Permit #2019050917
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00290-0290 |
| CONDITIONED SPACE: 1779 sqft |
| GARAGE: 451 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| OPENED PORCH (WITH ROOF) : 40 sqft |
| Total Square Footage: 2380 sqft |
| Block: 00290 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 407-807-0656 |
| Location Address: 1 POWDER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/12/2019 |
| NOC: RECORDED |
| Applicant name: NAVIN SUGRIM |
| Owner: BRITE PROPERTIES OF FLORIDA LLC |
|
Address 7345 GREENBRIAR PARKWAY ORLANDO, FL 32819 |
| Lot: 0290 |
| Contracted Stated Job Value: ¤129,200.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DLP BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
CBC1263567 (Exp: 08/31/2022) | 407-807-0656 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/23/2020 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION MOCP for AC unit calls for 25max breaker, 30 amp installed (door locked need access to electric panel to complete inspection) | |||
| BLD - BUILDING FINAL | 04/22/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION MOCP for AC unit calls for 25max breaker, 30 amp installed (door locked need access to electric panel to complete inspection) | |||
| BLD - BUILDING FINAL | 04/17/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: THIS IS A REINSPECTION missing preshur relif valve on hotwater heater no hot water holes in garage walls 1 at electrick 1 at drain line drain line too long its in the mulch house is a mess garbage everywhere closet doors missing MOCP for AC unit calls for 25max breaker, 30 amp installed | |||
| BLD - BUILDING FINAL | 04/15/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: missing preshur relif valve on hotwater heater no hot water holes in garage walls 1 at electrick 1 at drain line drain line too long its in the mulch house is a mess garbage everywhere closet doors missing | |||
| U -UTILITY RESIDENTIAL FINAL | 04/13/2020 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 04/09/2020 | APPROVED | MMAJEWSKI |
| ROW - FINAL APRON (AFTER POUR) | 04/09/2020 | APPROVED | MMAJEWSKI |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/07/2020 | APPROVED | MMAJEWSKI |
| FINAL SURVEY (OFFICE USE ONLY) | 04/07/2020 | APPROVED | MMAJEWSKI |
| ELECTRIC - EARLY POWER | 03/20/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION ALL JOINTS NEED TO BE IN A JUNCTION BOX, CHECK ALL, CONTRACTOR NEED TO MEET ON SITE FOR NEXT EARLY POWER INSPECTION NEC 314 SPOKE TO SUPER INT. AND ELECTRICIAN A FEW WEEKS AGO ABOUT ISSUES AND TO EMPHASIZE THAT CONTRACTOR NEEDS TO MEET ON SITE AT RE-INSPECTION..... NO ONE IS ON SITE Above items were taken care of. Emailed FPL at 10:35 am | |||
| ELECTRIC - EARLY POWER | 03/19/2020 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: ALL JOINTS NEED TO BE IN A JUNCTION BOX, CHECK ALL, CONTRACTOR NEED TO MEET ON SITE FOR NEXT EARLY POWER INSPECTION NEC 314 SPOKE TO SUPER INT. AND ELECTRICIAN A FEW WEEKS AGO ABOUT ISSUES AND TO EMPHASIZE THAT CONTRACTOR NEEDS TO MEET ON SITE AT RE-INSPECTION..... NO ONE IS ON SITE | |||
| ROW- PRE-APRON (PRE-POUR) | 03/06/2020 | APPROVED | MMAJEWSKI |
| Note: THIS IS A REINSPECTION APRON NEEDS TO BE MINIMUM 5 INCHES THICK FROM EDGE OF PAVEMENT TO RIGHT OF WAY FROM RIGHT OF WAY TO GARAGE NEEDS TO BE A MINIMUM 4 INCHES THICK MATERIAL AROUND PIPE SHOULD ONLY BE HALF WAY UP PIPE NO BENCHMARK ON SITE PLAN | |||
| ROW- PRE-APRON (PRE-POUR) | 03/04/2020 | Disapproved - NO FEE | MMAJEWSKI |
| Note: APRON NEEDS TO BE MINIMUM 5 INCHES THICK FROM EDGE OF PAVEMENT TO RIGHT OF WAY FROM RIGHT OF WAY TO GARAGE NEEDS TO BE A MINIMUM 4 INCHES THICK MATERIAL AROUND PIPE SHOULD ONLY BE HALF WAY UP PIPE NO BENCHMARK ON SITE PLAN | |||
| U - SEWER TIE IN | 02/25/2020 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 02/25/2020 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: ALL JOINTS NEED TO BE IN A JUNCTION BOX, CHECK ALL, CONTRACTOR NEED TO MEET ON SITE FOR NEXT EARLY POWER INSPECTION NEC 314 NO WORK HAS BEEN DONE, DO NOT CALL INSPECTIONS IN UNLESS WORK HAS BEEN DONE. | |||
| GRAVITY SEWER TEST | 02/25/2020 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 02/12/2020 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: ALL JOINTS NEED TO BE IN A JUNCTION BOX, CHECK ALL, CONTRACTOR NEED TO MEET ON SITE FOR NEXT EARLY POWER INSPECTION NEC 314 | |||
| PEP TANK INSTALLATION REQUEST | 01/31/2020 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 12/19/2019 | APPROVED | FWILLIS |
| INSULATION | 12/18/2019 | APPROVED | JCOLASANTI |
| ROOF VALLEY & METAL | 12/13/2019 | APPROVED | JDELBONIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/09/2019 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 12/09/2019 | APPROVED - AS NOTED | JDELBONIS |
