 07/15/2019
NEW RESIDENTIAL INSPECTIONS ¤498.00 07/15/2019
SITE PLAN 20 ¤20.00 07/15/2019
SURCHARGE FS 533.721 ¤11.66 07/15/2019
SURCHARGE - FS 468.631 ¤17.49 07/15/2019
STORM WATER PERMIT FEES ¤80.00 07/15/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 07/15/2019
SEWER CREDIT (¤1,147.00) 07/15/2019
SEWER INSPECTION ¤25.00 07/15/2019
SEWER CAPITAL FACILITY ¤4,515.25 07/15/2019
WATER CAPITAL FACILITY FEE ¤3,314.84 07/15/2019
METER - DEPOSIT ¤60.00 07/15/2019
WATER- TURN ON ¤25.00 07/15/2019
ADMIN FEE ¤20.00 07/15/2019
CONNECTION FEES ¤985.25 07/15/2019
Fees Total Due: ¤0.00 Total Paid: ¤15,481.77