I want to search for...
Permit #2019050884
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-3330 |
| CONDITIONED SPACE: 2102 sqft |
| CONDITIONED SPACE: 1377 sqft |
| GARAGE: 722 sqft |
| OPENED PORCH (WITH ROOF) : 63 sqft |
| OPENED PORCH (WITH ROOF) : 263 sqft |
| OPENED PORCH (WITH ROOF) : 245 sqft |
| Total Square Footage: 4772 sqft |
| Block: 00000 |
| Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH |
| Job Phone: 386-944-9546 |
| Location Address: 107 ROSE PETAL CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/18/2019 |
| NOC: RECORDED |
| Applicant name: ANTHONY THOMAS DI NIZO JR |
| Owner: WAYNE CURTIS JOHNSON TRUST |
|
Address 3639 MIDWAY DRIVE # B358 SAN DIEGO, CA 92110 |
| Lot: 3330 |
| Contracted Stated Job Value: ¤700,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
LUXURY BUILDERS INC.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
280 FENTRESS BLVD SUITE 2 DAYTONA BEACH, FL 32114 |
CGC038675 (Exp: 08/31/2026) | 386-944-9546 |
Sub Contractors
BEN K REIHL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
605 MCINTOSH ROAD Ormond Beach, 32174 |
EC0002867 (Exp: 08/31/2026) | (386) 677-4464 | 386-673-4199 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
JERRY F TORDEUR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
4244 JACKSON ST Port Orange, FL 32119 |
CFC033863 (Exp: 08/31/2020) | (386) 761-3526 | (386)761-0132 |
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
VINCENT PASQUALE POLIZZI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
219 W OHIO AVENUE LAKE HELEN, FL 32734 |
CFC057948 (Exp: 08/31/2026) | (386)774-8244 | (386)775-1749 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL SURVEY (OFFICE USE ONLY) | 08/10/2020 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION 3.5 X 3.5 paver pad over the left property line 8/10/20 - APPROVED | |||
| BLD - BUILDING FINAL | 08/05/2020 | FINAL APPROVED | MMESSER |
| U -UTILITY RESIDENTIAL FINAL | 08/05/2020 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 07/31/2020 | APPROVED - AS NOTED | RGROSS |
| Note: SMALL PAVER LANDING AT THE GARAGE BACK DOOR IS SLIGHTLY OVER THE PROPERTY LINE. BECAUSE THE LOT NEXT TO IT IS NOT A BUILDABLE LOT THIS IS NOT GOING TO AFFECT ANY STORM WATER DRAINAGE ISSUES IN THE FUTURE. | |||
| PLUMBING FINAL | 07/31/2020 | APPROVED | JGIBSON |
| FINAL SURVEY (OFFICE USE ONLY) | 07/31/2020 | Disapproved - NO FEE | CTROHA |
| Note: 3.5 X 3.5 paver pad over the left property line | |||
| ROW- PAVER RESTRAINTS | 07/22/2020 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 07/22/2020 | APPROVED | RGROSS |
| ELECTRIC - EARLY POWER | 07/16/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 10:28 am | |||
| ROW- PRE-APRON (PRE-POUR) | 07/15/2020 | APPROVED - AS NOTED | RGROSS |
| Note: First thing in morning please. 7/14/2020 7/15/20 - BUILDER PLACING PAVERS WITHOUT A PAVER RESTRAINT FIRST. EXPLAINED NEW PROCESS AND REQUIREMENT. RESTRAINTS WILL BE CHECKED WITH PROBE ROD ON THE FINAL. | |||
| U - SEWER TIE IN | 07/13/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 07/13/2020 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 06/10/2020 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION not ready needs to be completed front and left side only | |||
| PLUMBING FINAL | 05/29/2020 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 04/01/2020 | PARTIALLY APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION not ready needs to be completed front and left side only | |||
| LATH/BRICK/ WATER BARRIER | 03/31/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: not ready needs to be completed | |||
| INSULATION | 03/17/2020 | APPROVED | JDELBONIS |
| GAS ROUGH | 03/12/2020 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 03/12/2020 | APPROVED | JDELBONIS |
