Permit #2019051084

Permit Details

Status: COED

Parcel Id: 07-11-31-7033-00170-0140
CONDITIONED SPACE: 2306 sqft
GARAGE: 466 sqft
OPENED PORCH (WITH ROOF) : 32 sqft
OPENED PORCH (WITH ROOF) : 138 sqft
Total Square Footage: 2942 sqft
Block: 00170
Subdivision: 2184 - SECTION 33-ROYAL PALMS
Job Phone: 407-307-4753
Location Address: 41 REGENCY DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/28/2019
NOC: RECORDED
Applicant name: SHAWN VIRAG
Owner: BRITE PROPERTIES LLC

Address

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

Lot: 0140
Contracted Stated Job Value: ¤148,359.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SHAWNTELLE CONSULTING AND DESIGN LLC
Status Location Address State License Number Phone
CANCEL

611 LARGOVISTA DR

OAKLAND, FL 34787

CBC1261160 (Exp: 08/31/2020) 407-307-4753

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/24/2020 FINAL APPROVED JCOLASANTI
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Front door and Bedroom Door not closing properly and latching, as per plan. 3/24/20 (3:10) Front door and rear sliding glass doors were locked at the time of my visit.
BLD - BUILDING FINAL 03/23/2020 Disapproved - NO FEE FWILLIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Front door and Bedroom Door not closing properly and latching, as per plan. 3/24/20 (3:10) Front door and rear sliding glass doors were locked at the time of my visit.
BLD - BUILDING FINAL 03/20/2020 CANCELLED BY APPLICANT JCOLASANTI
Note: THIS IS A REINSPECTION Front door and Bedroom Door not closing properly and latching, as per plan.
BLD - BUILDING FINAL 03/19/2020 Disapproved - NO FEE FWILLIS
Note: Front door and Bedroom Door not closing properly and latching, as per plan.
U -UTILITY RESIDENTIAL FINAL 03/19/2020 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 03/18/2020 APPROVED MMAJEWSKI
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION
ROW - STORMWATER FINAL 03/17/2020 Disapproved - NO FEE MMAJEWSKI
Note: THIS IS A REINSPECTION SWALE NEEDS TO BE REGRADED AND SODDED
ROW - FINAL APRON (AFTER POUR) 03/13/2020 APPROVED MMAJEWSKI
ROW FIELD SURVEY /GRADING CERTIFICATION 03/13/2020 APPROVED MMAJEWSKI
ROW - STORMWATER FINAL 03/13/2020 Disapproved - NO FEE MMAJEWSKI
Note: DUMPSTER NEEDS TO BE REMOVED AND ANY DAMAGE TO THE SWALE WILL NEED TO BE REPAIRED
FINAL SURVEY (OFFICE USE ONLY) 03/13/2020 APPROVED MMAJEWSKI
ELECTRIC - EARLY POWER 03/13/2020 APPROVED - AS NOTED JMUNSON
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Cancelled by contractor ALL DOORS LOCKED Above items were taken care of. Emailed FPL at 11:35 am
ELECTRIC - EARLY POWER 03/12/2020 Disapproved - NO FEE RMARTIN
Note: THIS IS A REINSPECTION Cancelled by contractor ALL DOORS LOCKED
ELECTRIC - EARLY POWER 03/11/2020 CANCELLED BY APPLICANT JMUNSON
Note: Cancelled by contractor
ROW- PRE-APRON (PRE-POUR) 02/19/2020 APPROVED - AS NOTED KHOWELL
Note: It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
GRAVITY SEWER TEST 02/14/2020 APPROVED JGIBSON
U - SEWER TIE IN 02/14/2020 APPROVED JGIBSON
LATH/BRICK/ WATER BARRIER 01/17/2020 APPROVED WMILLER
Note: THIS WAS ASSIGNED TO INSPECTOR FW BUT I WAS CLOSER AND TOOK THE INSPECTION. THE RESULT IS APPROVED
PEP TANK INSTALLATION REQUEST 12/30/2019 APPROVED CSTONE
INSULATION 12/30/2019 APPROVED FWILLIS
INSULATION 12/27/2019 CANCELLED BY APPLICANT WEB
ALL ROUGH 12/23/2019 APPROVED FWILLIS
Note: THIS IS A REINSPECTION
ALL ROUGH 12/20/2019 CANCELLED BY APPLICANT JDELBONIS
ROOF VALLEY & METAL 12/03/2019 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION
ROOF VALLEY & METAL 12/02/2019 Disapproved - NO FEE FWILLIS
Note: Not dryed in, flashing not complete and no roofers on site.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/25/2019 APPROVED FWILLIS
ELECTRIC-TUG 11/21/2019 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:20
ELECTRIC-TUG 11/15/2019 Disapproved - NO FEE RMARTIN
Note: PVC NOT CONNECTED TO MA. AT SERVICE NEC 2014 ART 352.48
TIE BEAM / LINTEL 11/13/2019 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 11/12/2019 Disapproved -FEE REQUIRED WMILLER
Note: PROTECTION FOR REINFORCEMENT (6TH EDITION) R606.3.4 REINFORCING BARS USED IN MASONRY WALLS SHALL HAVE NOT LESS THAN 2 inches FOR MASONRY UNITS WITH FACE EXPOSED TO EARTH OR WEATHER (marked on foundation page)
MONOLITHIC SLAB 11/05/2019 APPROVED FWILLIS
Note: THIS IS A REINSPECTION
FOUND SURVEY APPROVED (OFFICE) 11/05/2019 APPROVED JMUNSON
MONOLITHIC SLAB 11/04/2019 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION Dowels Rebar And plastic not installed as per plan. (failed previous inspection for the same thing.)
MONOLITHIC SLAB 11/01/2019 Disapproved -FEE REQUIRED FWILLIS
Note: No dowels or rebar installed as outlined on approved drawings.
PLUMBING 1ST ROUGH UNDERGROUND 10/31/2019 APPROVED FWILLIS
WATER METER INSTALLATION REQUEST 09/09/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
SW1 COMPLETE 11/05/2019 11/05/2019
Note: Released By: JMUNSON Foundation Survey
ZON COMPLETE 06/27/2019 06/28/2019
Note: Released By: AMOBLEY
SW1 COMPLETE 06/27/2019 06/28/2019
Note: Released By: JMUNSON
PLUM COMPLETE 06/27/2019 07/08/2019
Note: Released By: JHINDMAN
SWALE COMPLETE 05/29/2019 06/10/2019
Note: Released By: TBAKER
BLD COMPLETE 05/24/2019 06/03/2019
Note: Released By: JHINDMAN
CUSVC COMPLETE 05/24/2019 05/28/2019
Note: Released By: HHAND
ELEC COMPLETE 05/24/2019 06/03/2019
Note: Released By: JHINDMAN
ENGIN1 COMPLETE 05/24/2019 05/29/2019
Note: Released By: TBAKER
LOCATE COMPLETE 05/24/2019 05/30/2019
Note: Released By: CSTONE
MECH COMPLETE 05/24/2019 06/03/2019
Note: Released By: JHINDMAN
PLUM HOLD 05/24/2019 06/03/2019
Note: Held By: JHINDMAN 1. Provide a plumbing riser signed by the plumbing contractor with their license number. 6th ed. fbc 107.1.
SW1 HOLD 05/24/2019 06/03/2019
Note: Held By: JHINDMAN 1. remove septic tank and drainfield from site plan and provide proposed elevations per sec5 300 ULDC Tech manual. Finished Floor Elevation (FFE) of the living area of improved structures on adjacent lots. (4) The elevations on all adjacent properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. (5) The elevations at 20 foot intervals along all property lines. (6) The interior elevations at no greater than a 20 foot grid. Also provide proposed elevations at the house slab to verify the slope away from the foundation per 6th ed. FBC R 401.3.
UD1 COMPLETE 05/24/2019 05/31/2019
Note: Released By: AHALL
ZON HOLD 05/24/2019 05/28/2019
Note: Held By: AMOBLEY Site plan and landscape plan layout does not match layout on blueprints

