I want to search for...

Permit #2019050917

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00290-0290
CONDITIONED SPACE: 1779 sqft
GARAGE: 451 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
OPENED PORCH (WITH ROOF) : 40 sqft
Total Square Footage: 2380 sqft
Block: 00290
Subdivision: 2199 - SECTION 28-WYNNFIELD
Job Phone: 407-807-0656
Location Address: 1 POWDER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/12/2019
NOC: RECORDED
Applicant name: NAVIN SUGRIM
Owner: BRITE PROPERTIES OF FLORIDA LLC

Address

7345 GREENBRIAR PARKWAY

ORLANDO, FL 32819

Lot: 0290
Contracted Stated Job Value: ¤129,200.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

DLP BUILDERS LLC
Status Location Address State License Number Phone
CANCEL

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

CBC1263567 (Exp: 08/31/2022) 407-807-0656

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/23/2020 FINAL APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION MOCP for AC unit calls for 25max breaker, 30 amp installed (door locked need access to electric panel to complete inspection)
BLD - BUILDING FINAL 04/22/2020 Disapproved -FEE REQUIRED JCOLASANTI
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION MOCP for AC unit calls for 25max breaker, 30 amp installed (door locked need access to electric panel to complete inspection)
BLD - BUILDING FINAL 04/17/2020 Disapproved -FEE REQUIRED JCOLASANTI
Note: THIS IS A REINSPECTION missing preshur relif valve on hotwater heater no hot water holes in garage walls 1 at electrick 1 at drain line drain line too long its in the mulch house is a mess garbage everywhere closet doors missing MOCP for AC unit calls for 25max breaker, 30 amp installed
BLD - BUILDING FINAL 04/15/2020 Disapproved -FEE REQUIRED JDELBONIS
Note: missing preshur relif valve on hotwater heater no hot water holes in garage walls 1 at electrick 1 at drain line drain line too long its in the mulch house is a mess garbage everywhere closet doors missing
U -UTILITY RESIDENTIAL FINAL 04/13/2020 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 04/09/2020 APPROVED MMAJEWSKI
ROW - FINAL APRON (AFTER POUR) 04/09/2020 APPROVED MMAJEWSKI
ROW FIELD SURVEY /GRADING CERTIFICATION 04/07/2020 APPROVED MMAJEWSKI
FINAL SURVEY (OFFICE USE ONLY) 04/07/2020 APPROVED MMAJEWSKI
ELECTRIC - EARLY POWER 03/20/2020 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION ALL JOINTS NEED TO BE IN A JUNCTION BOX, CHECK ALL, CONTRACTOR NEED TO MEET ON SITE FOR NEXT EARLY POWER INSPECTION NEC 314 SPOKE TO SUPER INT. AND ELECTRICIAN A FEW WEEKS AGO ABOUT ISSUES AND TO EMPHASIZE THAT CONTRACTOR NEEDS TO MEET ON SITE AT RE-INSPECTION..... NO ONE IS ON SITE Above items were taken care of. Emailed FPL at 10:35 am
ELECTRIC - EARLY POWER 03/19/2020 Disapproved -FEE REQUIRED RMARTIN
Note: ALL JOINTS NEED TO BE IN A JUNCTION BOX, CHECK ALL, CONTRACTOR NEED TO MEET ON SITE FOR NEXT EARLY POWER INSPECTION NEC 314 SPOKE TO SUPER INT. AND ELECTRICIAN A FEW WEEKS AGO ABOUT ISSUES AND TO EMPHASIZE THAT CONTRACTOR NEEDS TO MEET ON SITE AT RE-INSPECTION..... NO ONE IS ON SITE
ROW- PRE-APRON (PRE-POUR) 03/06/2020 APPROVED MMAJEWSKI
Note: THIS IS A REINSPECTION APRON NEEDS TO BE MINIMUM 5 INCHES THICK FROM EDGE OF PAVEMENT TO RIGHT OF WAY FROM RIGHT OF WAY TO GARAGE NEEDS TO BE A MINIMUM 4 INCHES THICK MATERIAL AROUND PIPE SHOULD ONLY BE HALF WAY UP PIPE NO BENCHMARK ON SITE PLAN
ROW- PRE-APRON (PRE-POUR) 03/04/2020 Disapproved - NO FEE MMAJEWSKI
Note: APRON NEEDS TO BE MINIMUM 5 INCHES THICK FROM EDGE OF PAVEMENT TO RIGHT OF WAY FROM RIGHT OF WAY TO GARAGE NEEDS TO BE A MINIMUM 4 INCHES THICK MATERIAL AROUND PIPE SHOULD ONLY BE HALF WAY UP PIPE NO BENCHMARK ON SITE PLAN
U - SEWER TIE IN 02/25/2020 APPROVED JGIBSON
ELECTRIC - EARLY POWER 02/25/2020 Disapproved -FEE REQUIRED RMARTIN
Note: ALL JOINTS NEED TO BE IN A JUNCTION BOX, CHECK ALL, CONTRACTOR NEED TO MEET ON SITE FOR NEXT EARLY POWER INSPECTION NEC 314 NO WORK HAS BEEN DONE, DO NOT CALL INSPECTIONS IN UNLESS WORK HAS BEEN DONE.
GRAVITY SEWER TEST 02/25/2020 APPROVED JGIBSON
ELECTRIC - EARLY POWER 02/12/2020 Disapproved -FEE REQUIRED RMARTIN
Note: ALL JOINTS NEED TO BE IN A JUNCTION BOX, CHECK ALL, CONTRACTOR NEED TO MEET ON SITE FOR NEXT EARLY POWER INSPECTION NEC 314
PEP TANK INSTALLATION REQUEST 01/31/2020 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 12/19/2019 APPROVED FWILLIS
INSULATION 12/18/2019 APPROVED JCOLASANTI
ROOF VALLEY & METAL 12/13/2019 APPROVED JDELBONIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/09/2019 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION
ALL ROUGH 12/09/2019 APPROVED - AS NOTED JDELBONIS
Note: THIS IS A REINSPECTION need return air vent front bedroom need water pressure on eater lines
ALL ROUGH 12/06/2019 CANCELLED BY APPLICANT FWILLIS
ELECTRIC-TUG 12/06/2019 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 3:00
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/06/2019 CANCELLED BY APPLICANT FWILLIS
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/15/2019 Disapproved - NO FEE JDELBONIS
Note: THIS IS A REINSPECTION no change need a engineering letter to resolve giter truss seem is not on supporting member
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/08/2019 Disapproved -FEE REQUIRED JDELBONIS
Note: load bearing wall does not support both sids of girder truss need engineer to provide a solution
TIE BEAM / LINTEL 09/17/2019 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 09/16/2019 Disapproved -FEE REQUIRED JDELBONIS
Note: remove wood frome tie down cell drill and pin in garage where marked
TIE BEAM / LINTEL 09/09/2019 CANCELLED BY APPLICANT WEB
FOUND SURVEY APPROVED (OFFICE) 08/29/2019 APPROVED JMUNSON
MONOLITHIC SLAB 08/20/2019 APPROVED JDELBONIS
PLUMBING 1ST ROUGH UNDERGROUND 08/13/2019 APPROVED JGIBSON
WATER METER INSTALLATION REQUEST 08/05/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
BLD COMPLETE 11/19/2019 11/26/2019
Note: Released By: PBUCKLEY
SW1 COMPLETE 08/27/2019 08/29/2019
Note: Released By: JMUNSON
ZON COMPLETE 06/18/2019 06/18/2019
Note: Released By: TDOAK
SW1 COMPLETE 06/18/2019 06/18/2019
Note: Released By: JMUNSON
ZON HOLD 06/05/2019 06/05/2019
Note: Held By: AMOBLEY Please provide front setback on site plan/survey
SW1 HOLD 06/05/2019 06/06/2019
Note: Held By: JMUNSON Need elevations for corners of the house. ULDC Tech Manual Sec5 300
PLUM COMPLETE 06/05/2019 06/12/2019
Note: Released By: JHINDMAN
SWALE COMPLETE 05/29/2019 06/24/2019
Note: Released By: TBAKER
BLD COMPLETE 05/21/2019 05/29/2019
Note: Released By: JHINDMAN
CUSVC COMPLETE 05/21/2019 05/21/2019
Note: Released By: AROSCOE
ELEC COMPLETE 05/21/2019 05/29/2019
Note: Released By: JHINDMAN
ENGIN1 COMPLETE 05/21/2019 05/29/2019
Note: Released By: TBAKER
LOCATE COMPLETE 05/21/2019 05/22/2019
Note: Released By: CSTONE
MECH COMPLETE 05/21/2019 05/29/2019
Note: Released By: JHINDMAN
PLUM HOLD 05/21/2019 05/29/2019
Note: Held By: JHINDMAN 1. provide a plumbing riser signed by the plumbing contractor with their license number
SW1 HOLD 05/21/2019 05/29/2019
Note: Held By: JHINDMAN remove septic tank and drainfield from survey
UD1 COMPLETE 05/21/2019 05/28/2019
Note: Released By: LFITZGERALD
ZON HOLD 05/21/2019 05/23/2019
Note: Held By: ELENS 1. Site requires five trees 2. Six foundation shrubs required on street side (facing Powder Hill Lane) 3. Four foundation shrubs required on Interior side 4. Show driveway width and material on site plan