| Note: All rough inspection administratively approved by the CBO as a result of the other rough-in inspections approved on 3/12/20 by Inspector John Delbonis. | |||
| FRAMING | 03/12/2020 | APPROVED - AS NOTED | JDELBONIS |
| Note: THIS IS A REINSPECTION aproved to engineering letter dated March 5 2020 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/12/2020 | APPROVED | JDELBONIS |
| HVAC ROUGH | 03/12/2020 | APPROVED | JDELBONIS |
| ELECTRIC 2ND ROUGH | 02/25/2020 | APPROVED | JDELBONIS |
| HVAC ROUGH | 02/25/2020 | APPROVED | JDELBONIS |
| GAS ROUGH | 02/25/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: no preshur test | |||
| PLUMBING 2ND ROUGH | 02/25/2020 | APPROVED | JDELBONIS |
| PLUMBING 2ND ROUGH | 02/25/2020 | Disapproved - NO FEE | JDELBONIS |
| Note: need test on drain lins | |||
| WINDOW FASTENING | 02/25/2020 | APPROVED | JDELBONIS |
| FRAMING | 02/25/2020 | Disapproved - NO FEE | JDELBONIS |
| Note: need leter from engineer on hools in beem and notches in post ok to spray foam roof and block walls | |||
| EXTERIOR STRAP/CLIP | 02/25/2020 | APPROVED | JDELBONIS |
| ELECTRIC-TUG | 12/23/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 2:35 | |||
| ROOF VALLEY & METAL | 11/19/2019 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/04/2019 | APPROVED | MWILLIAMS |
| WALL SHEATHING | 11/04/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/31/2019 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 10/31/2019 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION | |||
| WALL SHEATHING | 10/21/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: sheeting incomplete not ready | |||
| TIE BEAM / LINTEL | 09/25/2019 | APPROVED | JDELBONIS |
| LATH/BRICK/ WATER BARRIER | 09/25/2019 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 09/23/2019 | Disapproved - NO FEE | RMARTIN |
| Note: THIS IS NOT A CALLED IN INSPECTION, NEED TO SUBMIT TO OFFICE | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/23/2019 | APPROVED | JMUNSON |
| MONOLITHIC SLAB | 08/27/2019 | APPROVED | JDELBONIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/19/2019 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 08/01/2019 | APPROVED | CSTONE |
| ROW FIELD SURVEY /GRADING CERTIFICATION | APPROVED | RGROSS |
Review History
| Department | Status | Date In | Date Out |
| ZON | HOLD | 08/07/2020 | 08/07/2020 |
| Note: Held By: AMOBLEY Final survey missing front setback. Talked to contractor tank was removed from this permit | |||
| ZON | COMPLETE | 08/07/2020 | 08/07/2020 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 03/06/2020 | 03/16/2020 |
| Note: Released By: PBUCKLEY | |||
| SW1 | COMPLETE | 09/18/2019 | 09/19/2019 |
| Note: Released By: JMUNSON | |||
| PLUM | COMPLETE | 08/09/2019 | 08/15/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | HOLD | 08/09/2019 | 08/09/2019 |
| Note: Held By: AMOBLEY Please provide a site plan/survey with location and size of tank with setbacks | |||
| ZON | COMPLETE | 07/17/2019 | 07/17/2019 |
| Note: Released By: AMOBLEY | |||
| ZON | HOLD | 06/27/2019 | 06/28/2019 |
| Note: Held By: TDOAK The MPD Agreement for this subdivision states: " Roof overhangs for walls situated at 1’6” setback and further than 40’ from the front property line shall not extend closer than 6” to the property line"' Please provide a letter from the homeowners association/developer stataing that they are OK with deviating from this requirement. | |||
| ZON | HOLD | 06/25/2019 | 06/25/2019 |
| Note: Held By: TDOAK Roof overhangs for walls situated at 1’6” setback and further than 40’ from the front property line shall not extend closer than 6” to the property line in order to maintain a minimum of 6’ clear separation between adjacent roof overhangs Demonstrate that the roof overhang does not exceed 12" in order to meet this minimum requirement. | |||