| Note: THIS IS A REINSPECTION need return air vent front bedroom need water pressure on eater lines | |||
| ALL ROUGH | 12/06/2019 | CANCELLED BY APPLICANT | FWILLIS |
| ELECTRIC-TUG | 12/06/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 3:00 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/06/2019 | CANCELLED BY APPLICANT | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/15/2019 | Disapproved - NO FEE | JDELBONIS |
| Note: THIS IS A REINSPECTION no change need a engineering letter to resolve giter truss seem is not on supporting member | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/08/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: load bearing wall does not support both sids of girder truss need engineer to provide a solution | |||
| TIE BEAM / LINTEL | 09/17/2019 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 09/16/2019 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: remove wood frome tie down cell drill and pin in garage where marked | |||
| TIE BEAM / LINTEL | 09/09/2019 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 08/29/2019 | APPROVED | JMUNSON |
| MONOLITHIC SLAB | 08/20/2019 | APPROVED | JDELBONIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/13/2019 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 08/05/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 11/19/2019 | 11/26/2019 |
| Note: Released By: PBUCKLEY | |||
| SW1 | COMPLETE | 08/27/2019 | 08/29/2019 |
| Note: Released By: JMUNSON | |||
| ZON | COMPLETE | 06/18/2019 | 06/18/2019 |
| Note: Released By: TDOAK | |||
| SW1 | COMPLETE | 06/18/2019 | 06/18/2019 |
| Note: Released By: JMUNSON | |||
| ZON | HOLD | 06/05/2019 | 06/05/2019 |
| Note: Held By: AMOBLEY Please provide front setback on site plan/survey | |||
| SW1 | HOLD | 06/05/2019 | 06/06/2019 |
| Note: Held By: JMUNSON Need elevations for corners of the house. ULDC Tech Manual Sec5 300 | |||
| PLUM | COMPLETE | 06/05/2019 | 06/12/2019 |
| Note: Released By: JHINDMAN | |||
| SWALE | COMPLETE | 05/29/2019 | 06/24/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 05/21/2019 | 05/29/2019 |
| Note: Released By: JHINDMAN | |||
| CUSVC | COMPLETE | 05/21/2019 | 05/21/2019 |
| Note: Released By: AROSCOE | |||
| ELEC | COMPLETE | 05/21/2019 | 05/29/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 05/21/2019 | 05/29/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 05/21/2019 | 05/22/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 05/21/2019 | 05/29/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | HOLD | 05/21/2019 | 05/29/2019 |
| Note: Held By: JHINDMAN 1. provide a plumbing riser signed by the plumbing contractor with their license number | |||
| SW1 | HOLD | 05/21/2019 | 05/29/2019 |
| Note: Held By: JHINDMAN remove septic tank and drainfield from survey | |||
| UD1 | COMPLETE | 05/21/2019 | 05/28/2019 |
| Note: Released By: LFITZGERALD | |||
| ZON | HOLD | 05/21/2019 | 05/23/2019 |
| Note: Held By: ELENS 1. Site requires five trees 2. Six foundation shrubs required on street side (facing Powder Hill Lane) 3. Four foundation shrubs required on Interior side 4. Show driveway width and material on site plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/02/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 05/06/2020 |
| REINSPECTION FEE | ¤40.00 | 05/06/2020 |
| REINSPECTION FEE | ¤40.00 | 05/06/2020 |
| REINSPECTION FEE | ¤40.00 | 05/06/2020 |
| REINSPECTION FEE | ¤40.00 | 05/06/2020 |
| REINSPECTION FEE | ¤40.00 | 05/06/2020 |
| REINSPECTION FEE | ¤40.00 | 12/05/2019 |
| REINSPECTION FEE | ¤40.00 | 12/05/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤444.00 | 07/12/2019 |
| SITE PLAN 20 | ¤20.00 | 07/12/2019 |
| SURCHARGE FS 533.721 | ¤10.64 | 07/12/2019 |
| SURCHARGE - FS 468.631 | ¤15.95 | 07/12/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/12/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 07/12/2019 |
| SEWER CREDIT | (¤650.00) | 07/12/2019 |
| SEWER INSPECTION | ¤25.00 | 07/12/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 07/12/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 07/12/2019 |
| METER - DEPOSIT | ¤60.00 | 07/12/2019 |
| WATER- TURN ON | ¤25.00 | 07/12/2019 |
| ADMIN FEE | ¤20.00 | 07/12/2019 |
| CONNECTION FEES | ¤985.25 | 07/12/2019 |
| ELECTRIC FEE | ¤193.20 | 07/12/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 07/12/2019 |
| IMPACT FEE FIRE | ¤223.38 | 07/12/2019 |
| IMPACT FEE PARKS | ¤849.24 | 07/12/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/12/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 07/12/2019 |
| MECHANICAL FEE | ¤193.20 | 07/12/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/12/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 07/12/2019 |
| PLAN CHECK FEE | ¤88.80 | 07/12/2019 |
| PLUMBING FEE | ¤193.20 | 07/12/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,142.81 |