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 06/02/2020
CONTRACTOR CHANGE ¤40.00 05/06/2020
REINSPECTION FEE ¤40.00 05/06/2020
REINSPECTION FEE ¤40.00 05/06/2020
REINSPECTION FEE ¤40.00 05/06/2020
REINSPECTION FEE ¤40.00 05/06/2020
REINSPECTION FEE ¤40.00 05/06/2020
REINSPECTION FEE ¤40.00 12/05/2019
REINSPECTION FEE ¤40.00 12/05/2019
NEW RESIDENTIAL INSPECTIONS ¤444.00 07/12/2019
SITE PLAN 20 ¤20.00 07/12/2019
SURCHARGE FS 533.721 ¤10.64 07/12/2019
SURCHARGE - FS 468.631 ¤15.95 07/12/2019
STORM WATER PERMIT FEES ¤80.00 07/12/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 07/12/2019
SEWER CREDIT (¤650.00) 07/12/2019
SEWER INSPECTION ¤25.00 07/12/2019
SEWER CAPITAL FACILITY ¤4,515.25 07/12/2019
WATER CAPITAL FACILITY FEE ¤3,314.84 07/12/2019
METER - DEPOSIT ¤60.00 07/12/2019
WATER- TURN ON ¤25.00 07/12/2019
ADMIN FEE ¤20.00 07/12/2019
CONNECTION FEES ¤985.25 07/12/2019
ELECTRIC FEE ¤193.20 07/12/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 07/12/2019
IMPACT FEE FIRE ¤223.38 07/12/2019
IMPACT FEE PARKS ¤849.24 07/12/2019
IMPACT FEE SCHOOL ¤3,600.00 07/12/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 07/12/2019
MECHANICAL FEE ¤193.20 07/12/2019
WATER -IRRIGATION INSPECTION ¤25.00 07/12/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 07/12/2019
PLAN CHECK FEE ¤88.80 07/12/2019
PLUMBING FEE ¤193.20 07/12/2019
Fees Total Due: ¤0.00 Total Paid: ¤16,142.81