Permit #2019051091

Permit Details

Status: COED

Parcel Id: 07-11-31-7031-00530-0150
CONDITIONED SPACE: 2306 sqft
GARAGE: 466 sqft
OPENED PORCH (WITH ROOF) : 138 sqft
OPENED PORCH (WITH ROOF) : 32 sqft
Total Square Footage: 2942 sqft
Block: 00530
Subdivision: 2166 - SECTION 31-ROYAL PALMS
Job Phone: 407-307-4753
Location Address: 62 RIVERINA DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/31/2019
NOC: RECORDED
Applicant name: SHAWN VIRAG
Owner: BRITE PROPERTIES OF FLORIDA LLC

Address

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

Lot: 0150
Contracted Stated Job Value: ¤148,359.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SHAWNTELLE CONSULTING AND DESIGN LLC
Status Location Address State License Number Phone
CANCEL

611 LARGOVISTA DR

OAKLAND, FL 34787

CBC1261160 (Exp: 08/31/2020) 407-307-4753

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ROBERT G DELLO RUSSO
Status Location Address State License Number Phone Fax
DECEASED

531 CODISCO WAY

SANFORD, FL 32771

CAC032448 (Exp: 08/31/2022) (407)831-2665 (407)333-3853

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/25/2020 FINAL APPROVED JDELBONIS
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Electrical cables must be protectedlocated withen 6' of the attic access hole NEC 334.23.....seal holes above electric box at water heater and AHU closet whip...need to mark MOCP at AHU....need to seal air exhaust duct at ceiling AHU closet....need wheather striping garage service door....arch vault #16 not working correctly, plugs in kitchen not tripping
BLD - BUILDING FINAL 03/24/2020 Disapproved -FEE REQUIRED JCOLASANTI
Note: THIS IS A REINSPECTION Electrical cables must be protectedlocated withen 6' of the attic access hole NEC 334.23.....seal holes above electric box at water heater and AHU closet whip...need to mark MOCP at AHU....need to seal air exhaust duct at ceiling AHU closet....need wheather striping garage service door....arch vault #16 not working correctly, plugs in kitchen not tripping
BLD - BUILDING FINAL 03/20/2020 CANCELLED BY APPLICANT JCOLASANTI
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION
BLD - BUILDING FINAL 03/17/2020 CANCELLED BY APPLICANT FWILLIS
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 03/17/2020 FINAL APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION pep tank hardware not yet installed-utilities informed
U -UTILITY RESIDENTIAL FINAL 03/16/2020 CANCELLED BY APPLICANT LFITZGERALD
Note: pep tank hardware not yet installed-utilities informed
BLD - BUILDING FINAL 03/16/2020 CANCELLED BY APPLICANT FWILLIS
ROW - STORMWATER FINAL 03/13/2020 APPROVED MMAJEWSKI
ROW - FINAL APRON (AFTER POUR) 03/13/2020 APPROVED MMAJEWSKI
ELECTRIC - EARLY POWER 03/13/2020 APPROVED - AS NOTED JMUNSON
Note: Emailed FPL at 10:15 am
FINAL SURVEY (OFFICE USE ONLY) 03/09/2020 APPROVED MMAJEWSKI
ROW FIELD SURVEY /GRADING CERTIFICATION 03/09/2020 APPROVED MMAJEWSKI
U - SEWER TIE IN 02/18/2020 APPROVED JGIBSON
GRAVITY SEWER TEST 02/18/2020 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 01/30/2020 APPROVED - AS NOTED MMAJEWSKI
Note: IT IS THE BUILDER’S RESPONSIBILITY: TO RECHECK ELEVATIONS AND PIPE SIZE, TO INSURE THAT AN OBSTRUCTION DOES NOT EXIST UPSTREAM AND OR DOWNSTREAM, THAT THE CULVERT PIPE IS SET TO AND OR FOLLOWS THE SWALE PLAN, FORM THE DRIVEWAY TO THE APPROVEDSITE PLAN AND FOLLOW THE APPROVED DRIVEWAY DETAIL SHEET PROVIDED BY THE CITY OF PALM COAST. PRIOR TO PLACEMENT OF CONCRETE. CONCRETE ALONG EDGE OF GARAGE NEEDS TO BE REMOVED
LATH/BRICK/ WATER BARRIER 01/17/2020 APPROVED FWILLIS
PEP TANK INSTALLATION REQUEST 12/30/2019 APPROVED CSTONE
INSULATION 12/27/2019 APPROVED FWILLIS
Note: 5' of head pressure missing and SGD on site but not installed. Will check on next inspection.
ALL ROUGH 12/20/2019 APPROVED JDELBONIS
ROOF VALLEY & METAL 12/20/2019 APPROVED JDELBONIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/09/2019 APPROVED - AS NOTED FWILLIS
Note: THIS IS A REINSPECTION Truss R08 2ply in garage, reto fitted strap missing Tapcons. 2X12 on Lanai, need to verify hanger connections. Will Inspect on next Inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/04/2019 Disapproved -FEE REQUIRED FWILLIS
Note: THIS IS A REINSPECTION Roof is not complete, entryway and front room open.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/02/2019 CANCELLED BY APPLICANT JDELBONIS
ELECTRIC-TUG 11/21/2019 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 12:40
TIE BEAM / LINTEL 11/19/2019 APPROVED FWILLIS
MONOLITHIC SLAB 11/08/2019 Disapproved -FEE REQUIRED FWILLIS
Note: Not ready. Nothing layed out or installed.
MONOLITHIC SLAB 11/08/2019 APPROVED JDELBONIS
Note: THIS IS A REINSPECTION
FOUND SURVEY APPROVED (OFFICE) 11/05/2019 APPROVED JMUNSON
PLUMBING 1ST ROUGH UNDERGROUND 11/01/2019 APPROVED FWILLIS
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 10/30/2019 Disapproved -FEE REQUIRED FWILLIS
Note: No approved plans on site. Must include Riser approved drawing. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL
WATER METER INSTALLATION REQUEST 09/26/2019 APPROVED CSTONE

