I want to search for...
Permit #2019050965
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00400-0150 |
| CONDITIONED SPACE: 1983 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| OPENED PORCH (WITH ROOF) : 106 sqft |
| Total Square Footage: 2653 sqft |
| Block: 00400 |
| Subdivision: - |
| Job Phone: 407-807-0656 |
| Location Address: 34 BURROUGHS DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/22/2019 |
| NOC: RECORDED |
| Applicant name: NAVIN SUGRIM |
| Owner: BRITE PROPERTIES OF FLORIDA LLC |
|
Address 7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤135,076.00 |
| Job Description: NEW SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DLP BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
CBC1263567 (Exp: 08/31/2022) | 407-807-0656 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/27/2020 | FINAL APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION doors locked at time of inspection, need access to complete inspection please do not forget to install weather striping front door | |||
| BLD - BUILDING FINAL | 05/26/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: doors locked at time of inspection, need access to complete inspection | |||
| U -UTILITY RESIDENTIAL FINAL | 05/26/2020 | APPROVED - AS NOTED | AHALL |
| Note: please provide a flush sanitary cleanout cap, at finish grade in non mulch bed areas. | |||
| ROW - FINAL APRON (AFTER POUR) | 05/22/2020 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/22/2020 | APPROVED | RGROSS |
| Note: SEE FINAL SURVEY NOTES. | |||
| ROW - STORMWATER FINAL | 05/22/2020 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 05/22/2020 | APPROVED - AS NOTED | RGROSS |
| Note: DRAINAGE CONVEYANCE FLOWS ON THE INSIDE OF THE PROPERTY LINES. LEFT SIDE AROUND THE WATER METERS AND THE RIGHT SIDE AROUND THE PEP TANK AND THE TELEPHONE POLE. | |||
| ELECTRIC - EARLY POWER | 03/20/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:45 | |||
| ROW- PRE-APRON (PRE-POUR) | 03/02/2020 | APPROVED - AS NOTED | RGROSS |
| Note: NEEDS MORE COMPACTION IN THE APRON BEFORE POURING. | |||
| ELECTRIC-TUG | 02/25/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 9:50 | |||
| GRAVITY SEWER TEST | 02/24/2020 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 02/24/2020 | APPROVED | JGIBSON |
| ELECTRIC-TUG | 02/20/2020 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: CONDUCTORS GOING TO INTERIOR PANEL ARE LANDED IN METER MAIN, HOUSE IS NOT SAFED OFF FOR EARLY POWER, DISCONNECT CONDUCTORS IN METER MAIN | |||
| PEP TANK INSTALLATION REQUEST | 01/29/2020 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 01/09/2020 | APPROVED | JCOLASANTI |
| INSULATION | 01/09/2020 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 01/08/2020 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: need to use approved fire rated seal at electric panel ceiling FBC 302 | |||
| ALL ROUGH | 01/06/2020 | APPROVED - AS NOTED | JCOLASANTI |
| Note: FIREBLOCKING R302.11 1-6 (furring strip at ceiling rear wall master bedroom....NEED TO PHASE OUT HOT CONDUCTORS IN PANEL BOX. NEC.210.5(C).. | |||
| ROOF VALLEY & METAL | 12/23/2019 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/18/2019 | APPROVED - AS NOTED | JCOLASANTI |
| Note: need to strap valley rear garage check at all rough | |||
| TIE BEAM / LINTEL | 12/03/2019 | APPROVED | JCOLASANTI |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 11/27/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: down placement at front entry is not as proposed (circled and highlighterd on plans) | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/25/2019 | APPROVED | CTROHA |
| MONOLITHIC SLAB | 11/14/2019 | APPROVED | JCOLASANTI |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/08/2019 | APPROVED | JCOLASANTI |
| WATER METER INSTALLATION REQUEST | 09/19/2019 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 11/21/2019 | 11/25/2019 |
| Note: Released By: CTROHA | |||
| PLUM | COMPLETE | 07/12/2019 | 07/16/2019 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 07/12/2019 | 07/15/2019 |
| Note: Released By: AMOBLEY | |||
| SWALE | COMPLETE | 05/29/2019 | 06/12/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 05/22/2019 | 05/30/2019 |
| Note: Released By: JHINDMAN | |||
| CUSVC | COMPLETE | 05/22/2019 | 05/22/2019 |
| Note: Released By: AROSCOE | |||
| ELEC | COMPLETE | 05/22/2019 | 05/30/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 05/22/2019 | 05/29/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 05/22/2019 | 05/24/2019 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 05/22/2019 | 05/30/2019 |
| Note: Released By: JHINDMAN | |||
| PLUM | HOLD | 05/22/2019 | 05/30/2019 |
| Note: Held By: JHINDMAN provide aplumbing riser signed by the plumbing contractor with their license number. 6th ed. FBC 107.1. | |||
| SW1 | COMPLETE | 05/22/2019 | 05/30/2019 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 05/22/2019 | 05/30/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 05/22/2019 | 05/28/2019 |
| Note: Held By: AMOBLEY Need at least four shrubs along each side of home Survey/site plan must have driveway material and width This lot has a binding lot agreement on file with 44 Buttermill. No records of it ever being rescinded. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/16/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 05/06/2020 |
| REINSPECTION FEE | ¤40.00 | 05/06/2020 |
| REINSPECTION FEE | ¤40.00 | 02/18/2020 |
| CONTRACTOR CHANGE | ¤40.00 | 01/08/2020 |
| REINSPECTION FEE | ¤40.00 | 01/08/2020 |
| METER - DEPOSIT | ¤60.00 | 08/22/2019 |
| WATER- TURN ON | ¤25.00 | 08/22/2019 |
| ADMIN FEE | ¤20.00 | 08/22/2019 |
| CONNECTION FEES | ¤985.25 | 08/22/2019 |
| ELECTRIC FEE | ¤208.20 | 08/22/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 08/22/2019 |
| IMPACT FEE FIRE | ¤223.38 | 08/22/2019 |
| IMPACT FEE PARKS | ¤849.24 | 08/22/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/22/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 08/22/2019 |
| MECHANICAL FEE | ¤208.20 | 08/22/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/22/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 08/22/2019 |
| PLAN CHECK FEE | ¤98.80 | 08/22/2019 |
| PLUMBING FEE | ¤208.20 | 08/22/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤494.00 | 08/22/2019 |
| SITE PLAN 20 | ¤20.00 | 08/22/2019 |
| SURCHARGE FS 533.721 | ¤11.59 | 08/22/2019 |
| SURCHARGE - FS 468.631 | ¤17.38 | 08/22/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/22/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 08/22/2019 |
| SEWER CREDIT | (¤850.00) | 08/22/2019 |
| SEWER INSPECTION | ¤25.00 | 08/22/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 08/22/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 08/22/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,930.19 |