| ZON | HOLD | 06/24/2019 | 06/24/2019 |
| Note: Held By: TDOAK REPEAT COMMENT: Please specify driveway material on survey We see that the sketch shows brick pavers, however this needs to be added to the survey, which contains all the information that is needed for site plan approval. PLEASE NOTE THAT WHAT YOU ARE TERMING A SITE PLAN DOES NOT SUFFICE AS A SITE PLAN FOR ZONING. THE DOCUMENT YOU SUBMTTED AS A SURVEY IS WHAT WE REQUIRE AS A SITE PLAN AS IT HAS ALL PERTINENT INFORMATION. PLEASE NOTE THAT THE ORIGINAL SURVEY YOU SUBMITTED MUST BE CORRECTED WITH THE PROPER FOOTPRINT AND HOME SETBACKS AS WELL. | |||
| ZON | HOLD | 06/17/2019 | 06/18/2019 |
| Note: Held By: ELENS REPEAT COMMENT: Please specify driveway material on survey We see that the sketch shows brick pavers, however this needs to be added to the survey, which contains all the information that is needed for site plan approval. | |||
| BLD | COMPLETE | 06/17/2019 | 06/24/2019 |
| Note: Released By: RLEE | |||
| ZON | HOLD | 06/07/2019 | 06/07/2019 |
| Note: Held By: AMOBLEY Please specify driveway material on survey | |||
| BLD | HOLD | 06/07/2019 | 06/14/2019 |
| Note: Held By: JHINDMAN 1. Provide truss layout with truss to wall anchor schedule. 6th ed. FBC R 802.11.1.1. correction form was turned in but no plans were submitted for it. | |||
| ELEC | COMPLETE | 06/07/2019 | 06/14/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 06/07/2019 | 06/14/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | HOLD | 05/21/2019 | 05/21/2019 |
| Note: Held By: AMOBLEY Please specify driveway material on survey/site plan AC Pad must be screened with 7 gallon shrubs Missing elevation page showing rear and right elevation | |||
| BLD | HOLD | 05/20/2019 | 05/28/2019 |
| Note: Held By: JHINDMAN 1. Provide truss layout with truss to wall anchor schedule. 6th ed. FBC R 802.11.1.1. | |||
| CUSVC | COMPLETE | 05/20/2019 | 05/21/2019 |
| Note: Released By: HHAND | |||
| ELEC | HOLD | 05/20/2019 | 05/28/2019 |
| Note: Held By: JHINDMAN 1. Provide electrical load calculations per 2014 NEC art.220. | |||
| ENGIN1 | COMPLETE | 05/20/2019 | 05/20/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 05/20/2019 | 05/22/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 05/20/2019 | 05/22/2019 |
| Note: Released By: CSTONE | |||
| PLUM | HOLD | 05/20/2019 | 05/28/2019 |
| Note: Held By: JHINDMAN 1. Provide a signed and sealed plumbing riser or a riser signed by the plumbing contractor with their license number. 6th ed. FBC 107.1. | |||
| SW1 | COMPLETE | 05/20/2019 | 05/28/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 05/20/2019 | 05/23/2019 |
| Note: Released By: AHALL |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 07/16/2020 |
| REINSPECTION FEE | ¤40.00 | 07/16/2020 |
| REINSPECTION FEE | ¤40.00 | 07/16/2020 |
| REINSPECTION FEE | ¤40.00 | 07/16/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤1,400.00 | 07/18/2019 |
| SITE PLAN 20 | ¤20.00 | 07/18/2019 |
| SURCHARGE FS 533.721 | ¤28.80 | 07/18/2019 |
| SURCHARGE - FS 468.631 | ¤43.20 | 07/18/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/18/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 07/18/2019 |
| ELECTRIC FEE | ¤480.00 | 07/18/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 07/18/2019 |
| IMPACT FEE FIRE | ¤223.38 | 07/18/2019 |
| IMPACT FEE PARKS | ¤849.24 | 07/18/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/18/2019 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 07/18/2019 |
| MECHANICAL FEE | ¤480.00 | 07/18/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 07/18/2019 |
| PLAN CHECK FEE | ¤280.00 | 07/18/2019 |
| PLUMBING FEE | ¤480.00 | 07/18/2019 |
| ADMIN FEE | ¤20.00 | 07/18/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,004.01 |