Review History

Department Status Date In Date Out
SW1 COMPLETE 11/05/2019 11/05/2019
Note: Released By: JMUNSON Foundation
ZON COMPLETE 06/24/2019 06/24/2019
Note: Released By: AMOBLEY
SW1 COMPLETE 06/24/2019 06/24/2019
Note: Released By: JMUNSON
PLUM COMPLETE 06/24/2019 07/01/2019
Note: Released By: JHINDMAN
SWALE COMPLETE 05/29/2019 06/24/2019
Note: Released By: TBAKER
BLD COMPLETE 05/24/2019 06/03/2019
Note: Released By: JHINDMAN
CUSVC COMPLETE 05/24/2019 05/28/2019
Note: Released By: HHAND
ELEC COMPLETE 05/24/2019 06/03/2019
Note: Released By: JHINDMAN
ENGIN1 COMPLETE 05/24/2019 05/29/2019
Note: Released By: TBAKER
LOCATE COMPLETE 05/24/2019 05/30/2019
Note: Released By: CSTONE
MECH COMPLETE 05/24/2019 06/03/2019
Note: Released By: JHINDMAN
PLUM HOLD 05/24/2019 06/03/2019
Note: Held By: JHINDMAN 1. Provide a plumbing riser signed by the plumbing contractor with their license number. 6th ed. FBC 107.1.
SW1 HOLD 05/24/2019 05/31/2019
Note: Held By: JHINDMAN 1. remove septic tank and drainfield from site plan and provide proposed elevations per sec5 300 ULDC Tech manual. Finished Floor Elevation (FFE) of the living area of improved structures on adjacent lots. (4) The elevations on all adjacent properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. (5) The elevations at 20 foot intervals along all property lines. (6) The interior elevations at no greater than a 20 foot grid. Also provide proposed elevations at the house slab to verify the slope away from the foundation per 6th ed. FBC R 401.3.
UD1 COMPLETE 05/24/2019 05/31/2019
Note: Released By: AHALL
ZON HOLD 05/24/2019 05/29/2019
Note: Held By: ELENS 1. Please list paint manufacturer and correct LRVs for the exterior and garage on the color sheet. 2. Please add driveway width and material to the site plan

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 04/22/2020
REINSPECTION FEE ¤40.00 02/21/2020
REINSPECTION FEE ¤40.00 02/21/2020
REINSPECTION FEE ¤40.00 02/21/2020
NEW RESIDENTIAL INSPECTIONS ¤564.00 07/31/2019
SITE PLAN 20 ¤20.00 07/31/2019
SURCHARGE FS 533.721 ¤12.92 07/31/2019
SURCHARGE - FS 468.631 ¤19.37 07/31/2019
STORM WATER PERMIT FEES ¤80.00 07/31/2019
3% TRANS IMPACT FEE CREDIT (¤48.96) 07/31/2019
SEWER CREDIT (¤1,342.00) 07/31/2019
SEWER INSPECTION ¤25.00 07/31/2019
SEWER CAPITAL FACILITY ¤4,515.25 07/31/2019
WATER CAPITAL FACILITY FEE ¤3,314.84 07/31/2019
METER - DEPOSIT ¤60.00 07/31/2019
WATER- TURN ON ¤25.00 07/31/2019
ADMIN FEE ¤20.00 07/31/2019
CONNECTION FEES ¤985.25 07/31/2019
ELECTRIC FEE ¤229.20 07/31/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 07/31/2019
IMPACT FEE FIRE ¤223.38 07/31/2019
IMPACT FEE PARKS ¤849.24 07/31/2019
IMPACT FEE SCHOOL ¤3,600.00 07/31/2019
IMPACT FEE TRANSPORTATION ¤1,632.00 07/31/2019
MECHANICAL FEE ¤229.20 07/31/2019
WATER -IRRIGATION INSPECTION ¤25.00 07/31/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 07/31/2019
PLAN CHECK FEE ¤112.80 07/31/2019
PLUMBING FEE ¤229.20 07/31/2019
Fees Total Due: ¤0.00 Total Paid: ¤15,508.51