I want to search for...
Permit #2019051082
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00510-0030 |
| CONDITIONED SPACE: 1983 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 106 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| Total Square Footage: 2653 sqft |
| Block: 00510 |
| Subdivision: 2123 - SECTION 57-ULYSSES TREES |
| Job Phone: 407-807-0656 |
| Location Address: 6 UNITY CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/09/2019 |
| NOC: RECORDED |
| Applicant name: NAVIN SUGRIM |
| Owner: DLP BRITE HOMES LLC |
|
Address 605 PALENCIA CLUB DRIVE ST AUGUSTINE, FL 32095 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤135,076.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DLP BUILDERS LLC
| Status | Location Address | State License Number | Phone |
| CANCEL |
7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
CBC1263567 (Exp: 08/31/2022) | 407-807-0656 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ROBERT G DELLO RUSSO
| Status | Location Address | State License Number | Phone | Fax |
| DECEASED |
531 CODISCO WAY SANFORD, FL 32771 |
CAC032448 (Exp: 08/31/2022) | (407)831-2665 | (407)333-3853 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/17/2020 | FINAL APPROVED | FWILLIS |
| U -UTILITY RESIDENTIAL FINAL | 04/17/2020 | APPROVED | AHALL |
| ROW - FINAL APRON (AFTER POUR) | 04/16/2020 | APPROVED | MMAJEWSKI |
| ROW - STORMWATER FINAL | 04/16/2020 | APPROVED | MMAJEWSKI |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/31/2020 | APPROVED | MMAJEWSKI |
| FINAL SURVEY (OFFICE USE ONLY) | 03/31/2020 | APPROVED | MMAJEWSKI |
| ELECTRIC - EARLY POWER | 03/20/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:00 am | |||
| ROW- PRE-APRON (PRE-POUR) | 02/05/2020 | APPROVED - AS NOTED | MMAJEWSKI |
| Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| U - SEWER TIE IN | 01/22/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 01/22/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 01/06/2020 | CANCELLED BY APPLICANT | JGIBSON |
| U - SEWER TIE IN | 01/06/2020 | CANCELLED BY APPLICANT | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 12/20/2019 | APPROVED | FWILLIS |
| INSULATION | 12/20/2019 | APPROVED | FWILLIS |
| ALL ROUGH | 12/17/2019 | APPROVED | FWILLIS |
| ELECTRIC-TUG | 12/16/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 9:30 | |||
| ROOF VALLEY & METAL | 12/09/2019 | APPROVED | FWILLIS |
| ELECTRIC-TUG | 12/05/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: UFER GROUND MISSING AND GROUNDING ELECTRODE CONDUCTOR NEC 250 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/03/2019 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 11/13/2019 | APPROVED | JDELBONIS |
| MONOLITHIC SLAB | 11/06/2019 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| WATER METER INSTALLATION REQUEST | 11/06/2019 | APPROVED | CSTONE |
| MONOLITHIC SLAB | 11/05/2019 | Disapproved - NO FEE | FWILLIS |
| Note: Dowel missing on right side as per plan. Highlighted on approved drawings. | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/01/2019 | APPROVED | JMUNSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/30/2019 | APPROVED | FWILLIS |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 11/01/2019 | 11/01/2019 |
| Note: Released By: JMUNSON | |||
| MECH | COMPLETE | 08/13/2019 | 08/13/2019 |
| Note: Released By: JHINDMAN | |||
| MECH | HOLD | 07/12/2019 | 07/12/2019 |
| Note: Held By: JHINDMAN 1. The heating equipment capacity does not meet the required load. 6th ed. FBC EC R405. 3rd request. This is the heating load not electrical calculations. | |||
| ZON | COMPLETE | 07/02/2019 | 07/02/2019 |
| Note: Released By: AMOBLEY | |||
| SW1 | COMPLETE | 07/02/2019 | 07/02/2019 |
| Note: Released By: JMUNSON | |||
| MECH | HOLD | 07/02/2019 | 07/09/2019 |
| Note: Held By: JHINDMAN 1. The heating equipment capacity does not meet the required load. 6th ed. FBC EC R405. 2nd request. | |||
| PLUM | COMPLETE | 07/02/2019 | 07/09/2019 |
| Note: Released By: JHINDMAN | |||
| SWALE | COMPLETE | 05/29/2019 | 06/14/2019 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 05/24/2019 | 06/03/2019 |
| Note: Released By: JHINDMAN | |||
| CUSVC | COMPLETE | 05/24/2019 | 05/28/2019 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 05/24/2019 | 06/03/2019 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 05/24/2019 | 05/29/2019 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 05/24/2019 | 05/29/2019 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 05/24/2019 | 06/03/2019 |
| Note: Held By: JHINDMAN 1. The heating equipment capacity does not meet the required load. 6th ed. FBC EC R405. | |||
| PLUM | HOLD | 05/24/2019 | 06/03/2019 |
| Note: Held By: JHINDMAN 1. Provide a plumbing riser signed by the plumbing contractor with their license number. 6th ed. FBC 107.1. | |||
| SW1 | HOLD | 05/24/2019 | 05/31/2019 |
| Note: Held By: JHINDMAN 1. Proposed drainage cannot flow onto adjacent properties ULDC Tech manual ch.5 300. | |||
| UD1 | COMPLETE | 05/24/2019 | 05/31/2019 |
| Note: Released By: AHALL | |||
| ZON | HOLD | 05/24/2019 | 05/28/2019 |
| Note: Held By: AMOBLEY Driveway width and material must be on the survey/site plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 05/06/2020 |
| REINSPECTION FEE | ¤40.00 | 02/18/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤494.00 | 09/09/2019 |
| SITE PLAN 20 | ¤20.00 | 09/09/2019 |
| SURCHARGE FS 533.721 | ¤11.59 | 09/09/2019 |
| SURCHARGE - FS 468.631 | ¤17.38 | 09/09/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/09/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤48.96) | 09/09/2019 |
| SEWER INSPECTION | ¤25.00 | 09/09/2019 |
| SEWER CAPITAL FACILITY | ¤4,515.25 | 09/09/2019 |
| WATER CAPITAL FACILITY FEE | ¤3,314.84 | 09/09/2019 |
| ELECTRIC FEE | ¤208.20 | 09/09/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 09/09/2019 |
| IMPACT FEE FIRE | ¤223.38 | 09/09/2019 |
| IMPACT FEE PARKS | ¤849.24 | 09/09/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 09/09/2019 |
| IMPACT FEE TRANSPORTATION | ¤1,632.00 | 09/09/2019 |
| MECHANICAL FEE | ¤208.20 | 09/09/2019 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/09/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 09/09/2019 |
| PLAN CHECK FEE | ¤98.80 | 09/09/2019 |
| PLUMBING FEE | ¤208.20 | 09/09/2019 |
| METER - DEPOSIT | ¤60.00 | 09/09/2019 |
| WATER- TURN ON | ¤25.00 | 09/09/2019 |
| ADMIN FEE | ¤20.00 | 09/09/2019 |
| CONNECTION FEES | ¤985.25 | 09/09/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,620.19 |