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 02/21/2020
REINSPECTION FEE ¤40.00 02/21/2020
REINSPECTION FEE ¤40.00 02/21/2020
NEW RESIDENTIAL INSPECTIONS ¤564.00 08/28/2019
SITE PLAN 20 ¤20.00 08/28/2019
SURCHARGE FS 533.721 ¤12.92 08/28/2019
SURCHARGE - FS 468.631 ¤19.37 08/28/2019
STORM WATER PERMIT FEES ¤80.00 08/28/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 08/28/2019
SEWER CREDIT (¤2,932.00) 08/28/2019
SEWER INSPECTION ¤25.00 08/28/2019
SEWER CAPITAL FACILITY ¤4,515.25 08/28/2019
WATER CAPITAL FACILITY FEE ¤3,314.84 08/28/2019
METER - DEPOSIT ¤60.00 08/28/2019
WATER- TURN ON ¤25.00 08/28/2019
ADMIN FEE ¤20.00 08/28/2019
CONNECTION FEES ¤985.25 08/28/2019
ELECTRIC FEE ¤229.20 08/28/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 08/28/2019
IMPACT FEE FIRE ¤223.38 08/28/2019
IMPACT FEE PARKS ¤849.24 08/28/2019
IMPACT FEE SCHOOL ¤3,600.00 08/28/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 08/28/2019
MECHANICAL FEE ¤229.20 08/28/2019
WATER -IRRIGATION INSPECTION ¤25.00 08/28/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 08/28/2019
PLAN CHECK FEE ¤112.80 08/28/2019
PLUMBING FEE ¤229.20 08/28/2019
Fees Total Due: ¤0.00 Total Paid: ¤13,878.51